ML20100K813
| ML20100K813 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/05/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8504160090 | |
| Download: ML20100K813 (1) | |
Text
1 p 9
- ,, l DUKE POWER GOMPAl%Y#' D-P.O. box 33180 rs CHARLOTTE, N.C. 28242 'r HALH.TtJCKER TELEPHONE l mm == o==r poy ams31 January 5, glg pie g} ;
= = = = = = = = ,
J' '
I3 y y f; L Mr.-James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street,.NW, Suite 2900 Atlanta, Georgia 30303 Re: McGuire Nuclear ation Docket'Nos. 50 36} 50-370 l
Dear Mr. O'Reilly:
This letter is a Special Report submitted as required by McGuire Nuclear Station Technical Specification 3.7.8.
Duke Power Company has a design change planned which modifies the total number of mechanical snubbers identified in the Technical Specifications.
'A description of the planned change follows.
Modification No. MG-2-0315 (Unit 2) 1 This modificatien deletes one mechanical snubber in the Main Feedwater (CF)
System. A reanalysis of the affected piping showed that the stresses are within acceptable values without the snubber installed.
A revision to Technical Specification 3.7.8 to reflect the above modification l will be submitted with the next license amendment request.
Please advise if there are any questions regarding this matter.
Very truly yours, l
Hal B. Tucker GAC/php cc: Mr. Harold R. Denton, DJrector Mr. W. T. Orders )
Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 fER IM 8j8$8jg 'OFFICAC COPY PDR 16a0 ,