ML20135E944

From kanterella
Revision as of 07:11, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-295/85-28 & 50-304/85-29 on 850806-0903.No Violations Noted
ML20135E944
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/13/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20135E948 List:
References
NUDOCS 8509170100
Download: ML20135E944 (2)


See also: IR 05000295/1985028

Text

- .- . - -_--

,

SEP 1 3 G85

Docket No. 50-295

Docket No. 50-304

Commonwealth Ediscn Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by NRC inspectors

M. M. Holzmer, L. E Kanter and J. N. Kish of this office on August 6 thrcugh

,

September 3, 1985, of activities at the Zion Nuclear Generating Station

'

authorized by Licenses No. DPR-39 and No. DPR-48 and to the discussion of

our findings with Mr. K. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

4

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N.J. Chrissotimos, Chief

Projects Branch 2

Enclosure: Inspection Reports

No. 50-295/85028(DRP);

No. 50-304/85029(DRP)

See Attached Distribution

8509170100 850913

PDR ADOCK 05000295

G PDR

8((

--, - . . - __ . _ - -

. . . - .. -. . -- . . - . ..

.. .

Commonwealth Edison Company 2 SEP ' 3 085  !

Distribution

cc w/ enclosure:

D. L. Farrar, Director

i'

- of Nuclear Licensing

K. L. Graesser, Plant Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

. Phyllis Dunton, Attorney

4 General's Office, Environ- -

mental Control Division

Mayor, City of Zion

1

i

!

i

i

4

e

4

RIII Rtu RIII

reann/rr Su ChrMsotimos

09/R T85

/3

_ ..- _ - , ,_ -.. _. . . . _ _ _ _ , _ , , , . _ . . -

. . -. _ _ , _ -

.,. .