Evaluation of Nuclear Facility Decommissioning Projects. Project Summary Report,Elk River Reactor
ML20070L719
Person / Time
Site: 05000115
Issue date: 12/31/1982
From: Adams J, Miller R
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
To:
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
CON-FIN-B-7568 NUREG-CR-2985, NUDOCS 8301100006
Download: ML20070L719 (49)


Text

.

NUREG/CR-2985 l

Evaluation of Nuclear Facility Decommissioning Projects Project Summary Report Elk River Reactor Prepared by R. L. Miller, J. A. Adams UNC Nuclear Industries b Nuclear Regulatory Commission 8301100006 821231 R2 R PDR

? '~ \

. NOTICE '

This report was preparsd as an account of work sponsored by an agency of the United States Government, Neither the United States Government not any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability of re-sponsibility for any third party's use, or the results of such use, of any information, apparatus,

= product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights.

Availability of Reference Materials Cited in NRC Publications Most documents cited in NRC publications will be available from one of the following sources

1. The NRC Public Document Room,1717 H Street, N.W.

Washington, DC 20555

2. The NRC/GPO Sales Program, U.S. Nucleer Regulatory Commission, Washington, DC 20555
3. The National Technical Information Service, Springfield, VA 22161 Although the listing that follows represents the majority of documents cited in NRC publications, it is not intended to be exhaustive.

Referenced documents available for inspection and copying for a fee from the NRC Public Docu-ment Room include NRC correspondence and ir.ternal NRC memorende; NRC Office of Inspection and Enforcement bulletins, circulars, information notices, inspection and investigation notices; Licensee Event Reports; vendor reports and corresponrience; Commission papers; and applicant and licensee documents and correspondence.

The following documents in the NUREG series are available for purchase from the NRC/GPO Sales Program: formal NRC staff and contractor reports, NRC-sponsored conference proceedings, and NRC booklets and brochures. Also available are Regulatory Guides, NRC regulations in the Code of Federal Regulations, and Nuclear Regulatory Commission Issuances Documents available from the National Technical Information Service include NUREG series reports and technical reports prepared by other federal agencies and reports prepared by the Atomic Energy Commission, forerunner agency to the Nuclear Regulatory Commission.

Documents available from public and special technical libraries include all open literature items, such as books, journal and periodical articles, and transactions. Federal Reprster notices, federal and state legislation, and congressional reports can usually be obtained from these libraries.

Documents such as theses, dissertations, foreign reports and translations,and non-NRC conference proceedings are available for purchase from the organization sponsoring the publication cited.

Single copies of NRC draft reports are available free upon written request to the Division of Tech-nical Information and Document Control, U.S. Nuclear Regulatory Commission, Washington, DC 20555.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are maintained at the NRC Library, 7920 Norfolk Avenue, Bethesda, Maryland, and are available there for reference use by the oublic. Codes and standards are usually copyrighted and may be purchased from the originating organization or, if they are American National Standards, from the American National Standards Institute,1430 Broadway, New York, NY 10018.

GPO Printed copy prece:

NUREG/CR-2985 1D Evaluation of Nuclear Facility Decommissioning Projects Project Summary Report Elk River Reactor Minuscript Completed: October 1982 Data Published: December 1982 Prepared by R. L. Miller, J. A. Adams UNC Nuclear Industries Office of Surplus Facilities Management Richland, WA 99352 Pr: pared for Division of Engineering Technology Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission W:shington, D.C. 20555 NRC FIN B7568 ,

l l

I

EVALUATION OF NUCLEAR FACILITY DECOMMISSIONING PROJECTS PROJECT

SUMMARY

REPORT ELK RIVER REACTOR Reviewed by DOE-RL:

eD/

lite, Director, Surplus Facilities u/s/ft Date

f. Management Program Office Approved by UNC:

h w.wsb Il T j 91 T. E. Dabrowski, Director, Office of Surplus 8 Date Facilities Management Approved by NRC:

/h -

d.W.Reisenweaver,NRCProgramManager l///o/87-

' / Date i

. ABSTRACT This report summarizes information concerning the decommissioning of the Elk River Reactor. Decommissioning data from available documents were input into a computerized data-handling' system in a manner that permits specific information to be' readily retrieved. The information is in a form that assists the Nuclear Regulatory Commission in its assessment of decommissioning alternatives and ALARA methods for future decommissionings projects. Samples of computer reports are included in the report. Decommissioning of other reacto. s, including NRC reference decommissioning studies, will be described in similar reports.

i I

iii

CONTENTS iii ABSTRACT

1.0 INTRODUCTION

1-1 1.1 Background Information 1-2 1.2 Acronyms & Definitions .1-3 2.0 FACILITY

SUMMARY

REPORT 2-1 2.1 Facility Description 2-1 2.2 Summary of Costs & Radioactive Waste 2-1 2.3 Comparison of Cost Items 2-1 2.3.1 Dollar Costs 2-2 2.3.2 Man-Rem Costs 2-2

3.0 DESCRIPTION

OF COMPUTER REPORTS 3-1 3.1 Decommissioning Code Table Index 3-1 3.2 General Information 3-1 3.3 Significant Event Report 3-1 3.4 Radionuclide Inventory 3-1 3.5 Project Cost / Exposure Report 3-2 3.6 Dose Rate and Contamination Report 3-2 3.7 Project Labor Report 3-2 3.8 ALARA Report 3-2 3.9 Shipment Report 3-2 3.10 Disposal Costs 3-2 3.11 Surveillance Report 3-3 i

V k

I CONTENTS (continued) l 4.0 COMPUTER REPORTS 4-1 4.1 Decommissioning Code Table Index 4-2 4.2 General Information 4-3 4.3 Significant Event Report 4-8 4.4 Radionuclide Inventory 4-9 4.5 Project Cost / Exposure Report 4-12 4.6 Dose Rate and Contamination Report 4-23 4.7 Project Labor Report 4-24 4.8 ALARA Report 4-26 4.9 Shipment Report 4-27 4.10 Disposal Costs 4-29 i

j r

i 1

l Vi l

1.0 INTRODUCTION

This document presents, in summary form, information pertaining to the decommissioning of the Elk River Reactor. The purpose of this type of report is to provide the Nuclear Regulatory Commission (NRC) and its

-licensees comparative data to assist in their assessment of deconnissioning alternatives and ALARA methods for future decomnissioning projects.

Data were assembled in a form that permitted input into a computerized data-handling system. The computer program

  • used produces a flexible data accumulation, manipulation, and retrieval system which provides decommissioning performance _ information such as:

! ALARA responsiveness Cost estimate accuracy Schedule adherence Project labor hours and costs Exposure accountability, and Radwaste generation and disposition When sufficient decommissioning data have been obtained from an adequate number of facilities of any one type (BWR, PWR, Research), comparisons i can be made between the experiences at the facilities and with NRC decmanissioning NUREGs. The comparisons will be documented to facilitate the assessment of future nuclear facility decommissioning plans.

1

  • MAPPER is the computer software package selected for the program.

MAPPER stands for Maintain, TPrepare, and Produce Executive Reports.

This system is use'd with DOE s UNIVAC system at RTchland, Washington.

1-1

l Facilities studied and included in the' data system during 1982 are listed below:

Facility Decommissioning Mode Elk River Reactor (BWR) DE00N NUREG/CR-0130 (Reference PWR) DECON

-SAFSTOR ENTOMB NUREG/CR-0672 (Reference BWR) DE00N SAFSTOR

' ENTOMB NUREG/CR-1756 (Reference Research) DE00N and Test Reactor) SAFSTOR ENTOMB Ames Reactor (Research) DE00N BONUS (Boiling Nuclear Superheat) ENT0MB Peach Bottom-1 (HTGR) SAFSTOR (Surveillance data only)

Fermi-1 (LMFBR) SAFSTOR This summary report concerns only the Elk River Reactor decommissioning program. Summary reports for the other facilities listed above may be obtained from:

GPO Sales Program Division of Technical and Information and Document Control U.S. Nuclear Regulatory Connissicn Washington, D.C. 20555

1.1 BACKGROUND

In 1981 the NRC Staff initiated a multi-year program to assess and evaluate the methods, radiation exposure and costs associated with the decommissioning of retired nuclear reactors. The program objective is

-to provide the NRC with data that will assist in the assessment of future decommissioning plans to assure implementation of NRC's ALARA policy.

1-2

The program was originated under the auspices of tne Office of Nuclear Regulatory Research through its Chemical Engineering Branch. UNC Nuclear Industries (UNC) is responsible for the technical direction of the program and for preparation of documentation and summary comparisons of evaluated projects. See NUREG/CR-2522 " Evaluation of Nuclear Facility Decommissioning Projects" for a complete description of the Program Plan.

Licensees currently decommissioning reactor facilities-or licensees who are planning such projects have been, or will be solicited for possible inclusion in the program. After collection of sufficient data, analyses i

of each project will be completed, then comparisons will be made between the actual methods,_ costs and exposure used by licensees and with data contained in reference decommissioning studies.

1.2 ACRONYMS - ABBREVIATIONS - DEFINITIONS Definitions of Decommissioning Alternatives DECON - to immediately remove all radioactive material to permit unrestricted release of the property.

SAFSTOR - to fix and maintain property so that risk to safety is acceptable for period of storage followed by decontamination and/or decay to an unrestricted level.

ENTOMB - to encase and maintain property in a strong and structurally long-lived material (e.g., concrete) to assure retention until radioactivity decays to an unrestricted level.

Acronyms - Abbreviations A/C Activated or Contaminated AEC Atomic Energy Commission ALARA As Low As Reasonably Achievable Bio Biological BWR Boiling Water Reactor C1 Curie CS Carbon Steel Cu Ft cubic Feet DDS Decommissioning Data System DNA Data Not Available 00E . Department of Energy DOS RED FCT Dose Reduction Factor DPM Disintegrations per Minute ERR Elk River Reactor HTGR High Temperature Gas-Cooled Reactor 1-3 L -

LMFBR Liquid Metal Fast Breeder Reactor MAPPER Maintain, Prepare, and Produce Executive Reports MW Megawatt MWD Megawatt Days MWE Megawatt Electrical MWT Megawatt Thermal NRC U.S. Nuchar Regulatory Commission NSSS Nuclear %eam Supply System NUC ENG Nuclear Engineering PSIG Pounds / Square Inch-Gauge PWR Pressurized Water Reactor RCPA Rural Cooperative Power Association Rich Richland RR Railroad Sched Scheduled Sheff Sheffield Spec No Specification Number SS Stainless Steel SYS/ COMP System Component Trip Len Trip Length Typ Type UNC UNC Nuclear Industries, Operations Division UPA United Power Association W.0. Work Order f

i 1-4

2.0 FACILITY

SUMMARY

REPORT This summary report is a duplication of information found in the computer printout in Section 4.0. The intent of this summary is to show, at a glance, the data necessary to become familiar with the facility.

2.1 FACILITY DESCRIPTION Name: Elk River Reactor Location: Elk River, Minneso l Owner: AEC Decomissioning Mode: DE00N Reactor Type: BWR Startup Date: 1962 Shutdown Date: 1968 Power Rating: Electrical 23.8 (MW) Thermal 58.2 Lifetime Power: Electrical DNA (MWD) Thermal 53,000 Reason for Decomissioning: End of AEC demonstration period 2.2

SUMMARY

OF COSTS AND RADI0 ACTIVE WASTE i Total Decomissioning Costs: (19735) 6,150,000*

Personnel Exposure: (Man-rem) 75 Radioactive Waste-Volume: (Cubic Feet) 92,000 Radioactive Waste-Activity: (Curie) 10,000 2.3 COMPARISON OF COST ITEMS The statistical significance of the following comparative information is not fully developed at the present time. Comparative numbers should be meaningful when additional decommissionings have been accomplished.

  • See page 4-1 for inflation rate table to adjust costs to year of interest 2-1

2.3.1 Dollar Costs

, The following listed items are compared to the total dollar cost for-the decommissioning project.

