ML20112H867
| ML20112H867 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/04/1996 |
| From: | Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19344C981 | List: |
| References | |
| PBL-96-0122, PBL-96-122, NUDOCS 9606180595 | |
| Download: ML20112H867 (1) | |
Text
'
Wisconsin Electnc e
POWER COMPANY (414 N 2321 Point Booch Nuclear Plant 6610 Nuclear Rd., Two Rivers, WI 54241 i
PBL 96-0122 June 4,1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:
DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACli NUCLEAR PLANT. UNITS 1 & 2 Enclosed are copics of resised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copics of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE " A copy of the afIccted procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.
Sincerel' G. J. Maxfield Manager kmt Enclosure
(
\\
- cc:
NRC Resident inspector (w/o/c)
W
{Vg l
incident Response Center, Region 111 9606180595 960604 O
-PDR ADOCK 05000266
/( g l f/f[A
'F PDR
,t..
. I hf i
AsuMfan ofHinwbrEwgOnwativi