Forwards Current Listing of SER Outstanding Issues.Specific Description of Unresolved Issues Requested
ML20100A551
Person / Time
Site: Beaver Valley
Issue date: 03/21/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-5-048, 2NRC-5-48, NUDOCS 8503260087
Download: ML20100A551 (4)


Text

7-~

~

$VL

'Af Duquesne L@t

=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:

Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open.

Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff.

We i

consider these items catisfactorily closed unless notified otherwise.

In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.

Items identified as

" confirmatory" are based upon formal or informal communications or agree-ments with the staff.

Please info rm us of any disagreement of status described on the attached list.

DUQUESNE LIGHT COMPANY By J g.

arey

/

Vice resident GH0/wjs Attachment cc:

Mr. H. R. Denton, Director NRR (w/ attachment)

Mr. H Thompson, Director Division of Licensing (w/ attachment)

Mr. B. K. Singh, Project Manager (w/ attachment)

Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

BVPS-2 Outstanding Issue 2 Strtus APPLICANT

RESPONSE

DIV.

BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz

  • Qualification of RHR ptraps Closed 02/08/85
  • Natural Circulation Test IRC ICSB F. Burrows
  • Stean Generator level Control aid Pratection B

05/30/84 ASB R. Anand

  • Internally Cemrated Missiles -

Outside containnent Closed 01/08/85

  • Internally Generated Missiles -

Inside containnent Cloced 01/08/85

  • Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
  • Ebel Pool (boling and Cleanup systen Closed 01/08/85
  • Overheal heavy load harxilirg systen Mtc 02/13/85
  • Primary Conponent Cooling Water sy: ten A

M/30/85

  • Eleccrical - 17 open Items A

R. Giardina

  • lbchanical - 46 open itens A

CPB A. Gill

  • Icose part detection Cmplete 03/04/85
  • Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
  • Analysis of combined ILCA ani seismic loads A

03/28/85

  • On-line detection method Closed 09/07/84 PETB E. Markee x/q B

02/15/85

  • Snow & Ice Ioal B

01/16/85 AEB K. Desrpsey

  • Rafiation consequences of ILCA B

11/08/84

  • Rod ejection a cidents B

11/08/84 PEB Y. Li

  • Primary vs. secondary loads Canplete 02/20/85
  • In service testing A

06/85

APPLICAhT RESPOEE DIV.

BRAN 01 REVINER ISSUE M7IE IBIE RMIES

  • Asyurnetric IOCA loads tRC IE

!EB' O. Rothberg

  • P1V leak testing IRC SGEB K. Imu
  • Seismic Input Closed 02/01/85 -
  • Seismic systen analysis Closal 02/01/85
  • Concrete containment Closed 12/21/84
  • Concrete and Structural steel internal structures Closed 12/21/M
  • Other Categpry I structures Closed 12/17/84
  • Fomdations Closed 12/17/84
  • Soil Structure Interaction (SSI)

Analysis

$RC 02/01/85 GSB G. Giese-Koch

  • Seismology Complete 02/20/85 EQB H. Walker
  • Environmental Qualification Confirmatory 08/05/84 J. Inibardo
  • Pmp & Valve Confirmatory 08/05/84 A. Ime
  • Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
  • Preservice Inspection Progran A

06/85

  • Inservice inspection o' Class 2 & 3 components A

06/85 D. Smith

  • Underclai cracking of forgings in R.V.

Cicsed 08/10/84 OEB J. Stang

09/85

  • Alternate shutdown A

09/85

  • Fire in Cable spreading room B

05/30/84 WEB R. Gonzales

  • Potential for flooding fmn local precipitation B

05/30/84

  • Flooding from Peggs Rm B

05/30/84 IHFS HFEB R. Eckenrode

  • Safety paraneter display systen aid control roon design review A

03/28/85 IRB F. A11enspack

  • Managenent & Organization A

APPLICANT RESP 0 FEE DIV.

BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker

  • Initici test progran A

S. Bryan

  • Bnergency operatirg procedure Closed I!E EPB J. Sianonds

04/15/85 Reg.1

  • Cross-Training progran A

NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit

/?: