Responds to Generic Ltr 84-24 Re Certification of Compliance w/10CFR50.49 & Forwards Restatement of 850109 Request for Exemption from 10CFR50.49 Schedule Re Environ Qualification of Electric Equipment Important to Safety
ML20102A516
Person / Time
Site: Peach Bottom  
Issue date: 02/05/1985
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Thompson H
Office of Nuclear Reactor Regulation
References
GL-84-24, IEB-79-01B, IEB-79-1B, IEB-82-04, IEB-82-4, NUDOCS 8502080427
Download: ML20102A516 (32)


Text

e PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)841-4502

< .. 7.57ff70.L,.c. February 5, 1985 Docket Nos. 50-277 50-278 Mr. Hugh L. Thompson Jr., Director Division of' Licensing U.S.~ Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Generic Letter 84-24, " Certification of Compliance to 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for. Nuclear Power Plants" y ,.

REFERENCE:

Letter, S. L. Daltroff, PECo, to J. F. Stolz, NRC, dated January 9, 1985 (Request-for an Exemption to the 10 CFR 50.49 Schedule Regarding Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants - Peach Bottom Atomic Power Station) i

Dear'Mr. Thompson:

The subject Gener'ic Letter, dated December 27, 1984, requested. Philadelphia Electric Company to provide under oath

~information relating to compliance with 10 CFR 50.49,

" Environmental Qualification (EQ) of Electric Equipment Important to Safety", at_our Peach _ Bottom Atomic Power Station (PBAPS). A belated' submittal of our response was discussed with your Project Manager for Peach l Bottom Atomic Power Station and found acceptable because Philadelphia Electric Company did not receive your letter until January 11,.1985.

This letter and its attachments provide the requested

~information. A restatement ~of'the Commission's request, together with our responses relative to Peach Bottom Units 2 and*

-3, follows.

8502080427 850205 5 PDR ADOCK 050002774 m M

- - -_P- -

PDRi g p4-

V? ,

J K' Mr. Hugh L. Thompson, Jr. .

February 5, 1985 Page 2 3 Request-A iThitiPhiladelphia Electric Company,has in-place and is implementing an Environmental' Qualification Program that will l satisfy:the requirements of 10 CFR-Section 50.49 within the

' currently' approved schedule for the plant without further Lextension.

LResponse A

' Philadelphia Electric ~ Company has an Environmental

, Qualification: Program in placc for Peach Bottom Units 2 and 3 that1 satisfies the-requirements of.10 CFR Section 50.49 within the currentlyLapproved schedule for Peach Bottom Units 2?and43,'exceptifor the exemptions requested in the Reference lettercof January 9, 1985 and identified below.

-SinceDthe' submission of'the January 19, 1985 exemption

-request',; Philadelphia Electric Company has determined that delays in completion'of' major piping modification work will

~

delayithe Unit 2 outage beyond. March 31, 1985. As a result,

'preoperationalitesting of three EQ modifications:

1. . Installation of two new reactor pressure indication loops-emergency procedure instrumentation; 12h Installation of acoustic monitor'for SRV-position

- indication; and

~

~ 3 ~.1 Installation of two suppression pool water.

. temperature indicators-emergency procedure instrumentation;L M .wil10 notibeiperformed until the end of.the currentcrefueling

't

-outage.s ~ALrestatement ofqthe Peach Bottom' Unit 2 portion of

the exemption-r6 quest submitted--January 9,'1985,Jtogether

. y- swith,the; additional.EQ-. modifications described above,Lis

~ enclosed!as: Attachment 1,1" Request for/an: Exemption-to.the 10

'CFR 50.49 Schedule Regarding Environmental; Qualification of

~ ~ Electric Equipment ~Important . to ' Safety ;for Peach Bottom

> Atomic: Power' Station4 Unit.2."

$l . - . . .. . . .

2

Philadelphia; Electric 1has also determined that the Unit 3-Tmodification, the -installation Lof- two' newMreactor pressure indication ^1 oops-emergency procedure instrumentation, which

, fwelidentified:as a " Regulatory Guide l.97? modification"~in Attachmentfl~-of our January 9, 1985. exemption-request, is Jalsofconsidered an EQ Lmodification. _Since this modification fisioutage. related and :the : Unit /3. refueling outage is not, 1scheduledito startountil after, March 31; 1985, . Philadelphia LElectric~CompanyTrcquests an exemption until November 30,

'* Q m *f4

"-*--( t v ~

& ' Q ,

n B .

v iMr.-HughLL. Thompson,fJr. February 5, 1985 Page 3

1985.forJthis modification. A restatement of the Peach Bottom' Unit 3 portion of our exemption request submitted

'. -January ~9', 1985, together with the EQ modification described

'above, is;; enclosed as Attachment 2, " Request for an Exemption to_the 10 CFR 50.49 Schedule Regarding Environmental

-Qualification of Electric Equipment Important to Safety for Peach? Bottom Atomic Power Station Unit 3."

