ML20138A143

From kanterella
Revision as of 07:37, 15 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 99900511/85-02 on 851209-13.No Violation Noted.Unperformed Reviews Will Be Continued During Future Insp
ML20138A143
Person / Time
Issue date: 02/25/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Yow J
CORPORATE CONSULTING & DEVELOPMENT CO, LTD.
Shared Package
ML20138A149 List:
References
REF-QA-99900511 NUDOCS 8603140090
Download: ML20138A143 (2)


Text

F

/ o g UNITE D STATES E' n NUCLEAR REEULATORY COMMISSION g E WASHINGTON, D, C. 20555

/

February 25, 1986 Docket No. 99900511/85-02 Corporate Consulting

& Developing Company, Ltd.

ATTN: Dr. J. R. Yow f President P. O. Box 12728 Research Triangle Park, NC 27709 Gentlemen:

This refers to the inspection conducted by Mr. R. N. Moist of this office on December 9-13, 1985, of your facility at Research Triangle Park, NC, and to the discussions of our findings with you and members of your staff at the conclusion l

of the inspection.

The purpose of this inspection was to perform a technical evaluation of your equipment qualification test activities for safety-related equipment and to witness equipment qualification testing being performed for General Rublic Utilities Nuclear Corporation and Patel Engineers. Areas examined during the l inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

While the inspection did not identify any violations of applicable requirements, several reviews could not be completed because additional test activities or evaluations were scheduled to be performed by your staff and by others. These reviews will be continued during a future inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-7 g-(

dk Gar . Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Inspection Report 99900511/85-02
2. Appendix B-Inspection Data Sheets (5 pages) 0603140090 860225 [

PDR GA999 EECCCDC ,

99900511 PDR,

A Corporate. Consulting & Development February 25, 1986 Company l

l l

)ISTRIBUTION:

l myn:IE:09 l VP8 Reading DQAVT Reading l RVollmer

! JStone LParker l

UPotapovs l RNMoist

! RLasky .

Region'I, IV JGrossman, SNL l

l l

i l

l l

t l

l l

l I

Mf}N (f

! VPB:DQAVT SC/VPB:DQAVT B PB:DQAVT

! RMoist:tt UPota ovs GGZe3W j J//3/86 S/ 86 p/g/86

_ _ _ _ _ __________._________..__.i____.____