7-~
~
$VL
'Af Duquesne L@t
=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:
Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open.
Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff.
We i
consider these items catisfactorily closed unless notified otherwise.
In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.
Items identified as
" confirmatory" are based upon formal or informal communications or agree-ments with the staff.
Please info rm us of any disagreement of status described on the attached list.
DUQUESNE LIGHT COMPANY By J g.
arey
/
Vice resident GH0/wjs Attachment cc:
Mr. H. R. Denton, Director NRR (w/ attachment)
Mr. H Thompson, Director Division of Licensing (w/ attachment)
Mr. B. K. Singh, Project Manager (w/ attachment)
Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)
Mr. G. Walton, NRC Resident Inspector (w/ attachment)
BVPS-2 Outstanding Issue 2 Strtus APPLICANT
RESPONSE
DIV.
BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz
- Qualification of RHR ptraps Closed 02/08/85
- Natural Circulation Test IRC ICSB F. Burrows
- Stean Generator level Control aid Pratection B
05/30/84 ASB R. Anand
- Internally Cemrated Missiles -
Outside containnent Closed 01/08/85
- Internally Generated Missiles -
Inside containnent Cloced 01/08/85
- Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
- Ebel Pool (boling and Cleanup systen Closed 01/08/85
- Overheal heavy load harxilirg systen Mtc 02/13/85
- Standby service water system Closed 01/08/85
- Primary Conponent Cooling Water sy: ten A
M/30/85
- Condensate and Feedwater System Closed 01/08/85 Auxiliary Feedwater Systen IRC 01/08/85 PSB J. Knox
- Eleccrical - 17 open Items A
R. Giardina
- lbchanical - 46 open itens A
CPB A. Gill
- Icose part detection Cmplete 03/04/85
- Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
- Analysis of combined ILCA ani seismic loads A
03/28/85
- On-line detection method Closed 09/07/84 PETB E. Markee x/q B
02/15/85
- Snow & Ice Ioal B
01/16/85 AEB K. Desrpsey
- Rafiation consequences of ILCA B
11/08/84
- Rod ejection a cidents B
11/08/84 PEB Y. Li
- Primary vs. secondary loads Canplete 02/20/85
- In service testing A
06/85
APPLICAhT RESPOEE DIV.
BRAN 01 REVINER ISSUE M7IE IBIE RMIES
- Asyurnetric IOCA loads tRC IE
!EB' O. Rothberg
- P1V leak testing IRC SGEB K. Imu
- Seismic Input Closed 02/01/85 -
- Seismic systen analysis Closal 02/01/85
- Concrete containment Closed 12/21/84
- Concrete and Structural steel internal structures Closed 12/21/M
- Other Categpry I structures Closed 12/17/84
- Fomdations Closed 12/17/84
- Soil Structure Interaction (SSI)
Analysis
$RC 02/01/85 GSB G. Giese-Koch
- Seismology Complete 02/20/85 EQB H. Walker
- Environmental Qualification Confirmatory 08/05/84 J. Inibardo
- Pmp & Valve Confirmatory 08/05/84 A. Ime
- Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
- Preservice Inspection Progran A
06/85
- Inservice inspection o' Class 2 & 3 components A
06/85 D. Smith
- Underclai cracking of forgings in R.V.
Cicsed 08/10/84 OEB J. Stang
09/85
- Alternate shutdown A
09/85
- Fire in Cable spreading room B
05/30/84 WEB R. Gonzales
- Potential for flooding fmn local precipitation B
05/30/84
- Flooding from Peggs Rm B
05/30/84 IHFS HFEB R. Eckenrode
- Safety paraneter display systen aid control roon design review A
03/28/85 IRB F. A11enspack
- Managenent & Organization A
APPLICANT RESP 0 FEE DIV.
BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker
- Initici test progran A
S. Bryan
- Bnergency operatirg procedure Closed I!E EPB J. Sianonds
- Emergency Preparedness Plan A
04/15/85 Reg.1
- Cross-Training progran A
NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit
/?: