Summary of 850716 Meeting W/Doe,Golder Assoc,Ebasco Svc,Inc, RM Parsons,Bnwl & Lowenberg Assoc,Inc in Silver Spring,Md Re DOE Proposal for Monitored Retrievable Storage Plant.Reg Guides Considered for Applicability
ML20133C410
Person / Time
Issue date: 07/26/1985
From: Clark A
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-PROJ-M-38 NUDOCS 8508070038
Download: ML20133C410 (5)


Text

.

l

_ m -

%;f:3 9 JW.2i M Project t'-38 PEPORAtlDU" FOR: Leland C. Rouse, Chief, Advanced Fuel and Spent Fuel Licensing Franch FROM: A. Thomas Clark, Jr.

Advanced Fuel and Spent Fuel Licensing Branch i o

SUEJECT: FEETIMG ON APPLICABILITY OF !!RC GUIDES TO LICEHSIt'G OF FRS In connection with the NRC's consultative role with the Department of Energy on their proposal for nonitored retrievable storage (URS) NRC staff members and consultants net with DOE staff and consultants. A list of neetino attendees and the agenda are attached. The meetino was held on July 16, 1985 at MRC offices in Silver Spring, Maryland.

A monitored retrievable storage plant is similar in nature to an independent spent fuel storage installation (IFSFI), which is licensed by the !!RC pursuant to 10 CFR Part 72. The NRC staff is currently modifying 10 CFR Part 72 to include PRS considerations. The NPC usually prepares guides for regulatory activities which are prevalent throughout the nuclear industry. Since there may only be one, or at most two, "RS plants, the preparation of specific guides for such a plant may not be necessary. At this meetiro all MPC regula-tory guides were considered for their applicability to an MRS. A broad consensus was achieved on either the complete exclusion or inclusion of many guides.

Several steps were followed to review the guides. In the initial step only the guides listed in Table 1 in Regulatory Guide 3.53 were considered.

These guides (or sections of then) have been considered for use for an ISFSI.

The following guides were considered to be inappropriate because of a parallel Division 3 (fuel cycle) guide or too direct an application to a nuclear power plant: R .G . 1.25, 1.59, 1.12 5, 1.29, 1.69, 1.22, a nd 1.143.

In the second step all regulatory guides (except those in R.G. 3.53) were considered. EBASCO had prepared a draft regulatory guide applicability report which contained a table categorizing each guide as to applicability.

The group collectively perforned a further assessnent of the list. A few guides which were listed as "not applicable" were restored by the group for further consideration. They are: R.G. 1.3, 1.68.3, 1.86, 1.115, 1.151, 3.3, 3.7, 3.10, 4.2, a .2.1, 4.9, 7.1, 7.10, 8.21, a nd 9.24.

Another group of quides which were felt to not be applicable, principally because of their specificity to non-fuel storage activities were as follows:

R.G. 1.8, 1.12, 1.16, 1.22, 1.26, 1.24, 1.31, 1.34, 1.43, 1.44, 1.50, 1.52, 1.54, 1.59, 1.71, 1.95, 1.93, 1.101, 1.120, 1.125, 1.lan, 1.147, 1.150, 3.32, 3.38, 3.43, 5.14, 5.16, 5.17, 5.19, 5.29, 5.43, 5.57, 5.61, and 8.20.

I I

"'C'> .... 850B070038 850726 ..

PDR PROJ summut) - -

M-38 PDR .

DATEf .. .. . . . . . ..

. . l. .

NRCFORM 318110 801 N R C M 014 C OFFICIAL RECORD COPY * "S o "o 2 S 8 3 -*o o-2 4 7

NIMN$@#N$hN@ g k l Leland C. Rouse All P 61985 Another set of guides needed further special consideration because the staff's evaluation of DOE's plans for an VRS is incomplete. These guides were related to electrical power resources, safeguards accountability, and quality ,

assurance. A resolution of the applicability of these guides is expected -

within two months. They are: R.G. 1.6, 1.9, 1.30, 1.32, 1.38, 1.39, 1.64, ,

1.75, 1.88, 1.89, 1.94, 1.100, 1.108, 1.116, 1.123, 1.131, 1.144, 1.146, 3.21, 5.1, 5.5, 5.6, 5.9, 5.11, 5.33, 5.34, 5.36, 5.39, 5.42, 5.45, 5.51, 5.53, and 5.58.

A few other guides will be reviewed further for various reasons. Tky are:

R.G. 1.58, 1.69, 1.102, 1.110, 1.117, 3.19, 3.20, 3.31, 3.42, 4.15, 8.19, and 8.27.

There still remains some doubt in the writer's mind as to the applicability of some of the remaining guides. There wi'l be further consideration of the following guides: R.C. 1.17, 1.21, 1.47, 1.53, 1.62, 1.97, 1.105, 1.106, 1.112, 1.128, 1.129, 1.136, 1.148, and 3.17.