Request B.

That'the plant'nas at least one. path to safe shutdown using fully
; qualified equipment, or has submitted a justification for
continued; safe operation -(JCO) pending full qualification of any
equipment notLfully qualified.

fResponse B-

. Oneipath to safe'shuidown post DBA exists-through the ioperation of. the: Automatic -Depressurization System (ADS) and

'the Residual Heat Removal System (RHR). The necessary ADS

.and RHR system electrical equipment is qualified; therefore, one path to. safe shutdown using qualified equipment' exists ~at~

.PBAPS Units:2 and 3.

w:

RequestLC1 (Thatiall other equipment within the scope of 50.49 is either-fully qualified orfacJCO has been submitted pending full jgualification.

.r-

. Response C-LWith' 'the : exception . of the. PBAPS Unit 2 modification - to

~

tinstall acousticJmonitors to~ monitor ^SRV-position indication, l Attachment-3,'" Justification lfor1 Continued Operation

LPertainingeto Environmental-Qualification of Equipment-nImportant-to Safety",-contains all JCO's for equipment listed.

}y' -

? 'withinJAttachments-1 Land 2 to this letter. All other .

~

Lequipment within the scope.of 50.49'has been-qualified.

, ~Nkuest 1The 'certifi' cations de' scribed in. Requests A, B and C should-specifically addressLall NRC IE Bulletins and-Information Notices

'thatfidentify:EQ problems, relevant.to Peach Bottom Atomic Power p . Station,f, Units-2.and 3. The NRC considers:the following IE M -Bulletin and-IE Information-Notices to be applicable for

~

w n ~ ,

I* . . Dn, ,

 ; y: _

s 7

, hMr.}Hugh skThompson, Jr. February 5, 1985

~ ~

g;g Page 4 p

consideration; IE Bulletin 82-04, IE Information Notices 82-11,

<:82-;52,< 83- 45, ~ 83-72f 84-23, 84-44,784-47, 84-57, 84-68 and 84-78.

4 S: _

M - LResponse' Specifically Addressing NRC- IE Bulletins and

, J~ .-Information -Notices :

~

, Philadelphia Electric! Company has examined as part.of its.EQ

_ ,-Program effort, NRC-IE Bulletin 82-04 and NRC IE Information Notices 82-ll,182-52, ' 83-4 5, 83-72, 84-23, 84-44, 84-47; 84-

- $57,K84-68Eand-84-78. Attachment 4, " Responses to NRC IE

. m. S .

BulletinsiandgInformation? Notices That Identify Environmental

  • };3 .

QualificationiProblems Relevant to Peach Bottom--Atomic Power

< , 2 Station," specifically.:a'ddresses.the actions taken by Philadelphia': Electric Company..

4 af-J h'

NQ +

'I ' (Weiare'takingithis opportunity.of.providing-

'clarific'ation of'certain: statements that were included within

'4 kpreviou's? Philadelphia Electric Company _submittals regarding f -Environmental Qualification'of Electric Equipment Important-to 1 Safety as;follows: ,

g. ,

.) j _ t.,

~

, ; By letterc dated: October _18',1984, TJ;: F. :Stolz ---(NRC) :to

. 1 JE./G.?Bauer ,JJr. :(PECo) ,"the Commission transmitted itsi" Safety 7 % LEvaluationiReport?for'Environmentali Qualification'of Electric

, - G VEquipment:iImportantito1 Safety _ ifor~ Pe.ach2 Bottom ' Units 1: 2 and.'3".-

%M

'J.

~

1, .

Included-within both Safety; Evaluation Reportsiwas a'--

$- jrestatement1ofResponse Al of Attachme'nt-11ofDPhiladelphia f _

Electr.ic' Company 's!l letter Jr_esponse' ' dated .; June 113, 1984 _ (S .
L. .

"Daltroff,;PECok to:JE F.'Stolz,INRC)Lto the Co'mmission's May'114, 9 1 9 8'4 , l e t t e r ,:: J . ? F . J S t o l z . t'o ) E . ' G . ! B a u e r , 1 J r . ,'. " E q u i p m e n t'-

! Qualification of Equipment (;Important'to' Safety-Re_ quest;forc fAdditional /Information." _ This ;particular : response regarde'd Tour.

  1. imethodologylusedsto(identify equ'ipment (asi de fined Lin:c paragraph '

- ' ;(b) (1)fof 110JCFRi 50.;49) :requiredf toDremain functional"during- or _- -

f Qfollowingidesign-basis 'Lossiof". Coolant Accide.nt (LOCA)1;orp High? .

