JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER There were no unit shutdowns or significant power reductions during the month of November. j The following major safety-related maintenance was performed in the i month of November: ,
- 1. Performed miscellaneous corrective and preventive maintenance j on diesel generators.
i 1 1 i j s I i + i i S412210080 841130 PDR ADOCK 05000348 R PDR l
es se srw s. 3u_,o I UNIT - e . . DAR _12-5-84 COMPLEED SY J. D. Woodard (205) 899-5156 F ** HONE November, 1984 - St0tml . DAY AVERACE DAILY FOWER LEVEL DAY AVERAGE DAILY POWER LEVEL lalWe-Net) (31We Net)
;, 811 g7 823 2 813 33 . 816
~~ ~
8r3~ ----- -__..__...___.___g9-. 814"' 3 . . _ _ 4' 815 gg 820 823
$ A17 23 821 , n 826 6
7 821 23 824 822 825 g ,4 821 . . 823 9 10 817 3 819 11 820 27 814 749 819 12 m g3 752 9 821 14 - 30 820 822 IS 3t 16 8I9 C M UCUONS On this form: . list the aver:ge d:ily unit power levelin MWe. Net for c:ch d y in the reporting month. Campute to
, the ne:re:t whule rneg: watt.
(9p7)
F * ! ~. .. .. l OPERATING DATA REPORT l-
- DQCKET NO. sn uA _
l DATE to_n_nx COMPLETED BY J.D. Woodard TELEPHONE (205) 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes -
- 1. Unit Name: ,
- 2. Reporting Period: November. ~ 1984 1) Cumulative data since 2652 12-1-77, dat'e"of f _. 3. Licented Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 860 commercial o.peratign.
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe): 841.8
- 7. Maximum Dependable Capacity (Net MWe)- 797*1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 1) Since Last Report. Give Reasons:
N/A l M/^
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any: N/A .,
~
- x. . .
His MEnth Yr to-Date "CuEiulative
- 11. Hours In Reporting Period 720 8,040 61,368
- 12. Number Of Hours Reactor Was Critical 720.0 6,261.8 41,385
- 13. Reactor Reserve Shutdown Hours 0.0 on 1.6so.0
- 14. Hours Generator On.Line 720.0 6.177.0 40.280.4
- 15. Unit Reserve Shutdown Hours 0.0 0. 0 -
0.0 I
- 16. Gran Thermal bergy Generated (MWH) 1,898,355 15,900,262 102;001,788 .
'l7. Gross Electrical Energy Generated (MWH) 618,148 5,133,044 '32,476,054
- 18. Net Electrical Energy Generated (MWH) 586.670 ' 4lR42.116 _10. 54 'E 198
- 19. Unit Service Factor 100.0- 76.8 65.6
- 20. Unit Availability Factor 100.0 ,. 76.8 65.6 162.2
- 21. Unit Capacity Factor (Using MDC Net) ~-{75.6
, , _ , ,, 62.4
- 22. Unit Capacity Factor (Using DER Net) QR 1 .. __ 77 A 60.0
- 23. Unit Forced Outage Rate 0.0 1.3 '13.4 m_ ,
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Durdan of Eachf.
Refueling / maintenance outage. 4/5/85, approximately 5 weeks.
~
I
- 25. If Shut Down At End Of Report Pericd. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commer:ial Operation): Forecast Achieved INITIA L CRITICALITY - nn-n6-77 nn-no.77 INITIAL ELECTRICITY . 08-20-7.7 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 tuf n i
UNIT SilUlDOWNS AND POWER REDUCTIONS DOCKET NO. Sn-3An UNIT NAhf E T,M, v2rIey nnit 1-DATE 17-5-Ra COhlPLETEI) IlY in unna -a
. REPORT MONill November TEl.LPilONE (2n5)noo_5{56 r.
- E E No. Date n-
.E E 3g "g
j E} Licensee E r, hi Cause & Correceive Action in N .3 s x Event Repor: # gi mo go fE & 3 gy, c a , u
, Prevent Recurrence 6
S THERT WERE .NO UNIT SIF TDOWS OR SIC VIFICANT POWEl l RED 11CTIONS DU TING THE MONTH OF N.0VEMBER. l l 2 3 4 F: Forced Reason: hie hod: Exhibis G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee C Refueling 3 Automatic Scraru. Event Repini (1.ER) File INUREG-D.Itegulasmy Restriction 4 Other (Explain) 0161) . E-Operator Training & IJcense Examination F Adeninistrative 5 G Operational E:ror (Explain) Exhibit i . Same Source (9/77) ll Othe: (Explain)
MalHng Address
' ,* - . Alib:1na Pow 3r Company 600 North 18th Strsst Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower the rx."sm eectrc sys*em December 10, 1984 Docket No. 50-388 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the November 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. If you have any ouestions, please advise. Yours very t ,
/r ,q R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) Y t y'
._}}