ML20112H818

From kanterella
Revision as of 16:37, 17 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1984
ML20112H818
Person / Time
Site: Farley 
Issue date: 12/31/1984
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8501180055
Download: ML20112H818 (5)


Text

-

~

s I . DOCXIT NO.' ' 50-148 UNIT I

DATE l-7--85 -

COMPLETED BY L D. Woodard TF' ** HONE (205) 899-5156

+

St0NTig December. 1984 /

DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) (AlWe-Net) g 818 g7 gig 816 gg 820 2

3 816~~~~- --------..---_g9_. 817

~

4' 823 ;g 816 821 21 816 3

6 821 22 815 7

823 23 823 g 823 ;4 819 819 -

,j. 818' 9

817 685 10 3 777 820 ll 1g 27

.I 604

j 12 3 gi g 13 29 816 ll1 605 815

't 14 30 15 678 31 16 817 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to

, the ne:re:t whole me;: watt.

e 8501180055 841231

\

(DRADOCK 05000348 PDR

l

?

{

lil-

_ m

OPERATING DATA REPORT DOCKET NO. Sn un l- / ~D DATE COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes

1. Unit Name:

December, 1984 1) Cumulative data since

2. Reporting Period: 12-1-77, date of commercial
3. Licensed Thermal Power (MWt): 2652 860 Peration.
4. Nameplate Rating (Gross MWs):

829

5. Design Electrical Rating (Net MWe): ,
6. Maximum Dependable Capacity (Gross MWe): RAI R
7. Maximum Dependable Capacity (Net MWe): 797 1
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,1f Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: M/A d

O This Month Yr.-to Date Cur'nulative

, 11. Hours In Reporting Period 744 8,784 62,112

12. Number Of Hours Reactor Was Critical 744.0 7,005.8 42,129.0 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours l 14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 Ata 9An 5,751,304 33,094,314  !
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 585 848 5 427 984 '41 179 046
19. Unit Service Factor 100.0 78.8 66.0
20. Unit Availability Factor 100.0 78.8 66.0
21. Unit Capacity Factor (Using MDC Net) on a 77.5 62.9
22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
23. Unit Forced Outage Rate 0.0 1.I 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. .and Duration of Each):

Refueling / maintenance outage, 4/">/85, approximately 5 weeks.

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved 08-06-77 08-09-77

( INITIAL CRITICALITY INITIAL ELECTRICITY 08-20-77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 W/77)

~=_n...

~

i

~

-- -- .... a - -

L..- '

~ ,-: . --

l l.

l 3 -

I)OCKETNO. 50-148 -

UNIT SilulDOWNS AND POWER RElHX'TIONS l

UNIT NAME J.M. Farley - Unit 1 l DATE l-7-85 NEPORTMONTig December COMPLETED sY J. D. Woodard TELEPalONE (205) 899-5156 i

,,g _

s: re o se E

~

.23 8 gE'g Licensec Ev, h*l, Cause & Cuneceive No. 1)ete k gg g .c gx Event

(? Actiini tu E

o3 M ji5g Repost # ,

MU ] PICvent l(ccussence 6

005 841211 F 0 A 4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.

l' l 2 3 4 F: Fusced Reason: Method:

S: Stheduled Exhibit G - Instsuctions A-Equipment Failuse(Explain) 1 -Manual 4 for Prepasatiem ofI).ata n Maintenance of Test 2 Manual Scram. Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram. Event RepiwI(l.Elt) File tNUREG.

D-Regulaisuy Restsiction . 4 04hes (Explain) 0161)

E-Opesaios Tsaining & license Examination F- Administ salive 5 G Ope ational Enus (Explain)

ExInbit 1 Same Sousee

('#/17) 11 Othes (Emplain) 1 4

h t

l.* ' Malling Address  ;

  • Allbams Power Company 600 North 18th Street

> Post Office Box 2641

' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very rul x '

/ ..

R. P. Mcdonald l RPM /KWM: sam

( Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) 1 l

l l

l g

o, t

L

i

' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84. Power was reduced following failure of

a bearing on the 1A condensate pump motor.

4 The following major safety-related maintenance was performed in the month of December:

1. Performed miscellaneous corrective and preventive maintenance on diesel generators. >

1

'l i

4

- , . - . - ., , , , .