Y l - dEnergy6 Lines BreakE(HELB) ' Accident. ' As stated t in ?ResponseLAl;of ?

~

^

m .~fthe? June 413,J.1984? letter,iPhiladelphia Electric. Company-y5 ;determinedithe: role'.oflindividual electrica17 components in .

9["' , EsupportingDthe.operationiof-systessiidentifiedLin?the FSAR;by iconcurrentlytreviewing._ thel'Q'-list,iElectrical'Schematici

% g -iiDrawings,? Emergency OperatingTProceduresiand:Pipingland:

M HInstrumentf Diagrams. JThe. response 1 further statedE(and:was P . Arepeatediinl;the-Commission's Safety Evaluation Reportffor?

% IEnvironmenta1JQualificationDfor7 Peach ~ Bottom Units'2:and'3) .that' F W s"AlthoughfaJreview 3of(theLTechnic'al Specifications was not:

(conducted,ithe?Q' -listicontains all the. equipment thati appearsi Sin the: Technical. Specifications;7and therefore, the equipment-g:n <;; , .

^ ~

~

,,,pf ,

~

,N -U "-

_%f .

s --- -

f. x
p fn- .g ,

"f

f

K Mr. HughDL.fThompson, Jr. February 5, 1985 k-  : Page 5 1

f I'

' ~

within the-Technical Specifications has been implicitly lincludsd." -This statement is inaccurate. The Peach Bottom Atomic Power Station 'O'-list does not contain all the equipment

~

identified in the Technical Specifications. The statement that Eshould have been made in response.to Item Al is:

0 Although a review of the Technical Specifications was not conducted, the scope of equipment reviewed, based on the documents identified above (the 'O'-

list, Electrical Schematic Drawings, Emergency o' _

Operating Procedures and Piping and Instrument

. Diagrams), encompasses the scope of equipment required to mitigate a LOCA or HELB accident.

It should be noted that this revised response in no way

~

' changes the adequacy and completeness of the list of environmentallyLgualified equipment at Peach Bottom Atomic Power

' Station.

-Philadelphia Electric Company also wishes to clarify two portions of our' submission'of-February 21, 1984, S. L. Daltroff

~

-to J. F. .Stolz ~ (Peach Bottom' Units 2 and .3 Resolution of Safety

.EvaluationiReports~ Relating to IE Bulletin 79-OlB, " Environmental Qualification of Class ,lE l Equipment"..)'.'- ' Attachment 2 of the February 21, 1984,: letter _ included a. summary of the resolution of all theJelectrical' equipment. environmental. qualification

'deficienciestidentified'by Franklin Research Center in their nAugust~3,-1982,, Safety. Evaluation Report _ transmitted to

[ Philadelphia Electric Company by letter, J. F.LStolz.to E. G.

'Bauer,;Jr'., December 20, 1982.-

Pagerll of Attachment 2 of the February 21, 1984,. letter

_ presented _our Evaluation of the AutomaticLvalve. corporation's

-(AVC): Pilot Solenoid valves for: steam relief: valves and-MSIVs.

1The. Evaluation.statedLthat the steam. relief valves _are

~

1 reconditioned.every refueling-outage. This statement-is

' incorrect. -The Steam Relief Valves are. reconditioned every Lsecond refueling _ outage, but the pilot: solenoid valves-are not'

~

included ~in.the reconditioning. -The AVC-pilot solenoid valves b are.ina: preventive' maintenance program for replacement overy
  1. ~

fthird refuelingLoutage.. .The1 specific revision to the section

" Evaluation",is; identified by a vertical bar in the margin of the enclosed:

Attachment:

5."RevisionutolPECo Evaluation for Automatic

-  ; Valve:CorporationiPilot Solenoid Valves".

-Page 24 of Attachment 2 of the February 21, 1984, letter presented :a Technical Discussion of the Reliance ECCS cooler fan motors which included the: testing, lubricating and reconditioning schedule of:theLarea coolers. The' Technical Discussion stated-

~

F

'that the; original motor. bearings were_ replaced with sealed

-m .m-. , _

~ - - . $

e ;;" ,

J-

~ v ,. :

1 LMr. Hu'hiL. g Thompson, Jr.

_ February 5, 1985 Page 6 ap (bear'ings.cLThis statement is incorrect. The Reliance ECCS cooler 7

fan original motor bearings l'n the RHR, Core Spray and HPCI are not replaced.sith sealed bearings, but are instead reconditioned on _ a--five-year s cycle. . This reconditioning consists of

-installation of-;new bearings, dipping the winding (when necessary),fcleaning, balancing,. lubricating and "hi-pot"

-testing. ,The specific' revision to-the se~ction " Evaluation" is

, -identified byfa' vertical bar in the margin of the enclosed U.-- tAttachment'6, " Revision.to Technical ~ Discussion of Reliance ECCS

~

!CooleriFanfMotors"~ .

