Public Version of Temporary Mod Request T-7480 to Emergency Plan Supporting Procedure AD 1827.07 Re Earthquake,Receipt Form & Rev 191 to Index
ML20078L520
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/30/1983
From: Murray T
TOLEDO EDISON CO.
To:
Shared Package
ML20078L508 List:
References
PROC-830930, NUDOCS 8310210363
Download: ML20078L520 (3)


Text

-

THE TOLEDO EDISON COMPANY DAVIS-BESSE IiiICLEAR FO*TR STATICN EMERGENCY PLAN SUPPORTING PROCEDURES REVISION INDEX Pa,ge, Revision Procedures Revision Temporary Modification i 7 HP 1602.01 14 HP 1604.01 5 HP 1604.02 0 AD 1827.01 4 AD 1827.02 10 AD 1827.03 3 AD 1827.04 2 AD 1827.05 2 AD 1827.06 2 T-7248 AD 1827.07 3 T-7480 AD 1827.08 2 AD 1827.09 2 AD 1827.10 13 AD 1827.11 5 AD'1827.12 10 AD 1827.13 6 i

AD 1827.15 5 AD 1827.16 2 -

AD 1827.17 5

~

AD 1850.04 7 AD 1850.05 7 AD 1850.06 2 T-7399 Administrative Memorandums Revision No. 37 ECS Pager and Telephone Numbers 30 l

No. 38 First Aid Team 12 No. 39 Fire Brigade 16 -

No. 41 Emergency Duty Officer (EDO) 28 No. 42 Radiation Monitoring Teams (RMT) 19 Revision 191

- September, 1983 .

8310210363 831018 g PDR ADOCK 05000 oo7

  • dis RILUTioN e origind, Responsible Section Head A3 tion File Copy, Mester Flie COPIES To BE MODIFIED POR IMMEDI ATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION UNIT 1 Control Room Shift Supervisor TEMPORARY MODIFICATION REQUEST Control Room Files (as required)

ED seas SECTION 1 PROCEDURE TITLE AND NUMBER Earthquake, AD 1827.07 REASON FOR CHANGE The seismic qualification of the temperature switches for the service water venti-lation fans has not yet been received. Therefore, if an earthquake occurs, the ventilation fans must be locally verified to be operating properly. CM./zcc.nvr

/M.T%W PCA., 34FETY CUALUAnchJ 47mCiritD "To MDC 83-20 CHANoE Add to Step 5.2.2 - 1 Periodically verify the service water ventilation is maintaining proper room temperature or place the units in manual and verify the ventilation fans are operating.

IS PROCEDURE REVISION REQUIRED No if ng mis modificulon is valid unW Seismic qualification a f .

received per SDR 2118 PREPAREDSY DATE APPROVED BY / /' DATE APPROVED BY DATE / /

% [Os L SU5MITTED BY (Section Head) DATE 9-y ~23

$1 W

^

>A 0 V

RECOMMENDED BY (SRtfChoirmen) V mm MCA APPROVED BY (Men f Qu ty A

/ence DATE DATE 312,)[sa

- AY

  1. ~ DATE APPROVED SY (Stetton S intendent)

%% 7D[d 0

DAVIS-BESSE REVISION COVER SHEET September 30., 1983 DATE TO: M nab FROM: EMER CY PLANNING & PREPAREDNESS SUPV.

SUBJECT:

Davis-Besse EMERGENCY PLAN SUPPORTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Basse EMERGENCY PLAN SUPPORTING PROCEDURES Manual. Control Copy = 3 M .

Instructions for the material are as follows:

REMOVE AND RETURN INSERT Revision Index, Revision 190 Revision Index, Revision 191 T-7480 in front of AD 1827.07 i

i I