Total Decommissioning Cost: $6,150,000 (1973 Dollars)*

Unit of. No. of . Dollars Item Measurement No. of Units Spent per Unit Radioactivity. Ci 10,000 $615 per Ci Radioactive Waste Cu Ft 92,000 $65 per Cu Ft Lifetime Power MWD 53,000 $115 per MWD Output Lifetime Electr. MWD DNA DNA Output Spending Rate Months 38 $162,000 per Mo.

2.3.2 Man-rem Costs The following listed items are compared to the amount of radiation exposure taken by decommissioning personnel.

Total man-rem used: 75 Unit of No. of Units Item Measurement No. of Units per Man-rem Radioactivity Ci =10,000 130 Ci per man-rem Radioactive Cu Ft 92,000 -1,225 Cu Ft Waste per man-rem Decommissioning Dollar (1973), 6,150,000 $82,000 per Cost man-rem l

l l f

  • See page 4-1 for inflation rate table to adjust costs to year of-interest.

2-2

3.0 DESCRIPTION

OF REPORTS

~

The reports described below'are the basic reports used in the program.

In addition to the basic reports, MAPPER provides the ability to produce other reports by. manipulating the data available in the basic reports.

3.1 Decomissioning- Code Table Index The code table contains a list of facility buildings, systems and system components and a corresponding system / component number for each. The i system / component number is used throughout DDS to relate data to specific facility components.

This basic report type may be expanded to include tables or indices of other kinds related to facility decommissioning. Candidate' tables are labor category wage rates, shipping company rates, shipping company name codes, disposal site name codes and rates, or archived file tape names.

3.2 General Information This report is a free format input report designed to accommodate descriptive data of any kind. Entries may be given any title and related to any facility system by a system component number. Data are entered in any format on any subject. The report should be used to record information that does not fit into any of the report types organized by column._ This includes facility location, description, owners, operators, builders. Sumary _ data may also be included where it is'not readily derivable from other reports or for convenient reference.

3.3 Significant Event Report i This report is used to record the facility's operating history, which in some cases could impact facility decomissioning. It contains dates, system / component numbers, and event descriptions. Noteworthy events such as construction completion, startup, shutdowns, significant j

incidents, and accidents are recorded in this report.

3.4 Radionuclide Inventory An inventory of radionuclides present in each facility system will be made prior to the start of decomissioning. The amount of each radionuclide or its concentration, the measurement date, and a descH ption of each system's~ material composition will be recorded. It I

will be noted whether a radionuclide present in a system is the result of neutron activation or contamination.

3-1

4

~ 3'.5- ^ Project Cost / Exposure Report Costs, schedules, man-hours, man-rem, both estimated.and actual, are listed for each activity specification number. These costs may be i broken out on lines having a subactivity specification number. This report is the main respository of cost and exposure infonnation for a decommissioning project.

3.6 Dose Rate and Contamination Report Dose rates at locations throughout each facility #re recorded prior to decomissioning. Locations relative to a reference map, elevation, '

system / component number, and type of measurement are recorded for each measurement. Both upper and lower limits of dose rates or contamination levels (in disintegrations per minute) are listed.

3.7 Project Labor Report Decomissioning labor costs, exposure, and mar.-weeks for each activity specification are recorded at a to-be-detennined frequency. This supplements the project cost / exposure report by providing data on how ,

costs and exposures accumulate over the course of a decomissioning  !

project.

3.8 ALARA Report The ALARA report contains records of ALARA efforts by activity specification number. The affected facility system, date, cost items, exposure information, and a description of the ALARA effort are listed.

This report can be used to calculate by activity specification number or for all activities the total estimated man-rem saved as well as total cost incurred through the implementation of the ALARA effort.

3.9 Shipment Report

! Volumes, weights, and other physical data are recorded by waste type for material produced by each activity-specification. These data are listed for each shipment of material from the decomissioning site. Trip lengths and vehicle dose rates are recorded in order to calculate public 4

exposure.

. 3.10 Disposal Costs

?

l The costs associated with each waste disposal shipment are recorded in the Disposal Costs Report. Costs are divided into transportation, burial, and container categories. Costs for each container type on the shipment are also listed.

3-2

(

4 3.11 Surveillance Report The so,veillance report is used to record annual costs and exposures l asscc'ated with long term surveillance of a deconnissioned facility.

~

Under normal conditions a surveillance report would not be required for, a facility decommissioned under Mode DECON.

t 4

i l

l I

i i 3-3 l

l+ w a, +-ae-w-o -,-u,-,,-- , ,- ---ry,veq ,v-,- y -no-,,.<p -- , + ,n---.,----,m -- em 9 e =~'-- w' Y

. ERR 1 UNC DECOMMISSIONING DATA SYSTEM GENERAL INFORMATION REPORT 72 Cit 04 e .SYS/ COMP.

e SYSTEM / COMPONENT . NUMBER . ENTRY TITLE e====================.========.================================================.

DESCRIPTION OPERATING HISTORY NAME: ELK RIVER REACTOR' STARTUP DATE: NOVEMBER 1962

. LOCATION: ELN RIVER. MINNESOTA SHUTDOWN DATE: JANUARY 1968

. OWNER: AEC MEGAWATT DAYS S3.000

. OPERATOR: RCPA MAJOR SHUTDOWNS: DNA

. ARCHITECT / ENGINEER: SARGENT & LUNDY DECOMMISSIONING MODE: DECON

. BUILDER: CHICAGO BRIDGE & IRON

. NSSS: ALLIS-CHALMERS MFG CO.

REFERENCES REPORTS:

AEC-ELK RIVER FINAL PROGRAM REPORT (C00-6S t-93 REV 3

. DISMANTLING PLAN (SS-836)

. MONTHLY PROGRESS REPORTS (ERR t THROUGH ERR-401

. FINAL ELK RIVER REACTOR SITE SURVEY REPORT (C00-6St-92)

. FINAL REPORT OF THE SAFETY REVIEW COMMITTEE

. ACTIVITY SPECIFICATIONS (1 THROUGH tt)

. DETAILED WORKING PROCEDURE C 4.1 THROUGH 11.11

. ERR DISMANTLING PROJECT DISPOSAL MANUAL

'. PAPERS:

Am

[a . DISMANTLING OF THE ELK RIVER BOILING WATER REACTOR

.J. U. JONES. R. U. PULLIAM. W. J. MANION

  • RADI0 ACTIVE OPERATIONS IN THE DISMANTLING OF THE ELK RIVER REACTOR.*

.J. F. NEMEC. R. SECKERS. R. BLUMBERG

$*DEMOLITIONOFRADIDACTIVEANDCONTAMINATEDSTRUCTURESSYUSEOFEXrLOSIVES.

.J. F. NEMEC. k. G. ANDERSON

  • HEALTH PHYSICS PLANNING FOR DISMANTLING OF THE ELK RIVER REACTOR.*

. DAN MCCONNON

$*0PERATIONALHEALTHPHYSICSDURINGDISMANTLINGDFTHE'ELKRIVERREACT0R.

. DAN MCCONNON

. *THE RESPIRATORY PROTECTION PROGRAM'FOR DISMANTLING OF THE ELN RIVER

. REACTOR.* D. NCCONNON. R. WONACOTT

  • EXPERIENCES IN DECONTAMINATION / DECOMMISSIONING OF THE ELK RIVER REACTOR.

.D. MCCONNON. J. F. NEMEC

. DECOMMISSIONING INFORMATION

. PERSONNEL RADIATION EXPOSURE

. NUMBER OF PENSONNEL MONITORED: 400

. AVERAGE DOSE MANREM: 0.8

- . _ ~ _ --

. ERR 4 UNC DECOMMISSIONING DATA SYSTEM GENERAL INFORMATION REPORT 72C4104 e .SYS/ COMP.

e SYSTEM /CDMPONENT . NUM8ER . ENTRY TITLE sussssssssssssssssssa,ssassssa,assassassassassasssssssssssssssssssssssssssssssa,

. TOTAL MANREM USEOs 75

. DOSE TO PUBLIC-MANREM DNA

.SEE PROJECT COST / EXPOSURE REPORT FOR ADDITIONAL PERSONNEL EXPOSURE INFD.

. COST

SUMMARY

(1973 $)

. TOTAL DECOMMISSIONING COST: 6.155.775 (INCLUDES S418.000 TECHNICAL SUP-

. PORT SERVICES)

. MANP0uER COSTS

. PREDECOMMISSIONING ENGINEERING: 425.775

. . SECURITY: 216.495.

. HEALTH t SAFETY: 735.470.

. OPERATION AND MAINTENANCE: 526,745.

. ENGINEERING AND ADMINISTRATION: 565.260.

. STOR AGE AND WAREHOUSING: 79.330

. LABOR RATES (S/HR) (NOT INCLUDING BURDEN)

. DECOMMISSIONING OPERATIONS CONTRACTOR

. MANAGERS: 11.00

. PROJECT ENGINEER: 40.00

. PROJECT CONTROL ENGINEER: 5.45

. SUPERVISORS: 6.20 Jh . CLERICAL:

j, . TYPIST: 3.00 '

. SECRETARY: 3.80

. REACTOR OPERATIONS: 5.30

. DECON TECH: 4.35

. GUAROS: 4.30

. HP. TECH: 5.75

. LA8 TECH: 5.50

. ELECTRICIANS: 5.70

. LA80RERS: 4.00

. DRAFTSMAN 4.95

. JANITORS: 3.75

. SU8 CONTRACTORS

. MANAGERS: 40.00

. FOREMAN 7.00

. EXPLOSIVES ENGINEER: 44.25

. HEAVY EQUIP. OPERATOR: 8.40

. LIGHT EQUIP. OPERATOR: 7.65

. L480RERS: 4.25

. WASTE DISPOSAL COSTSC S 3 UASTE DISPOSAL RATES (S)

. BURIAL CHARGES: 75.437. BURIAL COSTS PER CU FT 1.00

. TRANSPORT CHARGES: 105.037. CASK RENTAL RATES: $3000/MO FOR 4.5 IN

. LEAD. 100 CU. FT.

. CONTAINER COSTS: 263.414. TRANSPORTATION AATE:

9

1 4.0 COMPUTER REPORTS Dollar values listed are in 1973 dollars. For adjusting costs listed in the computer reports to year of interest, use the inflation rate table below.

Inflation Rate Table

  • Year Inflation Rate 1966 .029
1967 .029 1968 .042 1969 ' 054 1970 .059 j 1971 .043 1972 .033 1973 .062 1974 .11 1975 .0 91 1976 .058 1977 .065 1978 .077

' 1979 .113 1980 .135 1981 .089 1982 .060 (estimated)

!

  • Source: Statistical abstract of the United States,1981 Consumer Price Index.

4-1

-,w.;--

g:

._., p << 7 -

, t_ -

.g' V: . <~

i.'. _

14'  %

  • x' s m g.. -

$. i 4 N. M O',.*

g -a C*

  • 2 4 '_

l  : ,

e s

.[

t i'

> g .4

.s  %

' 4 O j l' **> r %.

^

+

r i~

',s '.4% -

1 K

f

, ) 4

?p l% l W

iy -

A' .

4- f_. ..

a .

s,

's g- - s

(.. r,;

r A

& I.  %. , _ .

sT- . J T y' s .y,.4-- ... K -

- .c. - .

, t

+ Ab ,?" .t 6

w -

il .,, v

\

3 e . . _ ,

+"t -

4 n e

( t; 2 (:

O 4e

  • e 5 s ,3 z

en at .

.i #

t "3 -* -

9. >ZE d i

6*IOW '4 0$9W33A

  • j i.

M S O 2 O og w e eat E -v  !',--

e e .S.A2 OE53 . 4 # -

2 SA E6.Mqem , <

e SAO aeg ;x >

w

% G-uGWWw G3%W Am $/'/

F=

4

.a a o awsr m .> m e a

.i e e > es a a i

> e >sa z > >

9>>WXX>

Iaf G ** $4 2 W tel X 4 a eJ > 2 == w O 8 * (D O t.3 3 u SuEmb-O g r

=

.B..

4 ** .e EOme-

==u=O h ew . q,, .

g -;

O 5 bow et u 1 u 5 O ew a & s .

taf 9 et E 4 > E A e>W3AOw *i  ?' i f '[' . .