. . Should you have'any. questions'or require additional

~

Jinformation,-pleaseldo notLhesitate to contact us.

v.

Very truly yours, SWf 2

' +  : Attachments cc: J. F.'Stolz,; Chief,' Division'of Licensing, USNRC

-' T .-- P .' J o h n s o n ,'- S i t e . I n s p e c t o r w.

i 1

'? ,

i

,, 4 4h. k J

.27 1

5 '

,,A.r

?" k ' m - '

%d L .  :- -._

p- u.

y. .

_ s ,

n_-

qq.

  • ~

-)

;-. COMMONWEALTH OF PENNSYLVANIA

'n  : ss.

COUNTY OF -PHILADELPIIIA  :

.c

.Ji.S.-Kemper, being first duly sworn, deposes and says:

J'

' That he is Vice President of Philadelphia Electric Company;.:that he has read the; foregoing partial response to

? Generic 7-Ldtter'84-24 and knows the contents thereof; and that the

'.statementsVand matite'rs set forth therein are true and correct to 1

.thezbest=offhis.~ knowledge,/information and belief.

)

^ '

f

_,,ty.l>s ,

7l . : :yn.-

?.;p .

t,

'. ' Subs. %cribediand '. sworn to:

g y ,. , g m

- M fore m%..e.thisIt

..Wdapi 4 ,..,-%

sZ f o'f %hubfad ,d%N y.. ;

.cxd+/Jht: , -

v ~

Notary Public,-

g JUDf7H Y. PRANNUN Notary Public, Phila., Phile.~Co. I -

' My Commission Expires July 28,.1987.. '

~

_ " e:

4 s ,,[,. ' -

3: '

e , .-

3.'

4r

-__ -. - crr.,*-~wm - - * ---p +

  • ry r-

.g_; y s .. - _h

mi- 3, r 1 ~

..!A ' ,

.+ . . ,.

,1-t A ~

\ f' i.- ,.

ATTACHMENT 1

[' .., TO

~ PIIILADELPIIIA ELECTRIC CO!!PANY'S-

-- , RESPONSE TO GENERIC LETTER 84-24 PERTAINING TO y -

W PEACII BOTTOM ATOMIC POWER STATION a

' UNITS 2 AND 3 3

>  ; , g. DOCKET NOS.1-50-277.AND.50-278

,3.m

_ REQUEST FOR AN ' EXEMPTION TO - TIIE

~

., 10 CFR 450.49' SCIIEDULE REdARDING ENVIRONMENTAL'-QUALIFICATION OFI ELECTRIC

~ ;U '

EQUIPMENTE IMPORTANT-TO SAFETY FOR-PEACII - BOTTOM- ATOMIC - POWER -STATION - UNIT -' 2 2  ; ,

,.4 . -

2 - s ,_

P'--

-- , t FEBRUARY:1985i 4

, g- \ A e- K.,

5 c:, f

. :- - s 4 E $ d

_'d _ y ,.

. ~ <

p ,d 4 ,g -

-0 ,

iQ y

- ; n-

t. . e s T 4

",[..

l] 1 q ,j., ',4. ,p ':[ ( ;;; ,

s> r .-

+. -  ?

6 P

. PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM-ATOMIC POWER STATION UNITS 2 & 3 DOCKET NOS. 50-277 & 50-278 ATTACHMENT 1

. EXEMPTION REQUEST - PEACH BOTTOM UNIT _2 Although most1offthe. Peach Bottom Unit 2 Environmental Qualification modifications are expected to be completed in accordance:with the , schedule provisions of Section 50.49(g),

Lequipment delivery,may_ adversely impact the completion of certain

' Environmental Qualification modifications to the extent that the

~

1 Unit 2. modifications will not be completed before March 31, 1985.

'In addition, modifications currently being performed to Unit 2 may not.be preoperationally tested before the end of Unit 2 refueling outage, which.may extend beyond March 31, 1985.

Therefore, Philadelphia Electric Company requests, pursuant to uthelexemptioniprovisions _ of 10 CFR 50.49 (g) , an exemption until

. November 30, 1985, to the implementation schedule of.10 CFR

50. 49 (g) for;the following Peach Bottom Unit 2 Environmental

-Qualification' modifications:

1. Modification: ' Replacement of valve actuators on two

-HPCI valves. These actuators are being replaced in

. order-to eliminate the need for actuator motor brakes.

Reason - for -- Delay: Delivery of the valve actuators, ordered June 1984, is not expected until March 1985.

