ML20108A656
From kanterella
ML20108A656 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 04/25/1996 |
From: | BOSTON EDISON CO. |
To: | |
Shared Package | |
ML20108A648 | List: |
References | |
NUDOCS 9605020349 | |
Download: ML20108A656 (29) | |
Similar Documents at Pilgrim | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999
[Table view]Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20196D0241999-06-16016 June 1999
[Table view]Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20108A656&oldid=2814076"