  • eesamzw s

.~

3 8  % 8 ** 5 u es --

ats' v

,.y 4<

5 .a O k me w >

E s U E k s te il N g tai e<4 ILf E tee .p

> a 4a43g 'M- -*

M.

GA 4e .E Ok g3 .a.

-4'-

,;a Fj

  • y..i.- - <

> e a sw .

an searCr>- . *

.* 51 4 '

eB3> < O ur m wea.e 4 e "' ,g C *

< E O.tD % 4 sS n 4' ' .,v &

a .. uzw - z e. u w: . - . t <. '4

. :s' s

4 4

5 A,W O ic;

==r Q.*O m i sj O

2 e

EA y e3E 1'3O>w

  • <* w O ew$4 > O k 4

w g ,'( .

r s

',, e 4 4

g e

s, Osee O w a .E. O m '. ( "I-

-Ows>uzwar a '- -

/-

us u a e s r ec O m w 2

%zear ww (

) a

.m.

r>xezw an a e < aas . O x sn x

. .* g;x ac sa r -w m.* e O .

  • O zz .

z en. .e e. E e>n <d w r u es .

w

. .a >. w -mu O m. r

. s

. maceOm a '

u we*-

->aewm w e a r wm > 8.>. Q .,%

was - *

-4 v' 1

z. . *. Oaa n ec wwwwwrazOm .x re u ew ,  %

s .a. Q e se e in r ax > < 1 uuez>sswO  !

h , . S, 3 A e % e

  • m z C ar > , < p-wze '\

fe wn -

e

-'[.Y 'h*

.} h.

.'f'

> a las - *

- 6

-'S.<--4 et e > " 4 .,

.* >sO 4 er se e a

. .d 4 .

i

/, 5 g ,f.-"

i w ',

.p? l

, .... ......  ; 8 ,, , ,> ,:j . i-

,. . 3 ,  :

/* n / f J.

g s.

g f.

j

'_- 4 / j

\ 11 , ,

) 1  %

k', ' " l l

fi

.h 4 ,[ A fr

~

' s; ,~ L , ' ,3 ,, - a b

s.  % .!

. :< 4< j.* .

, \ s l

4-2 2

<r/ m /. as '\ e(g s (

, ;a 4 4 ., "1

, ;s 1 w's .

, r-l t

.}-.--.

,. - . . . - . -- , .A UN .1,. as --s -

,, g ._ ,. ., ._ * -

s . . .. , .. .. , , . , .

%. .. lv. _' ,-

I

. ERR 1 UNC DECOMMISSIONING DATA SYSTEM GENERAL INFORMATION REPORT 72C1104 e .SYS/ COMP.

e SYSTEM / COMPONENT . NUMBER . ENTRY TITLE e============ ...====. .......... =====================......==================.

. OVERuEIGHT PERMITSr TO SHEFFIELD, ILL (410 MILES)

. $1.50 PER 100 POUNDS-FULL TRUCK LOAD

. ILLINOIS $35. $1.15 PER 100 POUNDS-TRUCK ON RAIL FLATCAR

. INDIANA $55.

. KENTUCKY $20. TO MOREHEAD, KY (835 MILES)

. MINNESOTA $10. $2.75 PER 400 POUNDS-FULL TRUCK LOAD

. WISCONSIN $ 5.

TO HANFORD. WA (1500 MILES)

ATHX RR CAR TO HANFORD $2,400.

SURCHARGES: DNA i l

.UASTE DISPOSAL DATA

. NUMBER OF SHIPMENTS: DNA

. TOTAL VOLUME-RADUASTE CONCRETE 44.SSO (CU FT)

TOTAL VOLUME-RADUASTE OTHER THAN CONCRETE 47,000 (CU FT)

. TOTAL VOLUME-CLEAN 83.700 (CU FT) l

. TOTAL MASS -RADUASTC 2,400,000 (POUNDS) (DOES NOT INCLUDE CONCRETE)

. TOTAL MASS -CLEANS (POUNDS) DNA

. NUMBER OF CONTAINERS: DNA

. TOTAL RADWASTE INVENTORY: 9.955 (CI)

Jn 8 . OTHER COSTS w

. UTILITIES: DNA

. MISC. SUPPLIES: DNA

. NUCLEAR INS.: DNA

. LICENSE FEES: DNA  :

. FINAL SITE SURVEY: 27,240

. TAXES: DNA

. REAL ESTATE SALE VALUE: DNA

. FINAL SITE SURVEY

. CRITERIA DOCUMENTS:

. CONTRACT NO. AT ( 11-11-651, MODIFICATION NO. 18 LETTER, KENNETH A. DUNBAR AEC TO MR. ROGER MILLER UPA DATED MARCH 5, 1971

. AEC-ELK RIVER REACTOR DISMANTLING PLAN DATED AUGUST 27, 1971. AND

. ENVRIONMENTAL STATEMENT FOR ELK RIVER REACTOR DISMANTLING OATED

. MAY 1972 (UASH-15-16)

" CRITERIA

SUMMARY

. RESIDUAL RADIDACTIVITY 13 THAT WHICH RESULTS FROM THE PRESEHCE OR OPERATION

. OF THE ELK RIVER REACTOR AND THAT UHICH CAN BE DETECTED BY NORMALLY

. ACCEPTED SURVEY FETHODS.

$RESIDUALREACTOR-ORIDINATEDRADIDACTIVITYWILLBEREMOVEDWHEREITIS

. PRACTICABLE TO 00 SO, 5 IN NO CASE WILL RESIDUAL REACTOR ORIDINATED RADIOACTIVITY WHICH IS NOT

. PRALTICABLE TO REMOVE, ENDANGER OR POSE UNDUE RISK TO PUBLIC HEALTH

s

. ERR 4 UNC DECOMMISSIONING DATA SYSTEM GENERAL INFORMATION REPORT 72C1104

e. .SYS/ COMP.
  • SYSTEM / COMPONENT . NUMBER . ENTRY TITLE

. AND SAFETY.

SURFACE CONTAMINATION LIMITS- DIRECT-BETA .400 C/M (PANCAKE GM)

. ALPHA 100 D/M/100CM2

. SMEARABLE-BETA 100 D/M/400CM2

. ALPHA 10 D/M/100CM2 IF ON-SITE SAMPLES INDICATE CONCENTRATIONS A80VE THOSE THAT EXIST OFF-SITE,

. AN EVALUATION OF POPULATION EXPOSURE WILL BE MADE. IF EXPOSURE LEVELS TO

. THE GENERAL PUBLIC DF SOO MREM / YEAR MAXIMUM OR 470 MREM / YEAR AVERAGE ARE

. EXCEEDED. THE AREA WILL BE DECONTAMINATED

$INSTRUMENTSUSED

. EBERLINE MODEL AC-28 60 CM2 GAS FLOW PROPORTIONAL DETECTOR UITH PAC-4G

. COUNT RATE METER. USED DIRECT BETA-GAMMA SURVEYS, MINIMUM DETECTABLE

. ESTABLISHED PRIOR TO EACH USE.

~

. REUTER-STOKES MODEL RSS-114 PRESSURIZED ION CHAMBER. USED FOR MEASURING

. GAMMA-RAY EXPOSURE RATES. MINIMUM DETECTABLE 1UR/HR OR LESS.

. 3 AND S INCH NAI GAMMA SPECTROMETER. USFD FOR GAMMt ANALYSIS OF. SOIL AND

. VEGETATION SAMPLES.

l Jh . GAS FLOW PROPORTIONAL COUNTER USED FOR GROSS BETA MEASUREMENTS OF SOIL 4

  • . VEGETATION SAMPLES

- CM

$FINALSURVEYRESULTS

. EXPOSURE RATEv- 7.9 TO 13.0 MICRO-R/HR'

. SURFACES - LESS THAN 100 C/M (PANCAKE GM)

. 50ll - AVERAGE GROSS BETA 43 PCI/GN.

. VEGETATION - AVERAGE GROSS BETA 96 PCI/GM.

. TRANSFERABLE (SURFACE SMEARS) LESS THAN 100 D/M 100 CM2

. RIVER 80TTOM SEDIMENTS 29 TO 92 PCI/GM.

' BACKGROUND READINGS FROM OFFSITE LOCATIONS

. SOIL 16 TO 43 PCI/GM

. VEGETATION S9 TO 908 PCI/GM

. COSTS'- SITE SURVEY

. DIRECT LABOR 7,200

. LABOR BURDEN S.040

. MATERIAL 10.000

. ANALYTICAL SERVICES S.000

".. TOTAL' 27,240

. TOTAL COST OF DECOMMISSIONING $(6.iSS.77S)

. COMPARISON ITEMS. 1 9 COST / UNIT

. NO. OF UNITS COMPARISON ITEMS

. ITEMS NO. OF UNITS COMPARISON COSTS'

= -.m

. ERR 1 UNC DECOMMISSIONING DATA SYSTEM GENERAL INFORMATION REPORT 72C1104 e .SYS/ COMP.

e SYSTEM / COMPONENT . NUM8ER . ENTRY tin E e...... ... ..................................................................

. CURIE 9.955 619 DOLLARS / CURIE '

. RAD WASTE (CU FT) 91.SSO 67 DOLLARS /CU FT

. SPENDING RATE (MONTHS) 38 161,994 DOLLARS / MONTH

. POWER RATING MEGAWATT 23.8 2S8,646 DOLLARS /MuE e ELECTRICAL (MWE) DNA

. LIFETIME MAGAWATT DAYS 53,000 116 DOLLARS /MWDT e THERMAL (MUDT) e (MWDT)

. NO OF UNITS COMPARISON ITEM

. = UNITS / MAN-REN

. TUTAL MANREM USED

. TTEM NO OF UNITS COMPARISON

. CURIES 9,98S 132 CI/ MAN-REM USED

. RAD WASTE (CU FT) 91 S50 1220 CU FT/ MAN-REM

, TOTAL COST (s) 6,1S5.7SS 82077 s/ MAN-REN

. LIFETIME MEGAWATT DAYS 53.000 707 MWDT/ MAN-REN e THERMAL (MWOT)

. POWER RATING (MWE) 23.8 '.32 MuE/ MAN-REN 2

. ASSUMPTIONS N

. COSTS ARE LISTED IN 1973 YEAR D0LL ARS.

' t 9

)

---..a.----- _

6 0

1 .

t .

D .

T .

R .

O .

P E

R .

T .

N .

E G V N E . I L

T T N . N A . A C . M I . S T F . I N~

I . D E N . M G N R I

S N.

O.

O . O IN F E

T A~

I.

T. TO T M

P.

I R.

AI RT EA T

N E

S T

E C. PR MC T S. OE O AD S

Y S

E.

D.

E N

D OROEEENU IE P NDPE TMUIS T T .TWRIAS S A

T N. ETAOES OMCTIASLITRYR E.TLTRPW A

D V.RPIE E.TOAOAAMLPLPOANNEEE RRAEDVD G ILFTLMRRR N

I T. .

SCC N.NNTERIDOIRCA NPNDUO O S D

N I

A.OOIWECECGRG C.IIRDMRP NINEO N I F.TTCPMEPGIVITI S OMINLNLIT S

I I

N CC G.RRAA UULLCMNITETSA OSTN N N M AALALI O

M I

.TTIITCLRMAMAM S.SSTTR NNIIAOEESNSNR C .OONNTNUPIIIIE E

D ...CCIISEFODFDFT P

CM .

NOR.

UCE.

/S.

SR.

YU S. N. .

93 1438 S30 TE..

4NT.

11 3121 1761930S679 023 REA.

RVD.

10000010000 024589142244 666666777777 E. E eee 3

be0 IllIt . ll

Hi136

.FRR1 U.N.C. DECOMM19SIDNINO DATA SYSTEM - RADIONUCLIDE INVENTORY -).

.A.MEASUR.( RADIONUCLIDE e .

./.EMENT . .

