ML20134B913

From kanterella
Revision as of 02:26, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Std Order for DOE Work: Licensing Program Support - Environ Review Assistance
ML20134B913
Person / Time
Issue date: 12/01/1983
From: Brown R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rauch H
ENERGY, DEPT. OF
Shared Package
ML20134B861 List: ... further results
References
CON-FIN-A-2157, FOIA-85-438 NUDOCS 8508160136
Download: ML20134B913 (4)


Text

e n-P[( ,

,9'" Q .mWK5.iyi yr $7 15/A-9 Distribution:

NMSS 3.5 (A2157)

NMSS r/f RWidle, FC DEC 011983 iWNixon, FCUF, RPage, FCUF LPortner, RM/BP DDandois, RM/AF0 Mr. Hilary J. Rauch, Manager CSeelig Chicago Operations Office EDavis U. S. Department of Energy 9800 South Cass Avenue Argonne Illinois 11973

Dear Mr. Rauch:

The enclosed NRC Form 173, Standard Order for DOE Work (S0EW), is submitted in accordance with Section III.B.2. of the DOE /NRC Memorandum of Understanding of February 24, 1978.

A revised proposal is requested from Argonne National Laboratory to continue contractual assistance for FIN A2157, with estimated costs for hearing support as delineated in the statement of work attached to SOEW 50-83-01 dated 10/01/82.

Please indicate DOE acceptance by signing and returning the enclosed NRC Form 173 to the NRC Office of Resource Management, Division of Accounting and Finance, with a copy to this office.

If you have any questions please contact Claudia Seelig (FTS 427-4072).

Thank you for your assistance.

Sincerely, R. S. Brown, Jr., Assistant to the Director and Chief, Program Support Branch, HMSS

Enclosure:

SOEW 50-84-22 cc: R. Barber, EP This letter commits $100K of FY84 funds to A 2157, B&R 50-19-01-00.

8508160136 850710 PDR FOIA E RAPKIN85-438 PDR sbr n, Jr.

j ) 1.2// /83

~ = > NMSS:PS,Bk,

. N,M.S S,gS,B,,, ,, . FCU,F ,,F@ .. . fC.[.. O.k. . .F.C.............. NMMSB. ... ..

~+ .Epavj s:m1 {, CSeel,1,9,,,,,,,,, ,WNi (,,,g,,, RP%,,,,,,

, ,,, , , ,,, ,,, ,RW1,1#,, ,,,, JGNfME, J S A s........

  • > 11(.'. 83,,,,,, .W,$8,3,,,, ... ,1f,/yl,83,,,,,,,, O /.$/,S,3,,, ... l!ff.QB.S.,,,, .11./.h/B3. . ... . l.4/. .I ./.8,3 ,,,,,

a: mnu sia no,sc> ecu o24o

  • u.s. apo 29 3-4o0 2.

OFFICIAL RECORD COPY WY

-1 f NRC FOCM 173A U S. NUCLE AR QEGULAVORY COMMISSIOM OQOE Q NUMBEQ (5 83) 50-84-22 STANDARD ORDER FOR INTERAGENCY WORK DEC 011983 ISSUED TO: ( Agency) ISSUED BY: (NRC Offece) ACCOUNTING CITATION Chicago Operations Office Office of Nuclear Material APPROPRI ATION SYMBOL Safety and Safeguards (NMSS) 31X0200.503 B&R NUMBER PERFORMING ORGANIZATION AND LOCATION 50-19-01-01 Argonne National Laboratory riNNuuseR Argonne, Illinois 60439 A 2157-3 WORK PERIOD THIS ORDER FIN TITLE FIXED 10 ESTIMATED 0 Licensing Program Support - Environmental Review Assistance g{5/83 10/15/84 .

OBLIGATION AVAILABILITY PROVIDED BY:

A. THIS ORDER 5 0

8. TOTAL OF ORDERS PLACED PRIOR TO THis OATE WITH THE PERFORMING ORGANIZATION u,N,gR "*

Nu '/si$"'i !>"NOl' ATI e

N SYMBOL" AND THE FIRST FOUR DIGITS OF THE S 68,200 C. TOTAL ORDERS TO DATE (TOTAL A & B) s 68,200 D. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUMBE R" CITED IN THIS OR DER. S FINANCIAL FLEX 1BILITY:

@ FUNDS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED.

