I DOCXIT NO.' ' 50-148 s
I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156
+
St0NTig December. 1984
/
DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)
(AlWe-Net) 818 g
g7 gig 816 820 2
gg 816~~~~-
3
..---_g9_.
817 816
~
4' 823
- g 821 3
21 816 815 6
821 22 823 7
23 823 819 g
823
- 4 819 9
,j.
818' 685 10 817 3
ll 777 1g 27 820
.I;j 12 604 3
gi g ll1 816 13 29 605 815
't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to
, the ne:re:t whole me;: watt.
8501180055 841231 e
(DRADOCK 05000348
\\
- l
?:{
lil-m
OPERATING DATA REPORT DOCKET NO.
Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes
- 1. Unit Name:
Joseph M.
Farley - Unit 1
- 2. Reporting Period:
December, 1984
- 1) Cumulative data since 12-1-77, date of commercial
- 3. Licensed Thermal Power (MWt):
2652 Peration.
860
- 4. Nameplate Rating (Gross MWs):
829
- 5. Design Electrical Rating (Net MWe):
RAI R
- 6. Maximum Dependable Capacity (Gross MWe):
797 1
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
M/A d
O This Month Yr.-to Date Cur'nulative
- 11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours l
- 14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314
- 17. Gross Electrical Energy Generated (MWH)
Ata 9An
- 18. Net Electrical Energy Generated (MWH) 585 848 5 427 984
'41 179 046
- 19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0
- 20. Unit Availability Factor 77.5 62.9
- 21. Unit Capacity Factor (Using MDC Net) on a
- 22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
- 23. Unit Forced Outage Rate 0.0 1.I 13.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each):
Refueling / maintenance outage, 4/">/85, approximately 5 weeks.
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
(
INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77)
a -
L..-
~
~=_n...
~
i
~
l l.
3 l
UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO.
50-148 l
UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l
COMPLETED sY J.
D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i
,,g o se E
.23 8
gE'g Licensec Ev, h*l, Cause & Cuneceive s:
re
~
No.
1)ete k
gg g
.c g x Event
(?
]
Actiini tu E
o3 M
ji5g Repost #
PICvent l(ccussence MU 6
005 841211 F
0 A
4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.
l' l
2 3
4 F: Fusced Reason:
Method:
Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4
n Maintenance of Test 2 Manual Scram.
Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram.
Event RepiwI(l.Elt) File tNUREG.
D-Regulaisuy Restsiction.
4 04hes (Explain) 0161)
E-Opesaios Tsaining & license Examination F-Administ salive 5
G Ope ational Enus (Explain)
ExInbit 1 Same Sousee
('#/17) 11 Othes (Emplain) 1 4
h t
l.* '
Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641
' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very rul x
/
R. P. Mcdonald l
RPM /KWM: sam
(
Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) 1 l
l l
l g
o, L
t
i
' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.
Power was reduced following failure of a bearing on the 1A condensate pump motor.
The following major safety-related maintenance was performed in the 4
month of December:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
1
'l i
4
,,,.