The representatives from the Office of Research (NRC) provided a listing of current ISFSI and MRS tasks on guides all of which should apply to the PRS. The list is attached.

l b-:  ; . n.nr l

rn. .

1 l

A. Thomas Clark, Jr.

Advanced Fuel and Spent Fuel Licensing Branch

Enclosures:

As stated l DISTRIBUTION:

l NMSS r/f FCAF r/f f Project File M-38 & PDR KG5teyer -

MWeinstein

( WPearson JRoberts NDavison JSchneider FForscher KGreenaugh ATClark(5)

LA File

/)

o'"c'> .EC.A.E AfC, .., .ECRE . . ........ ........... . . .... ....... ... ......... .......... .......... ............ ....... ....................

  • =^"5> .AT,C,1,a,r,k,,: j,1,, ,g R,o, , ,

oan) 7./.2t. ./. 8 5. .7/.$..l

. .. . ... . . ../.85f .. . ........... ..................... .......... ..... .... .............. ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

N OFFICIAL RECORD COPY

  • u. m nea-4oo-247 L. .RC

. . . - FORM

. ,, 318 ttO/80l NRCM O240. .

. co m

ATTENDANCE 7

NAME ORGANIZATION J. W. Voss Golder Associates

0. F. Hill Consultant - NRC:NMSS L. D. Schlesinger Ebasco Service, Inc.

H. L. Rothstein Ebasco Service, Inc.

Frederick Forscher NRC/IE-QA R. E. Heineman Battelle - PNL George S. Rokkan DOE-RL Dave Woods Ralph M. Parsons Dick Williams Ralph M. Parsons Anita Jowdt Ralph M. Parsons Homer Lowenberg Lowenberg Associates, Inc.

Norman Ketzlach NRC:NMSS Tom Clark NRC:NMSS John P. Roberts NRC:NMSS W. R. Pearson NRC:RES Martin Weinstein NRC:RES Norman H. Davison NRC:NMSS Jim Schneider NRC:NMSS ,

[

N

J ISFSI AND MRS RELATED GUIDES

1. Task #CE-301-4," Standard Format and Content for the Safety Analysis Report for Onsite Storage of Spent Fuel Casks" -

Status: At editing;new guide to be issued for comment; 8/85.

2. Task #CE-306-4," Standard Format and Content for a Topical Safety Analysis Report for a Dry Spent Fuel Storage Cask" Status: At editing;new guide to be issued for comment; 8/85.
3. Task #CE-402-4," Guidance on Preparaing a License Application to Store Spent Fuel and High-Level Waste" Status: Revision 1 of RG 3.50; at editing; issue for comment 9/85.
4. Task #CE-403-4,"Standar Format and Content for the Safety Analysis Report for an Indepent Spent Fuel Storage Insa11ation(Water-Basin Type)"

Status: Revision 2 of RG 3.44; issue for comment'12/85.

5. Task #CE-406-4," Standard Format and Content for the Safety Analysis Report for an Indepent Spent Fuel Storage Installation (Dry Storage)"

Status: Revision 1 of RG 3.48; issue for comment 11/85.

6. Task #CE-410-4," Design of Independent Spent Fuel Storage Installation (Dry Type)"

Status: Endorses ANSI /ANS 57.9," Design Criteria for an Independent Spent Fuel Storage Installation (Dry Storage Type)";

task leader is F. Cardile(Chemical Engineering Branch);

guide is at editing; planned to issue for comment 8/85.

7. Task #CE-412-4," Applicability of Existing Regulatory Guides to the Design and Operation of Installations for the Independent Storage of Spent Nuclear Fuel and High-Level Waste" Status: Revision of,RG 3.53; task leader is M.Keinstein(Chemical Engineering Branch);at Division review step; to be issued for comment.

}{g ngBR.

I 1

L

MEETING AGENDA NRC REVIEW 0F GUIDES, AND STANDARDS FOR PART 72 APPLICATION Date: July 16,1985 Time: 8:30 a.m. EDT to 4:30 p.m. EDT Location: 5th floor conference room (517)

Willste Building, Silver Spring, MD

Participants:

DOE and/or contractors (R. M. Parsons, PNL)

NRC--FCAF (NMSS) and CEB (RES)

EBASCO

Purpose:

To review applicability of existing and proposed guides to MRS safety.

Meeting Conduct: The most important aspect of this meeting is to subject each guide to brief review by all present, not necessarily exhaustively debate each question. Therefore, aral comment will be limited to two minutes per partic' pant and no more than 10 minutes per subject as shown in left-hand column of R.G. 3.53, Table 1. Written comments will be accepted. Preparation for the meeting is encouraged.

-