ML20112H867

From kanterella
Revision as of 16:36, 17 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips, Including Rev 33 to EPIP from Index & EPIP-4.2b, OSC Team Status. Central Files Version of Revised EPIPs Withheld
ML20112H867
Person / Time
Site: Point Beach  
Issue date: 06/04/1996
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19344C981 List:
References
PBL-96-0122, PBL-96-122, NUDOCS 9606180595
Download: ML20112H867 (1)


Text

'

Wisconsin e Electnc -

POWER COMPANY Point Booch Nuclear Plant (414 N 2321 6610 Nuclear Rd., Two Rivers, WI 54241 i

PBL 96-0122 June 4,1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACli NUCLEAR PLANT. UNITS 1 & 2 Enclosed are copics of resised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copics of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE " A copy of the afIccted procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerel' G. J. Maxfield Manager kmt Enclosure

- cc: NRC Resident inspector (w/o/c) W (

l g \

incident Response Center, Region 111 {V ,

9606180595 960604

-PDR

'F ADOCK 05000266 / O PDR ,t..  :

( g l f/f[A

. I hf i

AsuMfan ofHinwbrEwgOnwativi