. CURIES.spPM/ .'

eSYS/ COMP. NAME . CURIES .FTee3 .400CM2.

e NUM8ER . SDURCE MATERIAL DESCRIPTION .C. DATE

. NOTE: ALL BLANK ENTRIES INDICATE THAT DATA WAS NOT AVAILABLE(DNA)

CONCRETE 810 SHIELD A 740430 H 3 9.30E-5 DNA DNA DNA CONCRETE BIO SHIELD A 710430 C 44 1.13E-2 CONCRETE BIO SHIELD A 710430 NA 22 1.08E-i CONCRETE SIO SHIELD A 740430 AR 39 4.72E-3 CONCRETE BIO SHIELD A 710430 CA 45 9.46E-3 CONCRETE BIO SHIELD A 710430 MN 54 1.29E-3 CONCRETE BIO SHIELD A 710430 FE 55 8.47E-1 CONCRETE BIO SHIELD A 710430 CO 60 2.066 CONCRETE BIO SHIELD A 710430 EU 152 2.120 CS CAN I A 740430 C 14 7.03E-8 CS CAN I A 710430 MN 54 1.68E-1 CS CAN I A 710430 FE 55 3.88E 4 CS CAN I A 710430 CO 60 1.0534 CS CAN II A 710430 C 44 6.06E-8 CS CAN II A 710430 MN 54 6.41E-2 CS CAN II A 710430 FE SS 3.34E i l

CS CAN II A 740430 CO 60 9.08E-1 CS LOWER SAFFLES A /10430 C 14 2.73E-7 l CS LOWER BAFFLES A 710430 V 49 1.95E-1 i T A 710430 MN 54 2.458 CS LOWER BAFFLES CS LOWER BAFFLES A 710430 FE 55 4.19F 2 Jh CS LOWER BAFFLES A 710430 CO 57 4.774 -4 s

4D CS L0uER BAFFLES A 740430 CO 60 3.39E 2 CS LOWER BoFFLES A 710430 NI 63 2.76E i CS THERMAL SHIELD A 710430 C 14 1.08E-6 CS THERMAL SHIELD A 710430 V 49 4.2038 CS THERMAL SHIELD A 710430 MN 54 1.52E 1 l CS THERMAL SHIELD A 710430 FE 55 4.32E 3 l

CS THERMAL SHIELD A 710430 CO 57 1.0711 l

CS THERMAL SHIELD A 710430 C0 60 4.34E 3 CS THERMAL SHIELD A 710430 NI 63 1.09E 2 CS UPPER BAFFLES A 740430 C 14 5.46E-7 CS UPPER BAFFLES A 740430 V 49 f.78E-i CS UPPER BAFFLES A 710430 MN 54 2.2474 CS UPPER BAFFLES A 740430 FE 55 8.16E 2 CS UPPFR BAFFLFS A 740430 CO 57 4.59E-1 CS UPPER RAFFLES A 710430 CO 60 6.76E 2 CS UPPER BAFFLFS A 710430 NI 63 5.52E 1 CS VESSEL. BASE A 710430 C 14 8.75E-8 CS VESSEL BASE A 710430 MN 54 4.9876 C5 VESSEL 8ASE A 740430 FE 55 7.92E 2 CS VESSEL BASE A 710430 CO 60 4.33E 1 LEAD OUTER THERMAL SHIELD A 710430 V 49 7.99E-5 LEAD OUTER THERMAL SHIELD A 740430 MN 54 1.i?E-3 LEAD OUTER THERMAL SHIELD A 710430 FE 55 4.13E-1 LEAD OUTER THERMAL SHIELD A 740430 CO 57 6.05E-5 LEAD OUTER THERMAL SHIELD A 710430 CO 60 3.13E-4 LEAD OUTER THERMAL SHIELD A 710430 NI 63 2.0436 LEAD OUTER THERMAL SHIELD A 740430 AG 108 1.46E-8

._ . . + , - , ,

. ERR 1 U.N.C. DECOMMISSIONING DATA SYSTEM - RADIONUCLIDE INVENTORY H1134 e . . A.NE ASUR. (-- RADIONUCLIDE ).

eSYS/ COMP. ./.EMENT'. . . CURIES. DPM/ .

  • NUMBER . SOURCE MATERI AL DESCRIPTION .C. DATE . NAME . CURIES .FTes3 .100CM2.

n========..........................==========.........a=====.=======.======.======.===

LEAD OUTER THERMAL SHIELD .A 710430 CD 909 2.52E-9 LEAD DUTER THERMAL SHIELD A- 740430 AG 110 4.54E-2 LEAD OUTER THERMAL SHIELD A 710430 CD 113 1.20E-9 LEAD OUTER THERMAL SHIELD A 740430 SN 113 6.85E-7 LEAD OUTER THERMAL SHIELD A 710430 SN 119 5.57E-6 LEAD OUTER THERMAL SHIELD A 710430 SN 121 1.72E-6 LEAD OUTER THERMAL SHIELD A 710430 SN 123 3.86E-9 LEAD OUTER THERMAL SHIELD A 710430 S8 425 4.31E-4 LEAD BOTTOM PLUG A 710430 H 3 4.49E-8 LEAD BOTTOM PLUG A 710430 C 14 3.20E-5 LEAD BOTTOM PLUG A 710430 AR 39 1.26E-7 LEAD BOTTOM PLUG A 710430 CA 45 8.94E-5 LEAD BOTTON PLUG A 710430 V 49 9.3E-14 LEAD BOTTOM PLUG A 710430 MN 54 3.32E-3.

LEAD BOTTOM PLUG A 710430 FE 55 6.30E-1 LEAD BOTTOM PLUG A 740430 CO 57 7.0E-14 LEAD BOTTOM PLUG A 710430 CO 60 5.54E-3 LEAD BOTTOM PLUG A 710430 NI 63 1.7E-it LEAD BOTTOM PLUG A 710430 AG 108 9.6E-12 LEAD BOTTOM PLUG A 710430 CD 109 2.9E-18 LEAD BOTTON PLUG A 710430 AG 110 3.8E-14 LEAD BOTTOM PLUG A 710430 CD 113 1.4E-18 Jh LEAD BOTTOM PLUG A 710430 SN 413 5.7E-16 g

LEAD BOTTOM PLUG. A 740430 SN 119 4.8E-15 C"3 LEAD BOTTOM PLUG A 710430 GN 121,4.4E-15 LEAD BOTTOM PLUG A 710430 SN 123 4.0E-18 LEAD BOTTON PLUG A 710430 S8 425 1.1E-43 ZR SHROUD A 710430 C 44 6.22f-7 2R SHROUD A 710430 V 49.9.87E-3 ZR SHROUD A 710430 MN 54 5.12E-2 ZR SHROUD A 710430 FE 55 8.5731 ZR SHROUD A 7104]J CO 57 7.81E-3 ZR SHROUD .A 740430 CO 60 2.28E 2 ZR SHROUD A 710430 NI 63 *.2428 ZR SHROUD A 710430 CD 409 ./7E ZR SHROUD A 710430 CD 143 .29E-5 ZR SHROUD A 710430 SN 143 .47E-2 ZR SHROUD A 710430 SN 119 1 02E-1 ZR SHROUD A 710430 6N 121 2.73E-2 ZR SHROUD A 710430-SN 123 8.e9E-5 ZR SHROUD A 710430 S8 125 2.23 304 SS CORE PLATE A 740430 C 14 5.49E-7 304 SS CORE PLATE A 710430 V ^49 4.57E-1 304 SS CORE PLATE .A 710430 MN 54 6.7345 304 SS CORE PLATE A 710430 FE 55 4.12E 3 304 SS CORE PLATE A 710430 CO 57 3.46E-1 304 SS CORE PLATE A 710430 CO oo 8.58E 2 304 SS CORE PLATE A 710430 AG 108 5.54E i 304 SS PRESSURE CLAD A 710430 V 49 1.63E-2 304 SS PRESSURE CLAD A 740430 MN 54 2.40E-1 304 SS PRESSURE CLAD A 710430 FE 55 1.52E 2

t H1136

.FRRt U.N.C. DECOMMISSIONINO DATA SYSTEM - RADIONUCLIDE INVENTORY e .. . A.MEASUR. (-~ -RADIONUCLIDE 7.

./.EMENT . . . CURIES. OPM/ .

e5fS/ COMP.

  • NUMBER . SOURCE MATERIAL DESCRIPTION .C. DATE , NAME . CURIES .FTee3 .400CM2.

e................................................................

304 SS PRESSURE CLAD A 710430 CO .57 4.23E-2 304 SS PRESSURE CLAD A 710430 CO 60 4.16E 2 304 SS PRESSURE CLAD 'A 740430 NI 63 7.4913 304 SS SHROUO A 710430 C 44'1.92E-7 304 SS SHROUD A 710430 V 49 4.70E-1 304 SS SHROUD A 710430 MN .54 2.4984 304 SS SHROUD A 740430 FE SS 4.16E 2 304 SS SHROUD A 740430 CO 4.28E-9 A 710430 CO 57 60 ,3.18E 2 304 SS SHROUD 304 SS SHROUD A 710430 NI 63 8.7922 304 SS SHROUD PLAIE. A 710430 C 14 8.28E-8 304 SS SHROUD PLATE .A 710430 V 49 7.29E-2 304 SS SHROUD PLATE A 710430 MN S4 1.0748 304 SS SHROUD PLATE A 740430 FE: SS 1.79E 2 304 SS SHROUD PLATE A 710430 CO 57 S.53E-2 304 SS SHROUD PLATF A 710430 CO 60 4.37E 2 '

304 SS SHROUD PLATE A 740430 NI 63.8.7922 304 SS SUPPRT BARREL A 740430 C 14 2.50E-8 304 SS SUPPRT BARREL A 740430 V 49 2.20E-2 304 SS SUPPRT BARREL A 710430 MN S4 3.24E-1 304 SS SUPPRT: BARREL A 710430 FE SS S.40E i ,

304 SS SUPPRT BARREL A 710430 CO S7 4.67E-2 304 SS SUPPRT BARREL -A 710430 CO 60 4.13E 1 Jh 304 SS SUPPRT BARREL A 710430 NI 43 2.6S31 430 SS INSULATION. A 710430 C 14 4.20E-9 L

.a 430 SS INSULATION A 710430 V 49 3.50E-4 430 SS INSULATION A 710430 MN' 54 6.87E-3 430 SS INSULATION A 710430 FE- SS t.2182 430 SS INSULATION A 790430 CO -S7 8.69E-6 430 SS INSULATION A 710430 CO 60 7.93E-1 430 SS INSULATION A 710430 NI 63 1.46E-3 i

{

.ERRt UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE 81122 e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. 4CTUL.

eACTIVITY. COST ITER / .SYS/ COMP.A. START-.COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY . NUM8ER .T.DATE .DATE . HOURS. COST S . REM . DATE .DATE . HOURS. COST S . REM .-

=========.===================s..s======.m.m=====.======.me===.=======,=====.======.s=====.===ne.as=====.me===.

. COMMENT DATA IN THIS REPORT WAS TAKEN FROM THE FINAL ELK RIVER REACTOR

. PROGRESS REPORT DATED NOVEM8ER 4974. BLANK SPACES SHouN IN THIS

. REPORT REPRESENT DNA (DATA NOT AVAILASLE). DISCREPANCIES BETWEEN

. ESTIMATED AND ACTUAL COSTS CANNOT BE EXPLAINED FROM EXISTING

. DOCUMENTED INFDRMATION.

04 SITE AND FACILITY e PREPARATION 01.00 UPA INDIRECT LA8DR 62640 62660 04.00 UPA INDIRECT SURDEN 40420 -40420 01.00 UPA DIRECT LA80R 41827 11827 01.00 .UPA DIRECT SURDEN. 7595 7595 01.00 SECURITY FENCE 3180 3275 01.00. GUARD STATION 2050 2586 01.00 POLE SHED 3830 3653 01.00 -PAVING 6530 6525 04.00 TEMP UORK BUILDING 63300 68908 09.00 CHANGE ROOM. LAUNDRY 25000 14591 e LARGE ACCESS HATCH 01.00 CONTAINMENT OPENING 41850 47670 m FLOOR HATCH. SHORING i"

d e

a.

SHORING SASEMENT LEVEL FLOOR BJ 01.00 VIBRATION 40NITOR 3000 3441 e EQUIPMENT 04.00 PIONEER POWER LA80R 998 m PERSONNEL 01.00 MATERIALS. TRAVEL. 28600 28600 e PERSONNEL RELOC.

