ML20112H818

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1984
ML20112H818
Person / Time
Site: Farley 
Issue date: 12/31/1984
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8501180055
Download: ML20112H818 (5)


Text

-

~

I DOCXIT NO.' ' 50-148 s

I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156

+

St0NTig December. 1984

/

DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)

(AlWe-Net) 818 g

g7 gig 816 820 2

gg 816~~~~-

3


..---_g9_.

817 816

~

4' 823

g 821 3

21 816 815 6

821 22 823 7

23 823 819 g

823

4 819 9

,j.

818' 685 10 817 3

ll 777 1g 27 820

.I;j 12 604 3

gi g ll1 816 13 29 605 815

't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to

, the ne:re:t whole me;: watt.

8501180055 841231 e

(DRADOCK 05000348

\\

PDR

l

?:{

lil-m

OPERATING DATA REPORT DOCKET NO.

Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph M.

Farley - Unit 1

2. Reporting Period:

December, 1984

1) Cumulative data since 12-1-77, date of commercial
3. Licensed Thermal Power (MWt):

2652 Peration.

860

4. Nameplate Rating (Gross MWs):

829

5. Design Electrical Rating (Net MWe):

RAI R

6. Maximum Dependable Capacity (Gross MWe):

797 1

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions. If Any:

M/A d

O This Month Yr.-to Date Cur'nulative

11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours l
14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314
17. Gross Electrical Energy Generated (MWH)

Ata 9An

18. Net Electrical Energy Generated (MWH) 585 848 5 427 984

'41 179 046

19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0
20. Unit Availability Factor 77.5 62.9
21. Unit Capacity Factor (Using MDC Net) on a
22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
23. Unit Forced Outage Rate 0.0 1.I 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each):

Refueling / maintenance outage, 4/">/85, approximately 5 weeks.

25. If Shur Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

(

INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77)

a -

L..-

~

~=_n...

~

i

~

l l.

3 l

UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO.

50-148 l

UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l

COMPLETED sY J.

D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i

,,g o se E

.23 8

gE'g Licensec Ev, h*l, Cause & Cuneceive s:

re

~

No.

1)ete k

gg g

.c g x Event

(?

]

Actiini tu E

o3 M

ji5g Repost #

PICvent l(ccussence MU 6

005 841211 F

0 A

4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.

l' l

2 3

4 F: Fusced Reason:

Method:

Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4

n Maintenance of Test 2 Manual Scram.

Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram.

Event RepiwI(l.Elt) File tNUREG.

D-Regulaisuy Restsiction.

4 04hes (Explain) 0161)

E-Opesaios Tsaining & license Examination F-Administ salive 5

G Ope ational Enus (Explain)

ExInbit 1 Same Sousee

('#/17) 11 Othes (Emplain) 1 4

h t

l.* '

Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641

' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very rul x

/

R. P. Mcdonald l

RPM /KWM: sam

(

Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) 1 l

l l

l g

o, L

t

i

' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.

Power was reduced following failure of a bearing on the 1A condensate pump motor.

The following major safety-related maintenance was performed in the 4

month of December:

1.

Performed miscellaneous corrective and preventive maintenance on diesel generators.

1

'l i

4

,,,.