IR 05000005/1985002

From kanterella
Revision as of 16:25, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Physical Security Insp Rept 50-005/85-02 on 850626-27. Noncompliance Noted:Facility Insp Not Conducted Per Security Plan & Failure to Have Alarm Switches.Details Deleted (Ref 10CFR2.790)
ML20135A185
Person / Time
Site: Pennsylvania State University
Issue date: 08/22/1985
From: Bailey R, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20135A179 List:
References
50-005-85-02, 50-5-85-2, NUDOCS 8509100036
Download: ML20135A185 (3)


Text

{{#Wiki_filter:. . U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-05/85-02 Docket No. 50-05 License No. R-2 - Licensee: The Pennsylvania State University University Park, Pennsylvania 16802 Facility Name: The Pennsylvania State University Inspection At: University Park Campus Inspection Conducted: June 26-27, 1985 Date of Last Physical Security Inspection: November 8-10, 1983 Type of Inspection: Routine, Announced Physical Security Inspection Inspector: KJ.Baile/, Phys E : ~f durity Inspector ]- 7E-[[ dafe date Approved by: hdp /-N-/f V R. Keim Chief f feguards Section, DRS date Inspection Summary: Routine, Announced Physical Security Inspection Conducted on June 26-27, 1985 (50-05/85-02) Area Inspected: Physical protection measures for special nuclear material of low strategic significance. The inspection involved 10 hours onsite by one region-based inspecto Results: The licensee was in compliance with the NRC approved Physical Secur-ity Plan in the area inspected except: (1) facility inspections were not being conducted in accordance with commitments in the Plan; and, (2) alarm switches were of a different type than described in the Security Pla PDR G ADOCK 05000005 PDR

   -
  -
: ..
 - 9..:a ,
.

I Report Details I Key Persons Contacted l Dr. S. Levine - Director R. E. Totenbeir - Operations Officer MC 30703 - Exit Interview the inspector met with the licensee representatives identified in At 27, 198 paragraph 1 at the conclusion of the inspection on June that time the purpose and scope of the inspection were reviewed and the findings presente At no time during this inspection was written material provided to the licensee by the inspecto . MC 81485 - General Requirements for Special Nuclear Material of Low Strategic Significance The inspector reviewed Revision I (dated December 10, 1984) to the Pennsylvania State University Security Plan (PSUSP) with a license representative.

- THIS PARAGRAPH CONTAINS 2.790(d) INFORMATION AND IS NOT FOR

,

PUBLIC DISCLOSURE. IT IS INTENTIONALLY LEFT BLANK.

.i , s I L

,

h

*
.
   .    -p

_ _ -- _

.. . . _ . . - . ._
.
.'
.

I

Failure to conduct inspections in accordance with the PSUSP is a violatio (50-05/85-02-01).

THIS PARAGRAPH CONTAINS 2.790(d) INFORMATION AND IS NOT FOR PUBLIC DISCLOSURE. IT IS INTENTIONALLY LEFT BLAN Failure to have the alarm switches described in the PSUSP is a violatio (50-05/85-02-02).

The inspecter spot-checked logs, records and procedures for accuracy, com-pleteness, abnonnal conditions, significant trends, and required entries. The following logs and records were reviewed: Test results for intrusion detection systems, results of response to security incidents, seal records, building check logs, annual review of the Security Plan, and Police Services Security Awareness Training Program. No discrepancies were noted in the logs and records except as identified above.

!

.  -. .-  , , - . -.  . . , .

}}