NARRATIVE
SUMMARY
OF l MONTHLY OPERATING EXPERIENCE September 1985 i
September 1 The Unit entered the mcnth in Mode 5 as a result of a reactor trip / safety injection due to a loss of instrument air which occurred on August 29, 1985. Plant heat up began on the 1st with the Unit entering Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />.
September 2 Plant heat-up continued with the Unit entering Mode 3 at 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />.
September 3 Plant heat-up continued wi th reactor criticali ty achieved at 1247 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.744835e-4 months <br /> and the Unit being synched to the grid at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br />.
September 4 The Station operated at a reduced power level of approximately 57 percent as a result of maintenance being performed on feedwater pump [ FW-P-1A).
September 5 Repai rs to feedwater pump [ FW-P-1A] were completed at 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br /> and power level was subsequently increased to a nominal 100 percent.
September 6 The Station was in Operational Mode 1 with reactor power through at a nominal 100 percent. Reactor Coolant System was September 15 at a normal operating pressure and temperature.
September 16 Inadve rtant grounding of Vital Bus #2 caused the Loop B OTAT and OPAT bistables to trip producing a reactor trip at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />. The reactor achieved criticality at 2203 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.382415e-4 months <br /> and the Unit was synched to the grid at 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br />.
September 17 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent. Reactor Coolant September 25 4 System was at normal operating pressure and temperature.
8512120118 DR 851003 ADOCK 05000334 PDR 1
September 1985 Summary of Monthly Operating Experience September 26 At 1023 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.892515e-4 months <br /> the plant P250 computer began reading N42 and N43 approximately 20 percent low. This resulted in two channels calculating an erroneous targeta 0. At 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> operators noticed the rod position indicators (RPI's) for control banks C and D reading 200 steps with the rods actually at 228 and 225 steps. At 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />, the interaction between the plant variable computer and the plant P250 com t deenergized and both the RPIs and the awere operations monitor no$pu returned to normal.
er was Plant t affected by this event.
September 27 The Station was in Operational Mode I with reactor through power at a nominal 100 percent. Reactor Coolant System September 30 was at normal operating pressure and temperature.
l
, 1
^
l 1
1 2
OPERATI G DATA REPORT DOCKET NO. 50-334 DATE 10/3/63 COMPLETED BY P. A. Smith
, TELEPHONE. 417-641-1825 OPERATING STATUS l
I. Unit Name: Beaver Valley Power Station, Unit il Notes September 1985
- 2. Reporting Period:
- 3. t l===d Thermal Power (MWt): 2W
- 4. Nameplate Rating (Gross MWe): 923
- 5. Design Electrial Rating (Net MWe): 835
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Maximum Dependable Capacity (Net MWe): 810
- 8. If Cheness Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
e
- 9. Power Level To Which Restricted.If Any (Net MWe): None
- 10. Reasons For Restrictions,if Any: N/A This MontJi Yr. tete ' Cumulative
- 11. Hours In Reporting Period 720.0 6',551.0 82,559.0
- 12. Number Of Hours Reactor Was Caitical 647.6 6,062.2 43,417.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4.482.8
- 14. Hours Generator On-Line 644.8 5.915.0 41.997.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.627.823.0 14,513,009.9 97,911,523.9
- 17. Gross Electrical Energy Generated (MWH) 517,000.0 4,657,000.0 31,151,400.0
~
- 18. Net Electrical Energy Generated (MWH) 485.300.0 4.366.550.0 28,991,393.0
- 19. Unit Service Factor 89.6 90.3 53.3
- 20. Unit Availability Factor 89.6 90.3 53.3
- 21. Unit Capacity Factor (Using MDC Neti 83.2 82.3 46.9
- 22. Unit Capacity Factor iUsing DER Net) 80.7 79,8 45.5
- 23. Unit Forced Outage Rate 10.4 g,5 24.8
- 24. Shutdowns Scheduled Over Next 6 Months ! Type.Dete.snd Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Priur to Commercial Operationi: Forecast Achieved INITIA L CRITICALITY N/A N/A INITIA L ELECTRICITY N/A_ N/A COMMERCIAL OPERATION N/A N/A 4 <,,77) 1
\\
t MAJOR MAINTENANCE
- 1. Maintenance of Feedwater Pump [FW-P-1 A] .
- 2. Repaired Main Steam Trip Valves [TV-MS-101B] and [TV-MS-101C].
- 3. Maintenance of Station Air Compressor [SA-C-1A] and [S A-C-1B] .