Any delay in delivery woul'd result in-installation after .

sMarch'31, 1985..

>2. Modification: Replacement of ECCS pump room unit cooler

. selector switch-cams.with stainless. steel" cams.

LReason: for' Delay: Philadelphia Electric Company had

-difficulty in obtaining a vendor to provide-this

component. As a result, stainless steel cams are being fabricated by a vendor who does not have an environmental qualification testing program..'The need

-for= Philadelphia Electric Company to perform its own qualification ~ testing for.this component has delayed

' installation. .The' material was receivedJthe week of

. January 128, 1985, and the' modification.will be. completed

at the end of the Unit 2 refueling outage. -The refueling outage willnbe delayed beyond March 31, 1985.

L3.. LModification:.. Replacement of' safety-related differential pressure' switches used-to start the backup

. fan tin the ; Emergency . Ventilating System - (EVS) for the-

, .ECCS pump. rooms.

ReasonJfor Delay: . Delivery of equipment, which was 1

, ordered--May, 1984,' is now expected by March 31, 1985.

g

' :a . - - ,

y ATTACHMENT 1 Page 2 of 2

4. Modification: Replacement of suppression pool level switches that are part.of.the High Pressure Coolant Injection 1(HPCI) System used to switch HPCI pump suction t

from the condensate storage tank to the suppression pool

'upon.high' suppression-pool water level.

Reason.for. Delay: Preoperational testing for these switches will occur at the end of the Unit 2 refueling

~

outage.- The refueling outage will be delayed beyond March 31, 1985.

- '5..- Modification: Replacement of motor brakes which do not

-have adequate qualification documentation on selected

'O'-listed Limitorque valve actuator motors.

8 Reason 1for' Delay: Modification to two of the motor brakestwill be delayed because a new motor for each of

'the two valves will have t'o be purchased to accommodate the new' brakes. . Delivery of the new motor is not expected prior to June 1985.

- 6. 1 Modification: Installation of two (2) new reactor

. pressure indication loops-emergency procedure instrumentation.

Reason /for Delay:' Preoperational testing for these pressure; transmitters will occur at.the end of the Unit

,2 refueling ~ outage. The. refueling outage will be delayedjbeyond March-- 31,.1985.

6 7 .- - JM odification: 'I'nstallation of Acoustic Monitor ~for SRV-position' indication (TMI-Modification).

1 Reason.forLDelay: Preoperational testing for.the Acoustic-Monitors will occur at the end of the Unit 2-g . refueling' outage. The refueling outage will be delayed

'beyond Marche 31,~1985.

8. . ' Modification
Installation of two-suppression pool water temperature indicators-emergency procedure instrumentation.

p '

Reason for. Delay:l Preoperational Testing for'the temperature' elements will occur at the end of the Unit 2 refueling outage. The refueling outage will be delayed

.beyond March 31, 1985.

}

F.

p

_1 _ .. _

'b' _ m

(-

v m e-

~

y;..

gr;6, e .

y:, .n g.. 7.- ..

% s g- ,- / _'.j f.h ' '

  • ATTACIIMENT 2

+ n!

TO

PIIILADELPHIA ELECTRIC COMPANY'S

^ , .- -

_ ^ RESPONSE TO GENERIC LETTER 84-24 w - - ,

~

s PERTAINING TO-I,  ! PEICll' BOTTOM ATOMIC POWER STATION

?

. IUNITS 2'AND 3

._ o -

DOCKETLNOS. 50-277 AND 50-278 m

, _ REQUEST-FOR AN EXEMPTION TO TIIE 10 CFR

9

(' <

- 50.49 SCIIEDULE' REGARDING ENVIRONMENTAL

,'~ p. -

s

. QUALIFICATION-OF-ELECTRIC EQUIPMENT

- D IMPORTANT : TO SAFETY - FOR PEACII ~ BOTTOM s . . , . .

- - 4 ATOMIC POWER STATION - UNIT 3 ..

b:

y p _

O -

, ' FEBRUARY 1985'.-

' .;; ._t -

t-v ' (o .. k ;

O 7 yy't- . , ,

,ty 1

-: r

. s ,

> P- t

_f' _ li y f g-- r - .

,3 <

jfi:. -; - - *

g ..

h

&ll s *

fp ,

+

+

m ,

. !i -

rm .

L'~~

7

's j ,

i I

I i-

' p. t . \ ,

.s.

5 t- c i'F g g L p a e q g_ . , ,

' ,, :_.__:- ) .I .

3 _,

.z s

Ey m
; < g : _

y1H'

$.r t ..

