Notice of Issuance of Director'S Decision 85-13 Under 10CFR2.206,denying Nietubicz Request That Legal Action to Rectify Alleged Lack of Viable Evacuation Routes Under Flood Conditions for Certain Areas Near Facility Be Taken
ML20134D175
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/12/1985
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML20134D168 List:
References
2.206, DD-85-13, NUDOCS 8508190130
Download: ML20134D175 (2)


Text

a 3

7590-01 U.S. NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-341 FERMI-2 NOTICE OF ISSUANCE OF A DIRECTOR'S DECISION UNDER 10 CFR 2.206 Notice is hereby given that the Director, Office of Inspection and Enforcement, has issued a decision pursuant to 10 CFR 2.206 concerning a petition filed by Stanley Nietubicz. The Petitioner requested.that the Commission institute legal action to rectify the alleged lack of viable evacuation routes under flood conditions for certain areas near the Fermi-2 facility.

After considering the Petitioner's request, the staff has determined that adequate measures have been taken to resolve the issue raised by the Petitioner.

The reasons for this decision are more fully explained in the " Director's Decision Under 10 CFR 2.206" (DD-85-13) issued today. A copy of this decision will be available for public inspection in the Commission's Public Document Room at 1717 H Street, N.W., Washington, DC 20555 and in the local public document room at the Monroe County Library, Reference Department, 3700 South Custer Road, Monroe, Michigan 41861.

l A copy of the decision will be filed with the Secretary of the Connission for Commission review in accordance with 10 CFR 2.206(c). As provided in 10 CFR 8508190130 850812 1:

ADOCK 05 gDR l

m

a 2.206(c), the decision will become the final action of the Commission 25 days after issuance, unless the Commission, on its own motion, decides to review that decision.

Dated at Bethesda, Maryland, this 12th day of August 1985.

FOR THE NUCLEAR REGULATORY COMMISSION