, Sourturn Nuci;zr Operatin0 Company
. _ ,
- Post Offico Box 1295
Birmingham, Alabama 35201 Telephone (205) 868 5131
- o. . uor.y Southern Nudear Operating Company March 11, 1996 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk I Washington, D.C. 205$5 2 1
$ Joseph M. Farley Nuclear Plant
., Monthly Operating Renort
, Gentlemen: l l
Attached are the February 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
i i If you have any questions, please advise.
Respectfully submitted,
$V 2/W)/
Dave Morey !
RWC:(mor)
Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 180091
\ \
9603200160 960229 PDR ADOCK 0500034G R PDR
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations February 1996 At 1201 on February 9,1996, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 15% reactor power to perform chemistry flush of Steam Generators.
Flushing was completed and the unit was returned to 100% reactor power at :
2029 on February 11,1996.
There was no major safety related maintenance performed during the month. I I
J 1
m
OPERATING DATA REPORT DOCKET NO. 50-348 DATE March 8,1996 COMPLETED BY M. W. McAnulty
'TELEPilONL (334) 899-5156, ext.3640 OPERATINGETAIUS
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period: February 1996 1) Cumulative data sincel2-01-77,
- 3. Licensed Thermal Power (MWt): 2,652_ date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe) 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
- 11. Hours in Reporting Period 696.0 1,440.0 159,960.0
- 12. Number Of Hours Reactor Was Critical 696.0 1,440.0 128,129.4
- 13. Reactor Reserve Shutdown Hours 00 0.0 3,650.0
- 14. Hours Generator On-line 696.0 1,440.0 126,115.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
- 16. Gross Thermal Energy Generated (MWH) 1,745,785.1 3,718,891.7 324,473,264.6 :
- 17. Gross Electrical Energy Generated (MWH) 574,826.0 1,229,139.0 104,721,293.0 j
- 18. Net Electrical Energy Generated (MWH) 545,504.0 1,168,197.0 98,907,849.0
- 19. Unit Service Factor 100.0 100.0 78.8 )
- 20. Unit Availabilty Factor 100.0 100.0 78.8 j
- 21. Unit Capacity Factor (Using MDC Net) 96.5 99.9 76.1 l
- 22. Unit Capacity Factor (Using DER Net) 94.5 97.9 74.6 j
- 23. Unit Forced Outage Rate 0.0 0.0 5.9 j
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): j N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Com.mercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77
I j .
DOCKET FO. 50-348 UNIT 1 DATE March 8,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext ?64 MONTil February l
. DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1 838 17 837
.2 834 18 837 i
.3 838 19 834 4 838 20 833 5 840 21 832 6 840 22 830 7 839 23 828 8 837 24 830 9 609 25 832 10 50 26 828 11 380 27 829 12 834 28 828 13 836 29 836 14 834 30 N/A 15 831 31 N/A 16 837 l
l INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE March 8,1996 COMPLETED BY M. W. McAnulty REPORT MONT February TELEPIlONE (334) 899-5156, ext.3640 R M E E S.
T A T Y Y S '11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) 4 PREVENT RECURRENCE 1
001 960209 S 0 B 4 N/A AB SG At 1201 on 960209, with the unit operating in mode 1 at 100% reactor power, the unit
{
l waS ramped down to 15% reactor power to l perform chemistry flush of Steam Generators.
j Flushing was completed and the unit was returned to 100% reactor power at 2029 i on 960211. ;
l i
1 1
i
)
1: 2: 3: EVENTS REPORTED !
F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%
B Maintenance or Test 2 - Manual Scram REDUCTION IN C - Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TiiE PRECEDINO 24 F Administrative if0URS.
G Operational Error (Explairi)
II- Other (Explain)
l l I l . .
l l- Joseph M. Farley Nuclear Plant
! Unit 2 Narrative Summary of Operations l-February 1996 There were no unit shutdowns or major power reductions during the month.
l There was no major safety.related maintenance performed during the month. <
Chemistry flush of Steam Generators was completed and the unit was returned ;
to 100% reactor power at 0316 on February 2,1996.
l l
1 l
l i
1
. . . - , m -- ..,4 . -
- l
. . \
~
OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 8,1996 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640 QPERATINGETATUS
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes
- 2. Reporting Period: February 1996 1) Cumulative data since 07-30-81,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe) 863.6
- 7. Maximum Dependable Capacity (Net MWe): 822
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
- 11. Hours in Reporting Period 696.0 1,440.0 127,873.0
- 12. Number Of Hours Reactor Was Critical 696.0 1,440.0 110,343.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-line 696.0 1,440.0 108,650.2
- 15. Unit Reserve Shutdown Hours _
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,809,698.3 3,677,448.9 276,651,239.3
- 17. Gross Electrical Energy Generated (MWH) 600,264.0 1,217,767.0 90,680,246.0
- 18. Net Electrical Energy Generated (MWH) 571,772.0 1,158,833.0 85,972,484.0
- 19. Unit Service Factor 100.0 100.0 85.0
- 20. Unit Availabilty Factor 100.0 100.0 85.0
- 21. Unit Capacity Factor (Using MDC Net) 99.9 97.9 82.0
- 22. Unit Capacity Factor (Using DER Net) 99.1 97.1 81.1
- 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81
DOCKET NO. 50-364 UNIT 2 DATE March 8,1996 M. W. McAnulty COMPLETED BY TELEPHONE (334) 899-5156 ext 364 MONTH February M
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) - ,
- i 1 349 17 843 2 834 18 842 3- 844 19 837 l 4 844 20 836 5 845 21 836 6 845 22 ,35 i
7 843 23 831 8 840 24 834
\
9 835 25 837 10 837 26 833 11 835 27 834 l l
12 843 28 832 !
13 843 29 842 i
14 839 30 N/A i 15 834 31 N/A 16- jt42 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute in the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 l
- '* UNIT NAME J. M. Farley - Unit 2 l DATE March 8,1996 COMPLETED BY M. W. McAnuity REPORT MONT February TELEPHONE (134) 899-5156, ext.3640 .
I i
R. M )
E E S A j T T Y Y S 11 SC 'f l
P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO
- NO. DATE (1) (IIOURS) (2) (3) LER# ME CODE (5) PPEVENT RECURRENCE l There were nO Shutdowns Or power reductions during the month.
l l
1 t
t l
i i
I i
I: 2: 3: EVENTS REPORTED l F: Forced Reason Method INVOLVE A +
S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TilAN 20%
B - Maintenance or Test 2 - Manual Scram - REDUCTION!N l C- Refueling 3 - Automatic Scram AVERAGE DAILY [
D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination Tile PRECEDING 24 i F - Administratis e llOURS.
G OperationalError(Explain) l 11 Other(Explain)