O FUNDS MAY BE REPROGRAMMED NOT TO EXCEED 110% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED.

STANDARD TERMS AND CONDITIONS PROVIDED THE PERFORMING ORGANIZATION ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED. ALL ACCEPTING AGENCY CONTRACT PROVISIONS ARE ACCEPTED BY NRC.

ATTACHMENTS:

THE FOLLOWING ATTACHMENTS ARE HEREBY SECURITY:

MADE A PART OF THIS ORDER: G WORK ON THIS ORDER IS NOT CLASSIFIED.

O STATEMENT OF WOR K O WORK ON THIS ORDER INVOLVES CLASSIFIED O ADDITIONALTERMS AND CONDITIONS INFORMATION. NRC FORM 187 IS ATTACHED.

O OTHER REMARKS: Ovork under this interagency agreement is authorized puavant to P.L.93-438.)

Reference SOEW 50-83-01, dated 10/1/82.

This order extends the period of performance for this project to 10/15/84.

This project is to provide hearing support as delineated in the statement of work '

attached to the referenced SOEW. Per conversation with W.A. Nixon (NRC Project Manager) and P.F. Gustafson (ANL) on 11/29/83, we request you submit a revised Form 109 within 45 days of this order based on the statement of work attached to the referenced SOEW to the Office Director, NMSS, (ATTN: Program Support) in six copies. We estimate the level fogfor this goject to be approximately 10 staff months.

\\) X /tS$UING AUTHC BITY ACCEPTING ORGANIZATION StGNATURE\\\f g SIG N A TUR E RI. S. Brown, Jr. v TITLE Assistant to the Director and Chief, TITLE Program Support Branch, NMSS D A TE NRC FO RM 173A (5 -8 3 )

r

_. ** ( '

\

( 10/2/79

, . Attachment 2 C PROPOSAL CONTENT The minimum items required in all proposais are:

1. Performing Organization's Name and Location ,'
2. FIN Title (as on statement of work) -
3. FIN Number
4. B&R Number (NRC's)
5. Performing organization's key personnel, program manager, or -

principal investigator, and FTS phone number.

6. Background (include previous technical progress if a continuation, and relationship to other projects).
7. Work to be Perf~ormed (Provide a concise description of tasks to be performed and expected results for the period of performance.

Identify major subcontracts, including consultants. Note technical data requirements, potential problems, and other technical information needed to fully explain the effort. Highlight changes from prior authorized 50W's if any, identifying changes in performance, schedule, orcosts).

~

'B. Costs estimated to be incurred by DDE contractors, subcontractors, and consultants (list by fiscal year to completion):

a. Manyears of Technical Support (MTS)
b. Costs:

(1) Direct Salaries (Labor) for MTS (2) Material and Services (excluding ADP)

(3) Total ADP Support (4) Subcontracts (5) Capital Equipment (6) Direct Travel Expense (foreign travel must be shown separately)

(7) General and Administrative Expense (include indirect labor cost) t .

c. Total Estimated Cost:

e

(

r .

. - ..z.
9. Forecasts: -
a. Milestone Chart for accomplishing the work.
b. Planned monthly rate of costs for first fiscal year. This may be pr6vided with the first report of an authorized program if not known at time of proposal submittal. At the beginning of each~ subsequent year, reports should include the planned monthly rate of costs' .for

< /

the ensuing year. ..

10. Conflict of Interest,:

In order to assist the Commission in its evaluation, the DDE Contracting Officer shall describe any significarit contractual and organizational relationships of the DOE, its contractor, their employees, or expected subcontractors or consultants on this proposal, with industries regulated by the NRC (e.g. utilities, etc.) and suppliers thereof (e.g. architect engineers and reactor manufacturers, etc.) that might give . rise to an apparent or actual conflict of interest.

e h

. e o

e j

= =-

E e

r ---. -. -- ,- . , - . , . - , a