' b .,

r? ,

^ '

2 - ;PHILADELHIA ELECTRIC COMPANY

/ PEACH BOTTOM ATOMIC POWER STATION y7 +

UNITS 2'AND 3

,? .,. , DOCKET NOS. 50-277 AND 50-278 W s ATTACHMENT 2

, a ;, -

.~ EXEMPTION' REQUEST - PEACH BOTTOM UNIT 3 e ,

+

. . . ~ .

  • - ~;Although:most of?the: Peach Bottom Unit 3 Environmental SQualification" modifications.were expected to be completed in "Laccordancelwith :the schedule provisions of Section .50.49 (g) , a

~

s, - delay inttherstartlof the' Unit 3 refueling outage now precludes

+

i. implementation prior-to March 31, 1985. - This delay resulted from .

Ma;1owerjthan.~ expected capacity factor experienced during the

. - currentJUnit'?3: operating. cycle. -Although our previous schedules

-ihad' anticipated'the: refueling outage to be completed prior to i fMarcht31,51985,:it nowfappears that the refueling outage will not LbeginLbefore1 March ~31, 1985,- thereby impacting the scheduled

< outage: modification; work to.certain equipment. Therefore, g ,7 g Philadelphia Electric' Company requests,' pursuant to the exemption

^

provisions Eofi10 CFR;50.49 (g) , . an , exemption until November 30, M~  : 1985,5tof thel;1mplementation schedule of 10 CFR 50.49.(g) for the followingEPeach Bottom-Unit.3 Environmental-Qualification R aodifications.>

L o.~ i l '. . #

Modification: . Replacement of valve-actuators on two

'* o' ~

'?HPCILyalves. . These actuators-are being replaced in order toDeliminate the-need for actuator: motor brakes.

we +

'Rea' son Jfor[ Delay s n Delivery .off tihe valve factuators

,% / 4 7 -; ordered June,1984, Lis not) expected until March 1985. .

Jl~ VLAnyTdelayLin delivery wouldl result-in Installation-after

" ' ~

(March,31,-1985.v In addition ~, the: valves'will not.become' -

/ s av'allable forcthisiwork until Unit'3"is shut'down'for ~

,  : refueling.V .

g s 1

,
2.c JModification:4 Replacementfof ECCS pump,roomLunit cooler ~

.y selector.switchicams:with stainless steel cams.

, x o

. lReasonifor[ Delays"fPhiladelphia ElectrictCompany ha'd:

cr jk , "difficultylinl obtaining'afve'ndor toLprovide.;this-

~Okcomponent.1AsLa' result,-stainless.steelcams'are'being. ,

~

m

, Hfabricated.byLaivendor"who'does notlhave'an.

, environmentaliqualific'ation testing program..'The'need:

,D A s ~, . for: Philadelphia Electric Company:to'performiits own

/ qualification ltestingLfor!thisIcomponet~has' delayed.

3..

installation. .The material"was received >the week.of-

~

1

^'

' LJanuary .28,11985. DThe modification will,be completed by.

(m '* " jthetend of the next' refueling _. outage.whichzis not g .

4

, . scheduled-to start until'after: March .31, 1985.

M

,', s .j y y h - , - . i'.O + s - W,' ' ' J

tr~ s,. ATTACIIMEMT 2 p ,. Page 2 of 2 3.- Modification: Replacement of safety-related T- . differential pressure switches used to start the backup

                                            . fan in'the Emergency Ventilating System (EVS) for the
                                           .ECCS pump rooms.

Reason.for' Delay: Work is outage related and the next refuel outage will not start until after March 31, 1985. (Delivery of equipment, ordered May 1984, is now expected

                                           -by. March 31, 1985.
4. . Modi t'ication : Replacement of motor brakes which do not have' adequate qualification documentation on selected
                                             'Q'-listed Limitorque valve actuator motors.
                                           ' Reason for-Delay:     This. modification is outage related and the refueling outage is not scheduled to start until after March 31, 1985.

5 5'. Modification: Installation of two (2) new reactor pressure indication-loops-emergency procedure

         >                                  instrumentation.
                                           . Reason.for. Delay: ' This modification is outage related and the refueling outage ~is not. scheduled to start until
                                           ~after March ^31, 1985.

3

                                                              . ).

h s 4 r e b', s e 4 k 5 x

  '6
                                  'h.             s !
                                                #'~

Q ,

g -; 4 l

             ~

q N 4 ATTAC!DiENT 3 TO , s C PIIILADELPIIIA ELECTRIC COMPANY'S RESPONSE TO GENERIC LETTER 84-24

                                  ^
                                                                                     ~

PERTAINING TO e.

