ML20085L676

From kanterella
Revision as of 14:17, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Operations Rept for Manhattan College Zero Power Reactor,Sept 1990-Aug-1991
ML20085L676
Person / Time
Site: 05000199
Issue date: 08/31/1991
From: Duggan W
MANHATTAN COLLEGE, RIVERDALE, NY
To: Austin M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9111050013
Download: ML20085L676 (3)


Text

_ _ . _ _ - _ . _ . . _ _ . _ _ . . _ _ _ _ . _ _ _ _ _ . _ _ - . _ . _ _ . . _ _ _ _ _ _ . . _

. * . D UC1<t7 : 50-19tf '

e . .. . 1

. Nildkillml Odlt  !

O Ij'}l%T[ Il% 'W l 11 H11,1 ( Ullltif) ( )l (*\t ( llt 1 h (', 1 lLl41410 ( d l111 lllllT  !

October 15,1991 Mr. Michael Austin U.S. Nuclear Regulatory Conunission Region 1 475 Allendale Road Kini;of Prussia, PA 19406-1415

Dear Mr. Austin:

linclosed is the Annual Reactor Operations Report for the Manhattan College Zero Power Reactor (License R-94) as required by our Technical Specifications, Yours truly.

I

!(f  ?' ~

g@v.

Williain P. Duggan, Ph.D.

Chief Reactor Supervisor cc: Director, Office of NRR t

k '

9111n50013 010931 / ,

PDR ADOC h' 05000199 i I

g PDR /[h.I o . .. [ e t , , i . .',,nNitt a n College e im ettlaie

  • New Yot k
  • lo t'l l

., . -a.-.-...._.._.__._....,.._......a_,, , , . _ _ . , . _ . . _ _ . _ _ . . . , _ , . . . . . . . . . _ _ , . . _ . _ . - - - , , , . . , . - . _ . _ _ , . . - . . - - - _ . _ _ .

r

. I

e. , ,

MANilATTAN COLLEGE ZERO POWER ltEACTOR I

ANNUAL REACTOR OPERATIONS REPORT FACILITY: Manhattan Co!!ege Zero Power Reactor (MCZPR)

OPERATOR: Manhattan College l LICENSE: R 94 Docket: 50 199 l

PERIOD: September 1,1990 August 31,1991 l i

l

SUMMARY

Manhattan College has not operated the reactor since September,1989 due to mainte-nance operations and delay in arrival of the Low Enriched Uranium (LEU) fuel to  ;

replace the liigh Enriched Uranium (lieu) core. The LEU fuel was received on campus -

on January 29,1991, and the spent llEU fuel waa shipped to Oak Ridge on April 3, -

1991. Core reloading has not been accomplished due to an instrumentation failure.

Funding has been received from the Department of Energy to upgrade reactor instru-mentation.

1. REACTOR OPERATIONS The MCZPR has not been operated since September,1989 since the fuel was removed to allow maintenance of the reactor tank Refueling with the LEU core has not been >

accomplished due to a failure of the reactor start;up channel, investigation of the con-sole failum is continuing.

I

2. UNSCllEDULED SilUTDOWNS The prolonged maintenance - mfueling shutdown continues.
3. MAINTENAliCE OPERATIONS I i Corrosion of the aluminum reactor tank was the primary cause of the initial defueling, it was detemtined that the cathodic protection system had failed and led to the corrosion. ,

The system was repaired. Tbc reactor tank was examined and consultations with consul- l tant metallurgists led to the decision to coat the outside of the tank with epoxy in onter to restore tank strength. Tank integrity was never lost.

Investigation of the failed start-up channelis continuing. DOE has awarded Manhattan College $35,000 for upgrading the mactor instrumentation.

4. FACILITY CIIANGES The only major change to the MCZPR is the conversion to low enriched uranium fuel.

This was addressed in a Safety Analysis Report, and therefore, there are no unreviewed safety questions.

I l

t y ~ v.v,~.y m .~ ,,-,,,_. -, .,,m wm m-,--,-,,-,r ,~,...m...m-- .m,.. ..m,--,,. . . -m.,,,.,,-m,., ,,.,, , . . - - - - - , - . .w,*

.e ,

g . 1

.s .'

5. RADIATION SURVliY ,

llcalth physics surveys are eartied out setni annually by the facility's liculth Physicist.

This includes surveying with instruments, wige tests, and checking the sealed sources. 7 No containination has been detected, and the integrity of the scaled sources was serified, j

6. Pl!RSONNIIL RADIATlON EX10SURl!S

~

Radiation exposures are monitored with film badges which are analyzed inonthly by -

Landauer. All exposures were below investigational 1.crel I (125 micin per quaner),

7. FACILITY STAFFING William P. Duggan, Ph.D. Joined Manhattan College in August,1990 lie passed the NRC exam for Senior Reactor Operator in September,1991, and has been appointed Chief Reactor Supervisor. i John Digmun was lleensed by the NRC as a Reactor Operator for the MCZPR in Febru-ary,1991. i No other staffing changes have occurred, i The current staff for the MCZPR is:

D metor Admiristrator Robert !!, !!ctlin. Dr.Pil Chief Reactor Supervisor Wil!iam P. Duggan, Ph.D.

Reactor Operator John Dignam  ;

llealth Physicist Stanley Malsky, Ph.D.

lY4tw Np ate William P. Duggan,th.D.

. Chief Reactor Supervisor ,

l

z. . . - . - . - - - - - - - - . . . ~ ._-.-.. - .- . - - -.-, _ .- - ..-.,..,.....ua.....,-_,_.-,.