2020-02-Post-Exam Comments
ML20097A451
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/18/2020
From: Rogers J
Pacific Gas & Electric Co
To: John Kirkland
NRC Region 4
References
DCL-20-017
Download: ML20097A451 (3)


Text

Justin Rogers Diablo Canyon Power Plant Manager P.O. Box 56 Operations Training Avila Beach, CA 93424 805.545.3088 Internal: 691.3088 Fax: 805.545.4907 March 18, 2020 PG&E Letter DCL-20-017 Mr. John C. Kirkland, Senior Operations Engineer 10 CFR 55.40 U.S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 - Initial Operator Licensing Examination: Post-Examination Materials

Dear Mr. Kirkland:

In accordance with the guidance provided in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," ES-501, Section C.1.b, Pacific Gas and Electric Company (PG&E) has previously provided the following post-examination materials in electronic or hardcopy format:

  • Questions & Answers Provided to Applicants
  • Examination Seating Chart
  • Examination Performance Analyses
  • Completed Form ES-201-3, "Examination Security Agreement"
  • Notifications Generated During the Examination In addition to the electronic examination materials, PG&E is submitting the following materials:
  • Enclosure 1 - ES-403-1, "Written Examination Grading Quality Checklist"

If you have any questions, please contact Mr. Abdul Kadir, Nuclear Examination Development and Simulator Support Supervisor, at 805-545-4200.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde* Wolf Creek

Mr. John C. Kirkland PG&E Letter DCL-20-017 March 18, 2020 Page2 Sincerely,

~d~

Justin Rogers Operations Training Manager dqmg/6192/51038274-28 Enclosures (Post-Examination Materials) cc: Matt B. Hayes, Organizational Effectiveness and Learning Services Director Abdul Kadir, Nuclear Examination Development and Simulator Support Supervisor Christopher W. Newport, NRC Senior Resident Inspector James M. Welsch, Senior Vice President, Generation and Chief Nuclear Officer A member of the STARS Alliance Callaway* Diablo Canyon

  • Palo Verde
  • Wolf Creek

L111 Exam Validation 07/30 - 08/02/2012 VALIDATOR Comments: All questions were reviewed with the class with emphasis on questions scoring less than 50%.

R1 Question 09 - Question valid. Knowledge of less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> tech specs. Most knew RWST was covered by LCO did not realize RWST level is R2 a one hour Compeletion Time. Covered LCO with candidates.

R3 Question 40 - Question is valid. Candidates stated they either failed to notice that temperature 542F was given the question or believed that R4 RCS temperature would be stablilized at no load Tave - 547F. This is an action in other EOPs such as E-0.1, Reactor Trip Response but not in R5 E-0. The goal is stablize at current temperature (if less than 547F) to prevent pressurizer overfill. Remediate with candidates.

R6 Question 90 - Question is valid. All that missed it misapplied graphs provided. Remediated with candidates.

S1 S2 S3 S4 S5 S6 S7 S8 AVERAGE