01.00 TRAVEL 2760 01.00 REMODEL FLUIDYNE SLD 400 1272 01.00 TEMP TRAILER RENT 480 m FOR GUARDS ,

01.00 - MISCELLANEOUS ITEMS 3188 i OTHER INDIRECT 197568 149923

  • (U.0.1300-)W.O.17003 01.00 CONTINGENCY 20890 m TOTAL FOR ACTIVITY SPEC 01 438700 460372

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR U'.O. 1300 THRU U.0. 1700

. ARE LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM UORK SHEETS.

. DISCREP ANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT 8E

. EXPLAINED FROM AVAILA8LE DOCUMENTATION.

a01.00 HEALTH PHYSICS 47300 m W.O.1300'

.e01.00 OPERATING ANO. .34520 m MAINT. COSTS e 'W.O.1400

  • 04.00 SECURITY COSTS 43485

. ERR 1 UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE B'1122 e . . .C*SCHED .SCHED .ESTIM. .ESTIN. ACTUAL. ACTUAL.ACTUL. .ACTUL.

eACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY . NUfGER .T.DATE .DATE . HOURS. COST S . REM . DATE .DATE . HOURS. COST $ . REM .

e... ........ .......... . ... ...,.......... .................. ........... ... ...........

e W.O.1S00 e04.00 ENGINEERING & 3495S e ADMINISTRATIVE

,

  • W.O.1400 l e01.00 STORAGE a S200

! e WAREHOUSING i e W.O.1700 l e TOTAL FOR W.O.1300-1700 137440 1

l 02 REMOVAL OF PIPING 4

! e ANC EDUIPMENT 02.04 UPA LA80R & BURDEN 02.01 UPA DIRECT LA804 33400 27993 02.01 UPA DIRECT LA80R 23112 19250

  • SURDEN 02.02 SU0 CONTRACTORS 02.02 PIONEER POWER.INC. 415S0 S4039 e PERSONNEL) 02.02 ENGINEERING CONSULT. 4000 Je 02.02 HEROSTSSONS CONSTR. 4S00 3444 f a CO..INC.(RIGGING)

{j 02.03 OTHER COSTS 02.03 POWER SAWS 1900 4614 02.03 WELDING EQUIPMENT 2000 31 02.03 SCAFFOLDING 2400 02.03 CUTTING TORCH GAS 3000 m ($200/MO) 02.03 MISCELLANEDUS ITEMS -404 02.03 OTHER INDIRECT 107008 190049 i 9 (W.O.1300->47003 02.03 CONTINGENCY 40742 e TOTAL FOR ACTIVITf SPEC 0? 303712 301734

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR u.0. 1300 THRU W.O.4700

. ARE LISTED BELOW. BREAKDOWN CDSTS WERE TAKEN FROM WORKSHEETS.

. DISCREPANCIES BETWEEN OREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILAOLE DOCUMENTATION.

e02.03 HEALTH PHYSICS 4023S e W.O.1300 e02.03 OPERATING AND 43940 m MAINT. COSTS e W. O. 1400

  • 02.03 SECURITY COSTS 17170 e W. O. iS00 a02.03 ENGINEERING t 470SS e ADMINISTRATIDN e W. O. 4400 e02.03 STORAGE AND 4420

.ERRi UNC DECOMMISSIONINO DATA SYSTEM - PROJECT COST / EXPOSURE B1422

  • . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.4CTUL.. .ACTUL.

e4CTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

FSPEC NO . ACTIVITY , NUMBE .DATE. . HOURS. COST S . REM . DATE .DATE . HOURS.CDST S . REM .

.....................................S..T.DATE e

WAREHOUSING e 6. O. 1700 e TOTAL FOR W.O.1300-1700 17SO40 e

e e

03 REMOVAL OF SUPERHEAT e ER AND SUPERHEATER e BUILDING e

03.01 UPA LA80RtSURDEN 03.01 UPA DIRECT LA8OR 10933 8490 03.01 UPA DIRECT BURDEN 655S 49S3 03.02 SUBCONTRACTORS 03.02 STRACT CONST. 1000 e (SUPERHEATER WALL e REPAIR) 03.02 STRACT CONST. 4700 e (SUPERHEATER ROOF

< e REPAIR) 4, 03.02 PIONEER POWER INC. 1400 iS00 g e (PERSONNEL) d 03.02 REMOVE BUILDING 24000

  1. " 03.02 HER8STsSONSCREROVE 24700 24700 m SUPERHEATER )

03.02 FOUNDATION PREP iS000 03.03 OTHER COSTS 03.03 TOOLS 2000 03.03 MISCELLANEOUS ITEMS -268 03.03 OTHER INDIRECT (W.O. 2632S 43774 e 1300->1700 03.03 CONTINGENCY SS46 e TOTAL FOR ACTIVITY SPEC 03 196459 88846

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR W.O. 1300 THRU W.O. 1700

. ARE LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILA8LE DOCUMENTATION.

03.03 HEALTH PHYSICS 13810

! a W.O.1300

  • 03.03 OPERATING AND 40080 m MAINT. COSTS e W.O.1400
  • 03.03 SECURITY COSTS 393S e W.O.1S00 n03.03 ENGINEERING AND 40790 m ADMINISTRATION e W.O.1600 e03.03 STORACC AND iS20

.ERRt UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE B1422

.C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. .ACTUL.

e . .

eACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY NUMBER .T.DATE .DATE . HOURS. COST $ . REM . JATE .DATE . HOURS. COST $ . REM

=========.s===================.m=======. .======..=====.s====.=======.=====..=====.======.m====.=======.=====.

e WAREHOUSING e W.O.1700 4013S e TOTAL WO 1300-6700 ->

04 REMOVAL OF PASSAGE-e WAY AND EQUIPMENT e

04.01 UPA LA80R. BURDEN 64 04.01 UPA DIRECT LABOR 6970 4930 42 04.01 UPA DIRECT BURDEN 04.02 SUBCONTRACTORS 4268 04.02 PIONEER POWER INC.

m (PERSONNEL) 43000 343S0 04.02 HERBSTtSONS(REMOVAL e DF SLDG. FOUNDATION

  • PREP.tEQUIP. S2SO 04.02 REPAIR PASSEGEWAY e TUNNEL 04.03 OTHER COSTS 47 g, 04.03 MISCELLANEDUS ITEMS 47626 04.03 OTHER INDIRECT (W.O. 18117 d a 1300-17003 22970 CM CONTINGENCY 17S05 87522 68994 m TOTAL FOR ACTIVITY SPEC 04

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR W.O. 1300 THRU W.O. 1700 ARE

. LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILA8LE DOCUMENTATION.

734S e04.03 HEALTH PHfSICS e W.O.1300 S340

  1. 04.03 DPERATING AND e MAINT. COSTS e W.D.4400 209S

=04.03 SECURITY COSTS

  • W.O.1S00 5740 a04.03 ENGINEERING t
  • ADMINISTRATIVE

( e W.O.1600 805 a04.03 STORAGE AND e WAREHOUSING e W.O.4700

  • TOTAL FOR W.O. 1300-1700 21345 e

e e

OS REMOVAL DF VESSEL (2

e INTERNALS

.ERRt UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE B1122 e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. .ACTUL.

eACTIVITY. COST ITEM / .SYS/Cowe.4. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY . MUMBER .T.DATE .DATE . HOURS. COST S . REM . DATE .DATE . HOURS. COST S . REM .

Gemsmessa,assssssssssssssssses, assesses,s,ssessa.ssemes. amass.ssssmas,sessa,assses,assses,sesse,asasses. amass, t 05.04 UPA LA80R & BURDEN i

05.01 UPA DIRECT L400R 31520 13199 05.01 UPA BURDEN ON 21074 8420 e DIRECT LA80R 05.02 SU8 CONTRACTORS 05.02 METCON. INC. 3217 05.02 HERBST 4 SONS 14094

  1. CONSTRUCTION CO.

05.02 ORNL (TOOLING. DESIGN 341000 307402 e & DEVEL.3 05.02 PIONEER POWER. INC. 10600 47066 e (PERSONNEL 3 3- 05.02 ENGINEERING CONSLT. 10000 OTHER COSTS 05.03 05.03 RADIDACTIVE MATRL 6000 e CONTROL (MTLtEGUIP3 05.03 GAS & POWER 4000 41196 05.03 MOCK-UP AT ERR 6000 05.03 TRAVEL (PRIMARILY 19073 e OPERATING TRAINING e AT ORNL) a 9637 05.05 MISCELLANEDUS ITEMS d

05.05 OTHER INDIRECT COST 425446 28856 Ch a (W.O. 1300-47003 05.05 CONTINGENCY 423847 e TOTAL FOR ACTIVITY SPEC 05 949487 785410 NOTE: BREAKDOWN OF ACTUAL COSTS FOR W.O. 4300 THRU W.O. 1700 ARE

. LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILABLE DOCUMENTATION.

  • 05.05 HEALTH PHYSICS 44386 e W.O.1300 e05.05 OPERATING ANO 83090 m MAINT. COSTS e W.O.1400 n05.05 SECURITY COSTS 32455

~

e W.O.4500

  1. 05.05 ENGINEERING & 89945 e ADMINISTRATIVE o W.O.1600 e05.05 STORAGE ANO 12545 e WAREHOUSING e W.O.4700 m TOTAL FOR W.O. 1300-4700 330870 04 REMOVAL & DISPOSAL 45

. ERR 4 UNC DECOMMISSIONING DATA SYSTEM - PROLJECT COST / EXPOSURE 31422 e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. .ACTUL.

eACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC MO , ACTIVITY . MUM 8ER .T.DATE .DATE . HOURS. COST S . REM . DATE .DATE . HOURS. COST S . REM .

e................. .................................... ...................... ............................

e OF PRESSURE VESSEL 06.01 UPA LA00Rt80RDEN 06.01 UPA DIRECT LA80R 29975 6269 06.01 UPA BURDEN ON 19746 3664 e DIRECT LA80R 06.02 SU8 CONTRACTORS 06.02 ORNLETDOLING. DESIGN 400000 489782 e & DEVEL.)

06.02 PIONEER PDUER INC S0000 70204 e (PERSONNEL) 06.02 ENGINEERING CONSLT. 40000 06.02 HERSSTtSONS CONST. 244Si e CO..INC.

06.02 METCON INC. 4:s14 06.03 OTHER COSTS 06.03 RAOIDACTIVE MATER- 1000 e IALS CONTROL e (MATL & EDUIP) 06.03 GAS & POWER 4000 10684

& 04.03 MOCM UP AT ERR 3000 s 06.03 VESSEL CLOSURE 4000

[j e PLATES 06.03 TRAVEL 7244 06.03 9MISCELLANEDUS ITEMS 13929 06.03 OTHER INDIRECT COST 120884 429S99 m (WO 4300-17003 06.03 CONTINGENCY iS9900 m TOTAL FDR ACTIVITY SPEC 06 799S02 4057337-

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR W.O. 1300 THRU W.O. 4700 ARE

. LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES SETWEEN BREAKDOWN COSTS ANO TOTALS CANNOT BE

. EXPLAINED FROM Ave!LASLE DOCUMENTATION.

e06.03 HEALTH PHYSICS 13S900 m W.O.4300

  • 06.03 DPERATING AND 9947S
  • MAINT. COSTS e W.O.4400 e06.03 SECURITY COSTS 3873S e W.O.1S00 e06.03 ENGINEERINr a 106460 m ADMINISTRATIVE e W.O.1600
  • 06.03 STORAGE AND 44940 e WAREHOUSING e W.O.4700 m TOTAL FDR W.D. 1309-1700 394940-

. ERR 4 UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE 84122 e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. .4CTUL.

eACTIVITY. COST ITEM / .SYS/ COMP.A. START..COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY . NUMBER .T.DATE .DATE . HOURS. COST 8 . REM . DATE

....................................,...............................................DATE . HOURS. COST S . REM- ..

