Monthly Operating Rept for Aug 1995 for Waterford 3
ML20092D018
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0145, W3F1-95-145, NUDOCS 9509140004
Download: ML20092D018 (7)


Text

i Entergy Operaations,inc.

s ', y Kswa L A 7mk$

/. Te 504 739 6774 i R. F. Burski Due s N n:n Severy Mhnhnd 3 W3F1-95-0145 A4.05 PR September 12, 1995 L

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk ,

Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of August, 1995. This report is submitted per l Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility ,

Operating License No. NPF-38.

Very truly yours, suudk:

R.F. Burski Director Nuclear Safety 4

RFB/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 9509140004 950831 F i gDR ADOCK 05000382 I

--- . . . - - pog _.__ l

. l NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for August, 1995 l l

The unit operated at an average reactor power level of 99.96% and experienced no shutdowns or significant power reductions during the period, b

e I

h i

  • 195 r.,: i a e

i I

PRESSURIZER SAFETY VALVE l FAILURES AND CHALLENGES WATERFORD 3 for August, 1995 l

There were no pressurizer safety valve failures or challenges experienced during '

the month. ,

1 I

l i

I i

)

Page: 2 of e

I OPERATING DATA REPORT  !

I DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : September 1, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 OPERATING STATUS

1. Reporting Period  : August, 1995 Gross Hours in Reporting Period  : 744 2 Currently Author .ed Power Level (MWt) : 3,390 i

Maximum Dependable Capacity (Net MWe) : 1,075 l Design Electrical Rating (Net MWe) : 1,104

3. Power Level to which Restricted (if any) (Net MWe) : N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number 6 Hours Reactor was Critical 744.0 5,387.9 74,110.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 5,368.0 73,212.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,521,249 18,144,899 242,474,508
10. Gross Electrical Energy Generated (MWH) 830,400 6,043.720 80,778,180
11. Net Electrical energy Generated (MWH) 792,427 5,779,733 77,022.099
12. Reactor Service Factor 100.0 92.4 85.1
13. Reactor Availability Factor 100.0 92.4 85.1
14. Unit Service Factor 100.0 92.1 84.1
15. Unit Availability Factor 100.0 92.1 84.1
16. Unit Capacity Factor (using MDC) 99.1 92.2 82.2
17. Unit Capacity Factor (Using DER) 96.5 89.8 80.1
18. Unit Forced Outage Rate 0.0 7.9 3.5 W195 Page . 3 of 6

l OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : September 1, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 l

OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

REFUEL - September 22, 1995 - 60 Days

20. If Shutdown at end of report period, estimated date of startup: N/A
21. Unit is in Commercial Operation.

THIS ' YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 5.831 87.096
23. Unit Forcij Outage Hours 0.0 463.0 2.673..2
24. Nameplate Rating (Gross MWe) : 1.200 Max. Dependable Capacity (Gross MWe) : 1.120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A t

l 1

J l

l

.- j

> i l AVERAGE DAILY UNIT POWER LEVEL l 1

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3

. DATE OF REPORT : September 1, 1995

COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352

]

i Reporting Period : August, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level t

1 1,069 16 1,067 2 1,069 17 1,066 j- 3 1,070 18 1,065

4 1,069 19 1,064 l 5 1,069 20 1,064 6 1,069 21 1,065 I

7 1,069 22 1,065 1 8 1,067 23 1,064 >

9 1,066 24 1,063 10 1,067 25 1,062 11 1,068 26 1,061 l

< 12 1,067 27 1,060 13 1,067 28 1,060 i 14 1,065 29 1,060 l 15 1,066 30 1,060 l 31 1,061 l

INSTRUCTIONS :

i On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 3

i.

1 4 MMS Page : 5 of 6

i l

UNIT SHUTDOWNS AND POWER REDUCTIONS l DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : September 1, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 i l

l REPORTING PERIOD : August, 1995 Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions .

NONE IYEE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B -Maintenance or Test C - Refueling D - Regulatory Restriction

      • E - Operator Training and METHOD License Examination 1 - Manual F - Administrative i 2 - Manual Scram G -Operational Error (explain) l 3 - Automatic Scram H -Other (explain)  !

4 - Continuation from Previous Period 5 - Power Reduction  !

6 - Other (explain) I l

l l

4 telm Page 6 of 6