- 4. Inspected and repaired Steam Driven Auxiliary Feedwater Pump [FW-P-2].
4 a
t i
I
- r I
e - - -
+ - ..m,, -+y- , v-w:.1 -
v- = , ., # - - - , - - ---w-- ---er-- + -v- * - - - - . .---
l
. . l AVERAGE DAll UNIT POWER LEVEL. l t
DOCKET NO. 50~334 l UNIT 3V?S U::1: 41 DATE 10/3/85 :
COMPLETED BY P.A. Smith TELEPHONE (412) 643-1825 SEPTEMBER Mom DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe-Net) (MWe-Net) g 0 667 37 0 788 2 18 l 3 135 39 827 784
" 20 582
$ 784 23 783 6 785 7
22 7 785 784 73 4
g 783 24 786 785 9
25 789 742 10 26 788 II 827 829 27 12 747 j
28 789 788 13 1 39 i- 14 790 787 30 15 789 31 i
t 16 .339 INSTRUCTIONS t
On this format. fist the average d:ily unit power le.c!!n MWe. Net Or esch day in the reputtine month. Compute to the ne: rest whole mepwatt.
I 19/77 )
. _ _ . , _ - ~ . . _. . _ . , _ . _ _ . _ _ . _ . . . . _ . _ _ _ - . . , _ . . . _ _ _ . . _ . _ _ - _ . _ _ _ . - _ - _ _ _ _ , _ . . . _ _ . _ _ _ _ - _ - _ - . _ .
UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE 10/3/85 COMPLETED BY P. A. Smith REPORT MONIH SEPTEMBER TELEPilONE (412) 643-1825 en *#o "u "
0
- N Licensee
- g C .0 t ,a e Cause, & Corrective No. Date #
e %5 . 3UE Event !e Action to R "5 l 5 ,E " Report # $3 eo Prevent Recurrence H E M y*y NU O 8
30 850901 F 62.2 A 4 85-015 AIRDRY PA The Station remained off line follow-ing a reactor trip / safety injection due to a loss of instrument air caused by a broken line on the instrument air dryer.
Repairs were made and the Station returned to service at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br /> on the 3rd.
31 850903 F 0 B 5 N/A CH PUMPXX The Station was operating at s' reduced power level as a result of maintenance being performed on feedwater pump [FW-P-1A].
(CONTINUED) 1 2 3 4 F: F used Reasam: Hethod: 1.mlubit G . Insisus siims S Schedueil 8
A-Eiguipment Failure (Emplain) 1-Manual fin Psepasasi.m os Dana B. Maintenance of Test 2-Manual scree I nis) Sheels l'w I kernce C Refuelint 3-Automatic Scram F$cn' Relant 81 l'RII de INllRI G D-Regulatoey Restricii.* 4-Continued From Frevious Month Ultill I Openalais Tsaining A license Examinati" 5-Ite<'uc tion I: Adnunistrative 9-Other 5 .
G Operatiimal I s eios 11 aplaml I sinhis I Same S. misc 08/77) II OtherflN plaiul
, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-334 UNIT NAME BVPS Unit il DATE - 10/3/85 REPORT MONIH SEPTEMBER COMPLETED BY P. A. Smith TELErtlONE (412) 643-1825 cn % MO S "
oa **
a 0 ." t Licensee $#5 Cause, & Corrective No. Date % %$ 'E t', E R
S "5
0 5 5 .E "
Event Report #
f4 e o ao Action to H M y*g NU O Prevent Recurrence e
31 (CONTINUED) Repairs to feedwater pump [FW-P-1A]
completed at 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br /> on the 5th and power level was subsequently increased.
32 850916 F 13.0 A 3 85-016 i EG ZZZZZZ Inadvertant ground ing of Vital Bus 2 (
, caused a reactor trip at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.
' The Station returned to service at 4
2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br /> on the 16th.
1 1 1 2 F F.uted 3 4 Reas m: Method:
S- Schedu8cd Exhibil G - Insinut siims A Equipment Failure (Explain) t-Manual fin Pseparais.m of Data
- B-Maintenance e*i Test 2-Manual seraan C RefuelinE l~rier) Shetislo'I*en5cc 3-Automatic Scram Fseni Rep.wo Il l'RII de q NtIRI G D Regidanoi> Restslctiim l, l' Openalis Tsaining A liciise l'xaniinati" 4-Continued From Previous Month (llfil l I Adminisssative 5-Reduction 9-Other 5 G Operatiusial I isne il aplain t I sluhis 1 - Sanw,Sunse l'8/77) ll Oshes flitplaini i
e