ML20101C435

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1984
ML20101C435
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/30/1984
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8412210080
Download: ML20101C435 (5)


Text

{{#Wiki_filter:- .e, m. JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER There were no unit shutdowns or significant power reductions during the month of November. j The following major safety-related maintenance was performed in the month of November: i 1. Performed miscellaneous corrective and preventive maintenance j on diesel generators. i 1 1 i j s I i + i i S412210080 841130 PDR ADOCK 05000348 R PDR l

es se srw s. 3u_,o I UNIT e DAR _12-5-84 COMPLEED SY J. D. Woodard (205) 899-5156 F ** HONE November, 1984 St0tml DAY AVERACE DAILY FOWER LEVEL DAY AVERAGE DAILY POWER LEVEL lalWe-Net) (31We Net) g7 823 811 816 2 813 33 ~~ ~ 8r3~ ----- 814"' 3 -__..__...___.___g9-. 4' 815 gg 820 823 A17 23 821 826 6 , n 7 821 23 824 822 825 g ,4 9 823 821 10 817 3 819 11 820 27 814 749 819 12 m g3 752 9 821 14 30 820 822 IS 3t 16 8I9 C M UCUONS On this form:. list the aver:ge d:ily unit power levelin MWe. Net for c:ch d y in the reporting month. Campute to , the ne:re:t whule rneg: watt. (9p7)

F ! ~... l OPERATING DATA REPORT l-DQCKET NO. sn uA _ l DATE to_n_nx COMPLETED BY J.D. Woodard TELEPHONE (205) 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes

1. Unit Name:
2. Reporting Period:

November. ~ 1984

1) Cumulative data since f _.
3. Licented Thermal Power (MWt):

2652 12-1-77, dat'e"of 860 commercial o.peratign.

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 841.8 797*1
7. Maximum Dependable Capacity (Net MWe)-
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 1) Since Last Report. Give Reasons:

N/A l

9. Power Level To Which Restricted,If Any (Net MWe):

M/^

10. Reasons For Restrictions,If Any:

N/A ~

x...

His MEnth Yr to-Date "CuEiulative

11. Hours In Reporting Period 720 8,040 61,368
12. Number Of Hours Reactor Was Critical 720.0 6,261.8 41,385
13. Reactor Reserve Shutdown Hours 0.0 on 1.6so.0
14. Hours Generator On.Line 720.0 6.177.0 40.280.4
15. Unit Reserve Shutdown Hours 0.0
0. 0 0.0 I
16. Gran Thermal bergy Generated (MWH) 1,898,355 15,900,262 102;001,788

'l7. Gross Electrical Energy Generated (MWH) 618,148 5,133,044 '32,476,054

18. Net Electrical Energy Generated (MWH) 586.670

' 4lR42.116 _10. 54 'E 198

19. Unit Service Factor 100.0-76.8 65.6
20. Unit Availability Factor 100.0 76.8 65.6
21. Unit Capacity Factor (Using MDC Net) 162.2

~-{75.6 62.4

22. Unit Capacity Factor (Using DER Net)

QR 1 77 A 60.0

23. Unit Forced Outage Rate 0.0 1.3

'13.4 m_

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Durdan of Eachf.

Refueling / maintenance outage. 4/5/85, approximately 5 weeks. ~ I

25. If Shut Down At End Of Report Pericd. Estimated Date of Startup:
26. Units in Test Status (Prior to Commer:ial Operation):

Forecast Achieved INITIA L CRITICALITY - nn-n6-77 nn-no.77 INITIAL ELECTRICITY 08-20-7.7 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 tuf n i

UNIT SilUlDOWNS AND POWER REDUCTIONS DOCKET NO. Sn-3An UNIT NAhf E T,M, v2rIey nnit 1-DATE 17-5-Ra COhlPLETEI) IlY in unna -a . REPORT MONill November TEl.LPilONE (2n5)noo_5{56 r. E E .E E "g j E} Licensee E r, h Cause & Correceive No. Date n-i Action in 3g .3 s x Event gi go N fE 3 gy, c Repor: # mo Prevent Recurrence u a 6 S THERT WERE.NO UNIT SIF TDOWS OR SIC VIFICANT POWEl l RED 11CTIONS DU TING THE MONTH OF N.0VEMBER. l l 2 3 4 F: Forced Reason: hie hod: Exhibis G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee C Refueling 3 Automatic Scraru. Event Repini (1.ER) File INUREG-D.Itegulasmy Restriction 4 Other (Explain) 0161) E-Operator Training & IJcense Examination F Adeninistrative 5 G Operational E:ror (Explain) Exhibit i. Same Source (9/77) ll Othe: (Explain)

MalHng Address Alib:1na Pow 3r Company 600 North 18th Strsst Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower the rx."sm eectrc sys*em December 10, 1984 Docket No. 50-388 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the November 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. If you have any ouestions, please advise. Yours very t /r ,q R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies) Director, RII (1 copy) Y t y' _}}