07 REMOVAL & DISPOSAL e 12 OF BIOLOGICAL SHIELD 07.01 UPA LABOR & BURDEN 07.04 UPA L A80R & SURDEN 07.01 UPA DIRECT LA80R 14850 6018 07.01 UPA BURDEN ON DIREC.T 9652 3S83 e LA80R 07.02 SU8 CONTRACTORS 07.02 AIR POWER EQUIP. CORP 5500 m (RESTOCK CHANGE ON e INGERSOLL HYDR A8 DOM) 07.02 TRADE TOOLSti DARDA 3037, a SPLITTER) 07.02 TRADE TOOLSCSTEEL 39 e DRILLS) 07.02 ' EQUIP. NOT RECOVER- 3196 e A8LE (SPECIALTY e DEMOLITION) 07.02 CONCRETE SAMPLING 3972

! e (SPECIALTY DEMO) i'

-- e 07.02 CONCRETE REMOVAL (CONTAMINATED 37500 0 m CONCRETE ONLY) 07.02 PIONEER POWER INC 77496 e (PERSONNELJ 07.02 INSTRUMENT TUBE 20000 69000 m REMOVAL (SPECIALTY a DEMOLITION) 07.02 ENGINEERING CONSLT. S000 38382 e (ATA) 07.02 HER8STsSONS 499693 07.02 MINNEAPOLIS EQUIP. S447 07.02 HAYDEN-MURPHY EQUIP. 3S11 07.03 OTHER COSTS 07.03 SPECIAL TOOLING 4000 07.03 LOADING BASKET 4000 07.03 SHIELDING UORK 8000 e PLATFORM /

07.03 TRAVEL 5448 07.03 OTHER MATRL. COST 871 e IN CONNECTION WITH e CDRE DRILLING 07.03 MISCELLANEOUS ITEMS 24140 07.03 OTHER IMOIRECT COST 432903 474404

  • (WO 1300-17003 07.03 CONTINGENCY 116452 e TOTAL FDR ACTIVITY SPEC 07 349357 1222707

. NOTE: BREAKDOWN OF ACTUAL COSTS FDR W.O. 1300 THRU W.O. 1700 ARE

. LISTED BELOW. BREAKDOWN COSTS WERE TAKEN FROM WDRM SHEETS.

B4122

. Erat UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE .ESTIM. ACTUAL. ACTUAL.ACTUL. .ACTUL.

e . . .C.SCHED .SCHED .ESTIM. .

  • ACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN.

ACTIVITY NUMBER .T.DATE .DATE . HOURS. COST S . REM . DATE .DATE . HOURS. COST S . REM eSPEC NO . .

s==.======... ===.......=======. .....

e========.====================. s=====.............===.=====.=======..

. DISCREPANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILA8LE DOCUMENTATION.

148840

  • 07.03 HEALTH PHYSICS m W.O.1300 109340 07.03 OPERATING AND
  • MAINT. COSTS e u.0.1400 42715
  • 07.03 SECURITY COSTS l e W.O.1500 417065 (

e07.03 ENGINEERING &

  • ADMINISTRATIVE e W.O.1600 16475
  1. 07.03 STORAGE AND e UAREHOUSING e U.0.1700 TOTAL FOR W.O. 4300-1700 435475 m

08 REMOVAL OF REACTOR Ja e BUILDINGESTRUCTURES I

"" 08.01 UPA LABOR AND BURDEN 21303 1722 U 08.01 UPA DIRECT LABOR 1095 13833 08.01 UPA BURDEN ON DIRECT e LABOR l 08.02 SU8 CONTRACTORS 8045 08.02 PIONEER POWER INC e (PERSONNEL) 337709 685800 08.02 HERBSTtSONS(REMOVAL e OF CONCRETESSTEEL e LINER) 5000 5942 08.02 ENGINEERING CONSLT.

e (ATA) 3972 08.02 SPECIALTY DEMOLITION m (CONCRETE SAMPLES) 3389 08.02 HAYDEN-MURPHY EQUIP. -25000 08.02 SAM BLOOM IRONtMETAL m CSALE OF STEEL LINER 08.03 OTHER COSTS 89 08.03 MISCELLANEOUS ITEMS 44922 OTHER INDERECT COST 79494 08.03 m (WO 1300-17003 201282 08.03 CONTINGENCY 1006412 398855 m TOTAL FOR ACTIVITY SPEC 08 1700 ARE LISTED

. NOTE: BREAND0uN OF ACTUAL COSTS FOR W.u. 1300 THRU U.0.

. BELOW. BREAKD0uN COSTS WERE TAKEN FROM WORK SHEETS. DISCREPANCIES

. BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE EXPLAINED FROM

. AVAILABLE DOCUMENTATION.

.ERRi UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE 8 ti22 e . . .C.SCHED .SCHED .ESTIM. .ESTIM.4CTUAL. ACTUAL.ACTUL. .ACTUL.

eACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN .

eSPEC NO . ACTIVITY . NUMBER .T.DATE .DATE . HOURS. COST S .REN . DATE .DATE . HOURS. COST $ .REN ..

e08.03 HEALTH PHYSICS 19540 l e W.O.1300 I

=08.03 DPERATING AND 14260 e MAINT. COSTS e W.O.1400 e08.03 SECURITY COSTS 5570 e W.O.1500 e08.03 ENGINEERING ANO 15265 e ADMINISTRATIVE e W.O.1600

  • 08.03 STORAGE AND 2150 e UAREHOUSING e W.O.1700 e TOTAL FOR W.O. 1300-1700 S6785 l

09 REMOVAL DF MISC.

s EOUIPMENT  ;

09 Ai UPA LA60R 4 80RDEN j' P9.01 UPA DIRECT LABOR 4000 12 m 09.01 UPA BURDEN ON 2600 7 C3 e DIRECT LA80R 09.03 OTHER COSTS 09.'03 OTHER INDIRECT COST 11902 09.03 CONTINGENCY 4626 e TOTAL FOR ACTIVITY SPEC 09 23428 19 10 MATERIAL DISPDSAL 10.01 UPA LABOR & OURDEN 10.01 UPA DIRECT LASDR 50534 9751 10.01 UPA BURDEN ON DIRECT 31685 '6552 e LA8OR 10.02 SU8 CONTRACTORS 10.02 PIONEER POWER INC 50965 m (PERSONNEL) 10.02 ENGINEERING CONSLT. 2000 10.03 OTHER COSTS 10.03 PLYWOOD BOXES 6750 6800 10.03 SPECIAL PLYWOOD 250 30660 e BOXES 10.03 STEEL DRUMS 10880 8123 10.03 FIBER DRUMS 2450 10.03 ANL BINS 5250 8440 10.03' TRAVEL 6361 ~/-

10.03 MISCELLANESUS ITEMS 22771

UNC DFCOMMISSIONING DATn SYSTEM - PROJECT COST / EXPOSURE B1122

. ERR 4 .ACTUL.

e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL.

mACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN eSPEC NO . ACTIVITY . NURSER .DATE . HOURS. COST s . REM . DATE .DATE . HOURS. COST s . REM .

.e==.....................................T.DATE.......................................................................

74000 270415 10.03 CASK RENTALaLINERS 178857 10.03 TRANS TO SURIALSITE 56700 10.03 SPECIAL CASKtLINERS 33000 45700 134230 10.03 BURIAL COSTS 54 10.03 NON-CONTAMINATED 13000 e MATERIAL 600 789 10.03 BANDING MACHINE 394856 509289 40.03 OTHER INDIRECT COST e (WO 1300-17003 10.03 CONTINGENCY 181914 909569 1244054 m TOTAL FOR ACTIVITY SPEC to

)

. NOTE: BREAKDOWN OF ACTUAL COSTS FOR W.O. 1300 THRU 1700 -J

. ARE LISTED BELOW. SREAMDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES BETWEEN BREAKDOWN COSTS AND TOTALS CANNOT BE

. EXPLAINED FROM AVAILABLE DOCUMENTATION.

160730

  • 10.03 HEALTH PHYSICS m W.O.1300 197290 i e40.03 OPERATING AND e MAINT. COSTS i 45 g a W.O.4400 4581S i i e10.03 SECURITY COSTS l PO e .W.O.1500 425555 m10.03 ENGINEERING e e ADMINISTRATIVE e W.O.4600 - 17670 m10.03 STORAGt AND m WAREHOUSING e W.O.1700 447060 e TOTAL FOR W.O. 1300-1700 --)

11 FACILITY CLOSE00T 11.01 UPA LABOR & BURDEN 173 14.01 UPA DIRECT LA80R 40054 6529 409 11.04 UPA BURDEN ON DIRECT e LABOR 41.02 SU8 CONTRACTORS

/955 11.02 SPECIALTY DEMOLITION m (SAMPLING) 4816 14.02 PIONEER POWER INC e . (PERSONNEL) 14.02 FIX STEAM PLANT WALL 2600 15000' 3000 i 41.02 FILL TO GRADE 11.02 REMOVE TEMP BLDG 5000 m a STRUCTURES l 14.02 ENGINEERING CONSLT. ~-3000 n (FINAL REPORT) 11.03 OTHER COSTS

. ERR 4 UNC DECOMMISSIONING DATA SYSTEM - PROJECT COST / EXPOSURE 81122 e . . .C.SCHED .SCHED .ESTIM. .ESTIM. ACTUAL. ACTUAL.ACTUL. .4CTUL.

  • ACTIVITY. COST ITEM / .SYS/ COMP.A. START .COMPL . MAN .ESTIMTD. MAN . START .COMPL . MAN . ACTUAL . MAN -.

eSPEC NO . ACTIVITY . NUMBER .T.DATE .DATE . HOURS. COST $ . REM . DATE .DATE . HOURS. COST $ .PEM .

essamassa.ssamassamassassesses.assumess a.essses.essses.essas.sassass esess esessa. masses. amass.wassses.ssass, 11.03 TRAVEL 1040 11.03 MISCELLANEOUS 10422 11.03 OTHER INDIRECT COST 4954S 85263 e (WO 1300-1700) ti.03 CONTINGENCY 22932 e TOTAL FDR ACTIVITY SPEC it 114660 109748

. NOTE: .OREANDOWN OF ACTUAL COSTS FOR W.O. 1300 THRU W.O. 1700 ARE

. LISTED BELDW. BREAKDOWN COSTS WERE TAKEN FROM WORK SHEETS.

. DISCREPANCIES BETWEEN COSTS AND TOTALS CANNOT BE EXPLAINED

. FROM AVAILASLE DOCUMENTATION.

mit.03 HEALTH PHYSICS 26885 e W.O.1300 e11.03 OPERATING AND 19620 m MAINT. COSTS e W.O.4400 .

eti.03 SECURITY COSTS 766S e W.0.1500 .

  • 11.03 ENGINEERING & 24000 Jh e ADMINISTRATIVE s e W.O.1600 hj $ #14.03 STORAGE ANO 2955 e WAREHOUSING e W.O.4700

.e TOTAL FOR WO 1300 - 1700 --> 78425

U.N.C. DECOMMISSIDNING DATA SYSTEM - DOSE RATL G1114

.ERRi DPM .NEASUR.

e . . . . . DPM e MAP , ELEV . MAP .SYS/ COMP. .MR/HR .MR/HR .100CM2.100CM2.EMENT .

, BUILDING . FEET .C00RD. NUMSER .TYP. LOWER . UPPER . LOWER . UPPER . DATE . COMMENT e REFERENCE s============..........===.=====. .===.========.m==.........=====.......................========================================

. NOTE: ALL BALNK ENTRIES INDICATE THAT DATA WAS NOT AVAILA8LECDNA)

CON 33500 710602 OUTSIDE FRESSURE VESSEL CON 828000 710602 INSIDE INNER.TH. SHIELD CON 6.0E 6 DNA 710602 CORE a SHROUD PLATES CON 2.4E 6 710602 UPPER BAFFLE PLATE COR SHA000 SHIELD)

CON 3150 710602 CORE SAMPLE SIOLOGICAL SHIELD CON 6S0 710602 CORE SAMPLE BIOLOGICAL SHIELD CON 350 S00 710602 PRIMARY DATER SYSTEM PIPING CON 800 710602 PURIFICATION SYSTEM PIPING CON 220 710602 PURIFICATION SYSTEM PIPING CON 135 740602 PURIFICATION SYSTEM PIPING CON 200 710602 DECAY HEAT REMOVAL SYSTEM CON ISO 710602 DECAY HEAT REMOVAL SYSTEM CON iS00 710602 FUEL ELEMENT STOR AGE WELL COGLING SYSTEM CON 350 710602 FUEL ELEMENT STORAGE WELL CDOLING SYSTEM CON 20000 710602 LIQUID WASTE SYSTEM CON 170 710602 LIQUID b4STE SYSTEM CON 230 710602 REACTOR WATER COLUMN SYSTEM CON 120 710602 REACTOR SUB BASEMENT FLOOR AREA .