                                                         . PEACII DOTTOM ATOMIC . POWER STATION
                                                                        ' UNITS 2,AND 3
                                                            ' DOCKET NOS. 50-277 AND 50-278
                                                      ,JUSTIFICATIONiFOR CONTINUED OPERATION PERTAINING TO ENVIRONMENTAL QUALIFICATION OF, EQUIP!!ENT IMPORTANT TO SAFETY s

FEBRUARY 1985 ~

                                      *tr..
                                                ^
                                                                                                  .[

44 I

           )         A                                                                                      ,   y 5:;             ,         -                                                                             C 4         ,-:- -'i;.

a4 'u .

y

                             '~
                                                                       - PIIILADELPII A ; ELECTRIC 1 COMPANY
                                                                     -PEACII BOTTOM ATOMIC POWER STATION
                                  ,                                                       . UNITS 2 & 3,
  , .                                                                            DOCKETS 50-277 & 50-278 ATTACIIMENT 3 a .-                                      Justification for Continued Operation
        ! Equipment.                                         '

MO-10-13A,D,C,D) 10-154A,B) Group 1 14-llA,B) 23-20 MO-10-34A,D ) Group 2 14-26A,B ) 1 MO-10-25A,B ) M 10-31A,D ) 14-12A,B ) Group 3 23-19

      !S5fdty Function:
                   ~

Group 1 - passive essential Group 2 - normally closed and passive

                                                                                                             .escential unless a surveil-
lance test.is in-progress coincident:with a LOCA.

Group 3 - essential active IQudlification-Deficiency , "' - Lack.ofLmaterial. traceability for' drive.- motor brakes only. (Deficiency 2 E' valuation: ALreview of operability. requirements-

                                                                             .                  Jfor the J Group 1 and;2 valves reveals =

UP M,' sthat L they are7normally in~their frequiredyposition~for-safety system functionDand would nottbe. required 4 43 to change l position'for response to a y safety system; initiation' signal. The Group'3 valves'Lare 'normally

                                    ..                              &                          ' closed and)would be required : to .open -
                                    *                                                         -post 1LOCA;Lhowever,1they are. located
                                                                                                'outside primary containment, Hand
                                                                                                    ~

based on a'3-hour time 11agLbetween-

~
            ~

4 ~ inside cand outsi'de' cont'a'inment, they rwo'uld 'experienceEno adverse-

                                                                               '^

temperature or humidity:during:the fpe r iod hin ..which stheir; oper a t ion

                                                                                               .mighta be r roquired . :

un

                                                                                         ~,   O The?l0-25A,B. valves would,be
                                                                                               . required to i open L post-IIELB; 0 however ,

both' valves'would not be1 subjected'

                                       ' W_ ) ;                            ,
                                                                                                           ~

itosthe-immediate effects of the.same

                                                         .w .
       ~"                                          ,                                          ~ lIELD and.thereforefthelpotential for
                                                                                            ~

common' mode failure of these valves-j) ^. pRhp n a. m- -

                                                                                                                                                                                                              -                - - --                   .~               -~                           ,oe m                       m               co.z-n,; + , ^ ~                    .p
                                                                                                                                                                                                                                                                                          ~

Y* r f;

                                                                                                "                                      ~
                                                                                                                                                                                              ?

QQ** y f s s ~.m .m -w . f ' p< & . ATTACIIMENT 3

                                    '                      '                                               '                                                       'r                                                                                                                                                         '

i ;w , q Page 2 of 6 y ,, .o - W' , .. iM ' 1 W. does not exist. Furthermore, discussions with the manufacturer vi ' a indicate that typical actuator drive

      ; y                                      4~                      -

j . motor stall torque is approximately .

        ,                                     L."                                                          -
                                                                                                                                                                    ,                            4 times greater than the static my ~"

Tbrake torque-capability; therefore, - -

'it-can be concluded and demonstrated
  • g' r by field experience that the motit?

V' W ~ can-position the. actuator regardless .

  -t e? ~ ,~ '
                                                                                ~

of brake failure. i I, _4

                      =
                     .,,6                      3t     s W Equipment:                                                                                                                                                                                                                                                                                           <V
                                                                        '+                                                                                                                  .LS 91A,B JRMii__m                                                                                                                                                                                       .

jS^.foty[ Function:~ H,- Automatically transfers. IIPCI suction 0 - 4 .

                                                                                                                     , -                                                                        from CST-to torus on.high torus d-                       ,a, x~y ,                                 ..                                              ,

water level. kQubifi$aElon1Ddficiency:1 RadiationLqualification test. ' d

          ,.t-         -.yu               : "                      .                      2 - ,

(Defi;ciencyjEvaluation: . ~ .The radiation dosage level is below

                ;, gy -                                                                                        30                                                                               the threshold value for most'                                                                                              ^
  -        i - '
                                                                                                                            #                                                                  materials; the probability of a d , AE                                                      -                        - -              " ' "                                     *
                                                                                                                                                      -                                          failure! caused'by. radiation is e

b C? w: . 11nsignificant. .- 9 o '

     - u                                n_                                                                                #r 1 N 3692,N 3693,N3772,N 3773 ;N 3783,N 3784,-

QEqui pment: ' ' d ~ l' /m, ,

                                                                                                                                                                                          'N3884,N3885,N3994,N3995 (GE-CR-2940 2 E                 /
                                                 - 9:: _.                                                                 .

