ML20100A551
| ML20100A551 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/21/1985 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-5-048, 2NRC-5-48, NUDOCS 8503260087 | |
| Download: ML20100A551 (4) | |
Text
7-~
~
$VL
'Af Duquesne L@t =g28 Nuclear Construction Division (412) 923-1960 Robinson Plaza, Building 2, Suite 210 Telecow (412) 787-2629 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:
Attached is a cur rent list, as of March 15 , 1985, which provides our understanding of the outstanding issues wh ich remain open. Items identified as "c omple t e" are those for which responses have been provided i
and no confirmation of status has yet been received from the staff. We consider these items catisfactorily closed unless notified otherwise. In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved. Items identified as
" confirmatory" are based upon formal or informal communications or agree-ments with the staff. Please info rm us of any disagreement of status described on the attached list.
DUQUESNE LIGHT COMPANY By ,
Jg. arey /
Vice resident GH0/wjs Attachment cc: Mr. H. R. Denton, Director NRR (w/ attachment)
Mr. H Thompson, Director Division of Licensing (w/ attachment)
Mr. B. K. Singh, Project Manager (w/ attachment)
Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)
Mr. G. Walton, NRC Resident Inspector (w/ attachment)
BVPS-2 Outstanding Issue 2 Strtus APPLICANT
RESPONSE
DIV. BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz
- Qualification of RHR ptraps Closed 02/08/85
- Natural Circulation Test IRC ICSB F. Burrows
- Stean Generator level Control aid Pratection B 05/30/84 ASB R. Anand
- Internally Cemrated Missiles -
Outside containnent Closed 01/08/85
- Internally Generated Missiles -
Inside containnent Cloced 01/08/85
- Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
- Ebel Pool (boling and Cleanup systen Closed 01/08/85
- Overheal heavy load harxilirg systen Mtc 02/13/85
- Standby service water system Closed 01/08/85
- Primary Conponent Cooling Water sy: ten A M/30/85
- Condensate and Feedwater System Closed 01/08/85 Auxiliary Feedwater Systen IRC 01/08/85 PSB J. Knox
- Eleccrical - 17 open Items A R. Giardina
- lbchanical - 46 open itens A CPB A. Gill
- Icose part detection Cmplete 03/04/85
- Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
- Analysis of combined ILCA ani seismic loads A 03/28/85
- On-line detection method Closed 09/07/84 PETB E. Markee x/q B 02/15/85
- Snow & Ice Ioal B 01/16/85 AEB K. Desrpsey
- Rafiation consequences of ILCA B 11/08/84
- Rod ejection a cidents B 11/08/84 PEB Y. Li
- Primary vs. secondary loads Canplete 02/20/85
- In service testing A 06/85
. APPLICAhT RESPOEE DIV. BRAN 01 REVINER ISSUE M7IE IBIE RMIES
- Asyurnetric IOCA loads tRC IE !EB' O. Rothberg
- P1V leak testing IRC SGEB K. Imu
- Seismic Input Closed 02/01/85 -
- Seismic systen analysis Closal 02/01/85
- Concrete containment Closed 12/21/84
- Concrete and Structural steel internal structures Closed 12/21/M
- Other Categpry I structures Closed 12/17/84
- Fomdations Closed 12/17/84
- Soil Structure Interaction (SSI)
Analysis $RC 02/01/85 GSB G. Giese-Koch
- Seismology Complete 02/20/85 EQB H. Walker
- Environmental Qualification Confirmatory 08/05/84 J. Inibardo
- Pmp & Valve Confirmatory 08/05/84 A. Ime
- Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
- Preservice Inspection Progran A 06/85
- Inservice inspection o' Class 2 & 3 components A 06/85 D. Smith
- Underclai cracking of forgings in R.V. Cicsed 08/10/84 OEB J. Stang
- Safe shutdown A 09/85
- Alternate shutdown A 09/85
- Fire in Cable spreading room B 05/30/84 WEB R. Gonzales
- Potential for flooding fmn local precipitation B 05/30/84
- Flooding from Peggs Rm B 05/30/84 IHFS HFEB R. Eckenrode
- Safety paraneter display systen aid control roon design review A 03/28/85 IRB F. A11enspack
- Managenent & Organization A
, APPLICANT RESP 0 FEE DIV. BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker
- Initici test progran A S. Bryan
- Bnergency operatirg procedure Closed I!E EPB J. Sianonds
- Emergency Preparedness Plan A 04/15/85 Reg.1
- Cross-Training progran A NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit
/?:
a
- _ - . - - - _ . . ~ ,, _ ,, _ _ ..-. _~ _ . _ _ - _ . - _ . . . . . . . _ . . . . _ . . ,