CON 2S 400 710602 REACTOR MAIN FLOOR LEVEL Jh 9

N l Od j l

. . . - - . _ . ~ . - _ _ - . - -~ . +

U.N.C. DECOMMISSIONING DATA SYSTEM - PROJECT LABOR F1132

. ERR 1 eACTIVITY. . . MAN.LA80R . MAN .

eSPEC NO . DATE . LA80R CATEGORV- .uKS. COST S. REM .

m.................................................... ............................... *

. NOTE: ALL BLANK FNTRIES INDICATE THAT DATA WAS V97 AVAILABLE(DNA3 71 ADMINISTRATIVE STAFF 188 1 72 ADMINISTRATIVE STAFF 443 73 ADMINISTRATIVE STAFF ^ .336 74 ADMINISTRATIVE STAFF 176 71 HEALTH & SAFETY PERSONNEL 298 72 HEALTH t SAFETY PERSONNEL 613 73 HEALTH t SAFETY PERSONNEL S28 74 HEALTH & SAFETY PERSONNEL 202 >

71 CLERIC 4L 4 SERVICES 138 72 CLERICAL & SERVICES 366 73 CLERICAL & SERVICES 303 74 CLERICAL 4 SERVICES 129 71 INSTRUMENT TECHNICIANS 14 72 INSTRUMENT TECHNICIANS' 52 73 INSTRUMENT TECHNICIANS 26 74 INSTRUMENT TECHNICIANS 74 ELECTRICIANS '15 72 ELECTRICIANS 52 73 ELECTRICIANS 29 74 ELECTRICIANS e 56 71 72 REACTOR OPERATORS REACTOR OPERATORS 404 y 73 REACTOR OPERATORS 73 g 74 REACTOR [.PERATORS . 35 71 DECONTAMINATION TECHS- 42 72 DECONTAMINATION TECHS 419 73 DECONTAMINATION TECHS iii 74 DECONTAMINATION TECHS 46 71 SECURITY GUARDS 223 72 SECURITY GUARDS .520 73 SECURITY GUARDS 163 74 SECURITY GUARDS 32 e

e NOTE--- DATA ON MAN-REM SY LA80R CATEGORY IS NOT AVAILA8LE.

  1. -MONTHLY ACCUMULATION OF PERSONNEL EXPOSURE IS RECORDED BELOW.
  1. 7201 1.7 7202 2.2 7203 4 7204 4.i 7205 .3 7206 1.3 7207 2.2 7208 2.7

.7209 2.2 7210 3.5 7244 2.7

-7301 .6.S 7302 6.8 7303. S.i 7304 S y . g L___________.________._____._____ . _ . _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _ _ . _ . . _ _ . .

. ERR 1 U.N.C. DECOMMISSIONING DATA SYSTEM - PROJECT LABOR Ft132

  • ACTIVITY. . . MAN. LABOR . MAN .

eSPEC NO . DATE - LABOR CATEGORY .UKS. COST S. REM .

e========.======. ========================.===.======.====.========================

7305 3 7306 13.8 7307 5.2 7308 .2 7309 .4 7310 .3 7311 1 7312 6.8 sn N

6 9

i N - >

.> M w N - NN W J C O N .J 2 ..W G 2 2 N

d . 4'a W > 4 L- C-3'O 2 M

M N & O E & M . CO M N E t' M M 4- 4 A Z 'M .' EW of > J- 4 -

N M Xw 3 e e N' U' OWM vs ' O N E-' WHO - O O N O J 4% E 2-2

, N - W'W OJR W M M N

2 N '- J 'M 2 - -@

40 laJw e. M M '

ON MN - M 5 W DWO -

ku WJ

. MOW. O e CD M

&N 4 Whw 2 OM M MN - Q- ZA2 4 JE. E EN . E 03M We e UN 'W - E 2M C MW W MN & W W J 2 2Q Q WN A 6 EW4 M M -

ON 3 4 O W22e3EE E W N OE 3 J5 W>

WM 4 4MOU4 -Q (M M WN-* O 2 EMW X UW k ON eO M4J25 W M O kN 2MM eOO H C 4 kN Oke W 2 E 2 O O WW MJ4 HW4MW W .JM M N WOW COZMR. E 00- O 44 4e2 E4 JZ O M4 4 WN E W WECOM W mE E (N COE We e Ju 4R E4C - EC2m HQ k MkOMOM N

W mowW OWJZO W OROW2W2 3 WO JOJO N 2 e>JJOO *HMJJMJM N .WMWMkW402MEH4 CHOW N

s HEHWM3M tMWO4}K4E4 0400EEUOkumECHEWE N EWEWE WJHWEWE2W2W N W I W M W O A C 3 M 3 4 W'O t O E

, , , N, EMELEMMZUAMOEUOuc

-MOHN

  • OWOW
  • QEkN Weeee N

it:

2NN MEN 6EN N

e o e e J NM 4EN4 MIN 2 WNNO MENw ZENW W M NJ ON

! b25s:"

E4E4N4 E WND 4 e e e ed E de#

4 5 NW J 4kNO 4 JMN2 4CN I UNM e o e e4 E N3 W N W EN4 J

'M WWW Q

> WN4 O M 40 'MNO H W CO k N E W E 4 >NW O 3 Z O M M MN4 2 H U T A >

4 ONI M M 2 O 4 4 O UNH E M. WE D ME N 4 k E OM W >

Q 4NW W 3 e 30 4 2 ENW Z E O F M2 E M 4#4 M W 2 H 4 2 MM A.

2 JEU J M O E WMOM M O- 4NM H e W 4 m EJJM M NO J e 4 4 4 0044 O M 'N2 O M M E J' WOMJ Q W ,RM e 2 J M A WWWe 6 E- WM E WNW O WNM U (NE W QEM Q 2 e 4 e-NW N Oe CENY OWN2 2 USN4-

  • N NJ

.3 M Ne

> N M NJ

$ Nk

-ON MEN

> N w

  • MUNW E MWNW E UtNO 4 4 4 4 4 4 44 4 W

eeB 4MR2 SS e e O O $O O$ O S O 00 S O

9 9 e 3 4 _ _-

. ERR 1 U.N.C. DECOMMISSIONING DATA SYSTEM - SHIPMENT REPORT C1124 e . . TRIP . . . . .T. . 00T .(-- WASTE - )

e SHIP . SHIP . LENS .MR/HR .MR/HR .MR/HR . RADIONUCLIDE . ACTIVITY. WASTE .Y. PHYS . CHEMICAL . SHIP .CUSIC . .

e DATE . MUM . MILES.CONTCT.6 FEET. CAB ..NAME . AMOUNT . SPEC NO .DESCRPTION.P. FORM . FORM . CLASS. FEET .POUNOS .

j e.......................................................................................................................

. NOTE: ALL BLANK ENTRIES INDICATE DATA THAT WAS NOT AVAILABLECDNA) 710831 A/C MATRL 9000 -50000 740930 A/C MATRL 3000 70000 741034. A/C MATRL 1000 3000d-711130 A/C MATRL 3000 180009-744234 A/C MATRL 1000 40000 720131 A/C MATRL 9000 50000 720430 A/C MATRL 2500 80000 720630 A/C MATRL 1000 20000 720731 A/C MATRL 500 30000 720831 A/C MATRL 1500 190000 720930 A/C MATRL 500 20000 721031 A/C MATRL 500 70000 721234 A/C MATRL 4500 80000 730434 A/C MATRL 2000 140000 730228 A/C MATRL 500 30000 730331 A/C MATRL 2000 60000 730430 A/C MATRL 1500 60000 730539 A/C MATRL 4000 110000 730630 A/C MATRL 3000 70000 730734 A/C MATRL 2500 350000 A/C MATRL 500 10000 73054 1000 '20000 7

m 730930 734034 A/C MATRL A/C MATRL 2000 40000 N 731130 A/C MATRL 2000 120000 734234 A/C MATRL 1500 20000 740431 A/C MATRL 1000 100000 740430 A/C MATRL 2500 400000 740531 A/C MATRL 2500 160000 740734 A/C MATRL 3000 80000 730731 .A/C CONC. 540 730834 A/C CONC. 810 731034 A/C CONC. 6750 734130 A/C CONC. 4860 739231 A/C CONC. 4050 740131 A/C CONC. 4590 740228 A/C CONC. 5940 i

740334 A/C CONC. 40260 740430 A/C CONC. 6750

. NOTE--ALL WASTE PRESENTED BELOW WAS NONCONTAMINATED e710831 CONCRETE 300 e71103i CONCRETE 4000-e719131 CONCRETE 300 e720431 CONCRETE 300 e740534 CONCRETE 400 '

e74063i CONCRETE 62000 e740731 CONCRETE 16200 e740930 SCRAPMETAL 4000 e71103i SCRAPMETAL 300000 t

e741130 SCRAPMETAL 20000 e730630 SCRAPMETAL 20000

. ERR 1 U.N.C. DECOMMISSIONING DATA SYSTEM - SHIPMENT REPORT C1124 e . . TRIP . . . . .T. . DOT . <- WASTE ---)

e SHIP . SHIP . LENT .MR/M .P.R/HR .MR/HR . RAOIONOCLIDE . ACTIVITY. WASTE .Y. PHYS . CHEMICAL . SHIP . CUBIC . .

e DATE .NUM . MILES.CONTCT.6 FEET. CA8 . NAME . AMOUNT . SPEC NO .DESCRPTION.P. FORM . FORM . CLASS. FEET . POUNDS .

a======.=====.=====.======.======.======.======.=======.========.==========.=.e=====.==========.=====....===....====...

e740630 SCRAPMETAL 520000 e740739 SCRAPMETAL 298000 b

9 N

00

,e . _ . . - - , . . . .-- -- - -

U.N.C. DECORRISS10NING DATA STSTEM - DISPOSAL COSTS 04426 .

.ERRt TRANSPORTATION CHARGES S -).4 CONTAIER CHARGES s e . .i SURIAL CHARGES S 3.4 . NO . CONT . CONT j

e SHIP . SHIP .0!$P . . . SHIPPING . . .

BA

.., ...... ....S..IC.PE.RMIT.0THER C.O.NTAINER TTPE.C.O.NT.C.OST.. ..e. RENT se DATE..NU.M

.. . . . 8.AS.IC...C.URIE...S.P/HND.0.THER

..S..ITE .. .. . .==... . ... . .T.OTAL . CO.MP Asti .. .T.OTAL..... ........ ... . . .

. NOTES AVAILABLE DOCUMENTS 00 NOT PERRIT COORDINATION OF INDIVIOUAL GHIPRENTS

. AND CHARGES. THE TOTAL NURSER OF SHIPMENTS IS UNNNOUN. ALL BLANK

. ENTRIES INDICATE THAT THE DATA UAS NOT AWAILASLE(DNA3 790930 SidFF SSS 740930 SHEFF Set 744034 SHEFF (134 749034 SHEFF 1291 744034 SHEFF 995 791234 SHEFF t4Si 744234 SHEFF 763 791234 SHEFF 452 744234 SHEFF 900 744234 SHEFF 479 744234 SHEFF 4099 720134 SHEFF 1395 720430 SHEFF 4904 720739 SHEFF 930 720034 SHEFF - 870 720S34 SHEFF 4000 720930 RICH 3047 720930 SHEFF 400 l 720930 SHEFF 2400 j 720930 SHEFF 2400 i t

720930 SHEFF 825 i t

729130 SHEFF 15S f A 724130 SHEFF 4550 .

8 724430 SHEFF 4750 l N 730439 SHEFF 9057 730434 SHEFF 1090

/

730434 SHEFF 493 l 897 1 730229 SHEFF 730229 SHEFF 3t2 i l S33 l

730228 - SHEFF (

730339 SHEFF 007 l l

! 730339 SHEFF 200 O 730434 SHEFF 976 l

730434 RICH 1089 i 730534 SHEFF 934 730534 SHEFF 1039

(

' 730630 SHEFF 970 730.30 SHEFF 964 730630 SHEFF 4494 730734 SHEFF 384 730831 SHEFF 920 730834 SHEFF S09 730834 SHEFF 480-730834 SHEFF 739 730839 SHEFF 334 730834 SHEFF 233 730839 SHEFF 4344 i

. - m __ . .. <

.ERRt U.N.C. hEConRISSIONING DATA STSTER - DISPOSAL COSTS 04'426 e . .( .

gURIAL CHARGES S ).4 TRANFPORTATION CHAR 8E5 6 -).4 CONTAINER CHAR 8ES 8 )

e SHIP . SHIP . DISP . . . St*1PPING . . . . . . NO . CONT . CONT .

e DATE .NUR .S . BASIC CONTAINER TTPE . CONT CO8T . RENT .

. BASIC . CURIE .SP/HNO.0THER e======.e====...ITE . TOTAL

====. ===== e===== ..PERRIT.0THER

. ConPANT===.

==========. 3ew===. . TOTAL ..........e====..==.====================...

.=====. ..=.

730839 SHEFF 933 730839 SHEFF 952 730930 SHEFF 480

'734031 SHE8F 1006 731130 SHEFF 860

, 734430 SHEFF. 2448 731130 SHEFF 4306 731430 SHEFF 1673 739930 SHEFF 1563 734430 SHEFF 4682 731130 SHEFF 925 t 734430 SHEFF 854 739239 SHEFF ete 731234 SHEFF 9939 731234 SHEFF 4539 731239 SHEFF 9416 731231 SMEFF 1888 731239 SHEFF t4te 731239 SHEFF 2136 739231 SHEFF 2248 739239 SHEFF 9942 790930 NUC ENG $50 790930 NUC ENG 550 749030 NUC ENG 550 794030 NUC ENG 550 794030 NUC ENG 550 Jh 744039 31G LANE 43 3 799930 SIG LAKE 245 W 791239 . NUC ENG $50 C3 799239 NUC ENG 4400 791231 NUC ENG 550 744231 MUC ENG 550 79123% NUC ENG 550 744239- BIG LANE 98 720939 NUC ENG 1900 720228 OIG LAME 18 720430 NUC ENG t400 720739 NUC ENG 550 720834 BURL NORTH 5749 720034 TRI STATE 942 720839 TRI STd?E 942 72083t TRI STATE 9299 720031 TRI STATE 942 720834 TRI STATE P42 720839 TRI STATE -490 720031 NUC ENG 550 720930 TRI STATE 4878 720930 TRI STATE 1429 720930 NUC ENG 550 721031 TRI STATE 1299 721034 TRI STATE 1933

, _ . ._ - . _ _ . m . _m . - - - - - - - -

.ERRt U.N.C. DECOMMISSIONING DATA SYSTEM - DISPOSAL COSTS .

'Dt126 e . 4 suRIAL CHARGES S 3.( TRANSPORTATION CMARGES S -3.4 >

' CONTAINER CMARSES e e SHIP .5 HIP . DISP . . .5 HIPPING . . . . . . NO . CONT . CONT .

e . CONT .

..DATE..NUM.... ..

.......S.I.TE..SAS.IC..

. .... . ..... CURIE.. .5.P/HND.0.TV..R

...... ........ . TOTAL.,.C.OMPANY

. .. BASIC.PERMI.T.0..THER

..... ............. . ........ . TOTAL..

....C.ONTAINER TYPE. ........

.........C05T..RE.NT.. . .. ....

729031 NUC ENG 60 724430 NUC ENG 550 729930 TRI STATE 849 721930 TRI STATE 1927 721239 TRI STATE 9878 730434 NUC ENG 550 730431 . NUC ENG 550 730t31 SURL NORTH 2407 730228 NUC ENG 550 730228 NUC ENG 550 730228 TRI STATE 988 730228 TRI STATE 1249 730228 TRI STATE 1249 730228 TRI STATE 643 730228 TRI STATE 849 730228 .TRI STATE -942 730339 TRI STATE 9299 -

730331 NUC ENG 550 730430 TRI STATE 992 730430 TRI STATE 1299 730430 TRI STATE 1413 730430 NUC ENG $50 730531 TRI STATE 9179 730531 NUC ENG 550 730531 NUC ENG 550 Jb- 730630 TRI STATE 1299 g 730630 TRI STATE 1299' og 730630 NUC ENG 550

--a 730630 NUC ENG 550.

730734 NUC ENG 550 730834 EL MORPHT 824 730831 EL MURPHY 790 730831 EL MURPHY Si4 730839 NUC ENG 550 730831 NUC ENG 550 -

730831 - NUC ENG 550 730839 NUC ENG . 550 730831 NUC ENG 550 730831 TRI STATE 1299 730839 TRI STATE 1299 730930 NUC CMG 550 739031 NUC ENG 550 l

139930 EL MURPHY 440 734430 EL MURPHY 454 739930 EL MURPHY 454 734130 ' EL MURPHY . 449 739130 EL' MURPHY - 890 731130 TRI STATE 645 739130 TRI STATE 645 731130 TRI STATE ~ 400

, 734930 MC FNG 4300 l

l

.ERRt U.N.C. DECORRISSIONING DATA SYSTEM - DISPOSAL COSTS 04426

. . .t gueIAL CHARGCS

  • 3.4 TRANSPORTATION CHARGES 6 -).( CONTAINER CNAR328 e - -)

e SHIP . SHIP . DISP . . . SHIPPING . . . . . NO . CONT .COsti .

e DATE .NUR .S CONTAINER TYPE .R* NT .

a======. ===. I.TE.. 8ASIC====..=====.

...====. .C.URIE .SP/HNO.O.THER . TOTAL

.. ......COMf*ANY..

BASIC PERMIT.0THER

.======. . =====.

. . TOTAL........... .... CONT . .C.OST . == .

731430 sEIC ENG t300 ' '

731130 NUC ENG 1300 , sg 4

739130 : , s i NUC ENG 2200 739430 NIX ENG 2200 -

734130 NUC ENG 3300 731930 s i, NUC ENG 2200 731930 - NUC ENG 9300 739234 EL Hud HT 479 739234 NUC ENG t300

~-

  • 739239 NUC ENG 2600 739239 e NUC ENG 2600 739239 NUC ENG 1950 73t234 NUC ENG 2600

e 73 92.a t NUC ENG 1950 .

,'- 739239 NUC ENG 2600 -

    • ' + '

%- 739234 NUC ENG 1950 -

+ ' l*"

731234 NUC ENG s 2600-739234 NUC ENG 2600 790933

\

SS GALLON ORURS' 4276 790930 SARREL 239 1733 74903t SS GALLON ORURS 240 9740 ,

714039 PLYp000 SOXES 5890 719034 PACNING CRATE e 419 744239 PLYWOOD SOMES 990 0 720134 R-3 sIfS 30 4826 720228 2  % CALLON DRURS 204 ; '* W 4 ~

'A s 720534 ,

(INERS 3452

" I 720731 LINERS leS*f

  • O' 720930 LINERS- 24783 . ~J 720*Jo n BC-48-22t'

.. $300 NA 72093J l LL-50-50-400. [ J MOO 4 *..- -

720930 STEEL LINERS S 'L 17900 1360%' ,  ! ../

729039 LL-50-100 s 729024 ,~..- LINER e LIO 4955 -

b-LL-50-900 -t

$**$ - 2600 ^

  • 724430 -

72 *Mt 13C028 s.- k ' # 'A .+

LINERS LL-50-4M .. 2400 ' ,. <

'9664 -

733738 730238

? y

".* ~ -

I;

, O LINERS;-

90TTOM VES.HD.CCMT 4 4788

  • q. = ~~ '- SS GALLON ORURS 253 4950

';g-730269 730334 * '

-e-.

6

. . , . - CASN. 1430

~

730430' ~d* ~  %. \

8.INERS 3065 730630-% y -w .OISPOSAL B M 900 3026S-730630 -

'j CONCRETE L N RS 'e 9300

  • . %~

_3..,

! 4' 73073t L*.-50-400 0 t00 730934 g SPFCIAL PLYWOOO 90X 12 4937 739034 M *d BINS 30300 4 734130 M-3 BINS (3950 734t30 SHIPPING CRATES 40 3774 134234 M-3 BINS SG 44750 .

739234 ,

SHIPPING CRATES 30 2831 Er

-z ,

s

    • p 5 ,

'A. s

%. '4 *

?. &^

. ss # ..y ,

e"

.q , .

gu' + . % . .g,

~1 , 4 . tw .

w .4 ArL m 'n

__ s_...__-- - _ - -

1. RE PORT NuMeE R (Au,p.ea'tir DOCA

,T;cscaua3s

, u s NuctE AR REcutATOnv cOumisslON BIBLIOGRAPHIC DATA SHEET NUREG/CR-2985 4 veu t ANu w alistE <4 ,,v.6, u .sv.,,, i.., 2 ne , s" es Evaluation of Nuclear Facility Decomissioning Projects Project Sunenary Report 3 REciPiENr s AccEssicws NO Elk River Reactor 7 AUTHORi$t b DATE REPORT COMPLE TED R. L. Miller, J. A. Adams o o,, , ,, ,,,

October l,1982 9 PE RF ORMING ORGAN 12ATION NAME AND MAILING ADDRESS (tachdr to Coors DATE REPORT t$$uf D ___

uosein lv4am Office of Surplus Facilities Management December 1982 UNC Nuclear Industries , y ,,,, ,,,,,

P.O. Box 490 Richland WA 99352 , y ,,,, ,,,,,

12 SPONSORING ORGAN 12Af TON NAME AND MA8 LING ADORESS (sackdr le Codri p Division of Engineering Technology Office of Nuclear Regulatory Research ,,, co ,,,cg no.

U.S. Nuclear Regulatory Comissjon Washington, D.C. 20555 NRC FIN B7568 83 TYPE OF REPORT Ps Asoo cows no (inebs,ee e,est Technical

15. SUPPLEMENTARY NOTES 14 (Leme areias 11 ABSTN ACT 000 =ords er seest This report suns $arizes information concerning the decomissioning of the Elk River Reactor.

i Decommissioning data from available documents were input into a computerized data-handling

! system in a manner that perui'ts specific information to be readily retrieved. The l information is in a form that assists the Nuclear Regula' tory Comission in its assessment of decomissioning alternatives and ALARA methods for future decomissioning projects.

l Samples of computer reports are included in the report. Decomissioning of other i

reactors, including NRC reference decomissioning studies, will be described in similar reports.

l IF RE Y WOROS AND OOCUMENT AN ALYSIS 17a DESCRIPTOR$

( Decomissioning Reactors Program Plan, l ALARA, Radiation Expostire j Costs, Comparison Studies ,

i t t Ftp IDENilFIE R$/OPEN ENDE D TERMS 19 SE CUReiv CLASS (Ta.s <c,or#J 21 NO OF P AGES 13 AVAiLAstLITY ST ATEMENT t!ne't assifled Unlimited 2: PRICE so pUnclass Cuaity cImera.

fied ,,ri s esmC F ORV 3JS 47 III

i UNITED STATES

,ouar a ciass uait NUCLEAR REGULATO3Y COMMISSION

'o1186,84'a s s raio WASHINGTON. D C. AF/E nasm o c esavir n. Su g OHOAL BUSINISS PtNALTY f OR PRIVATE USE. 9310 a'

F, rr r

C b

o 2

O m

2 C

O r-rn 120555016817 1 ANLO 3 US NRC m ADM OIV CF tjoc >

POLIC) 6 PUBLICATIONS NGr g^- 9 PDR NUREG COPY r LA 212  :

WASHincroh CC 20555 #

C rr l C l

C E

E 5

2*

O T

T h

n C

5 l

le 3

a rr 3

E R

--