Position 1 Select'or.- Control Switch)-

                                                                                                                                                                                                                                                                          .y 1? .
       ,~.,c <r
                                                                                                ,                                                           v.                                                                                                                ,

2bSOfotyJFunction:}

                                                                                                  ~
                                                                                                                                   -                                                      ; Maintain:areatcoolers control gn                                                            '

fcircuit? ' continuity posttaccident - p'

                                                                                                                                                                                                                                                                                               ^

g4 ,W,y y , y. timeirequ.iredfis:consistentiwith . gm fassociated ECCS systemLperformancen ,_

( a cq .
                                                                                                                                                          -                               frequirements. .                                                                      e
                                                                                                                                                                                                                                                                                                   .,n:

y - , ddddificationiDeficiency:[_ ~ (Testfdocumentation radiationi level ' $WH-M +

                                                  . ,                                      4                   s -                                                  ,                            toolloW.'
^ lC. Jnj -l %
                                                                                                                                                                                           ..          l. ~           .l       .t .        -   ..     .
                                                                                                                                                                                                                                                             . :-                                              y TAl temporary modification has' been
                                                                                                                                                                 ~

TDeficiency Evaluati.on:: g,my ,~ - f.completedftoiensure that theicontrol - e , ' *. -  ::stationstwill:notEfailtin ?such a7way; g , @jA Mm C,-~ ~ 19 m -A ias to? disable the areaGeoolers. oThe ;M . ,

                                                                              . 'j f                                             *
                                                                                                      <                                                                                 ,Econtactsarequired for"oparation;of' gt                    ; _-          '4 y'                                                       s                  ^ the ? switchl unders posth LCCdh                                                                            .

M4 y _,' - c, ' q i cond i t ionsi.w i ll^ no tit ep5(tyt he a r e a r

%A                                            -i                          -
                                                                                                               ,V                    '

_tcoolerssinoperable'.. Also,Jthe- . > -

                                                                                                                                                        ' ' ~

9%h, 87s :contactsiwhich: are iused :to manually-; . p M,y; ggg - l l- P ^ ?initiateh ope nioniof /the?IIPCI, ' RCIC 'h w 1 M' u 4"s ' cand3 Core .t n . area coolers for5 survei1 %: ( esting?during normal. y& ,"g[, 7' *., 4 '

                                                                                                     *.f 1                          '

Y plant y.;C .n have been eremoved:to-t , 45 J$.g , '

                                                                                                    ;1,                                               .'                             ,     tavoidDtae pv eibilityfo'f the                                                                                              '

ing, . W 4 3, - y  ?, . operation?of'all coolers /in/the. jdM M W~+ . .* -DN  : event)of"alswitch'failhe'. m ~ w p ,, g , 7

                                                                                                                                                                                                 ,n _ JQ R i gM$ ' \d.Ff h ' "                                                                                   5 w vsg s                                                                                                                                                                               y g' q.                                       my

$q j*hM%p'e'l]. ., ]' Y Pdi # -k -6S , ' ,9 ,  ; ,_

                                                                                                                                                                                                        ',.'.                                              " i,
                              ,f,                                                      n        '
                                                                                                                                       ;             g%                     ,
                                                                                                                                                                                                                                        ,'Q, d, NMessW                                                     % -                                                 "..r3                  ' {;6                                          4i             ,Z     '"
                                                                                                                                                                                                                                                                    ,lt                                         ,
                                                                                                                                                                                                                  ~ ~ -                --~ ~                   ~ '       -              -

gqw W+ ~~L MTr~

a. ; "c f , GV':

n y ~ 9;m9 ?NW:. , ,G F '.

    $fh!W                     .

nf w, 'p;: j g '

                                                                                                                                                '                                                                                   ATTACHMENT 3
t. Q Af. , ~ Page 3 of 6 mm , - . s f .- , p mN i

l- '; NM , ,; ' lLe

                                                                                                 ^
                         .J'                                                                                                            r                            Operation of all area coolers cannot if ' '                                                ' '                                                                           '

be supported by the ESW System. y:n s - ,- This temporary rewire guarantees f *Wb "g , .:  :;N' ' that the area coolers will operate g; y ~' as required post LOCA. x+

       .n,           w, w . -               .

ikEquipmentt)' DPS-20400-03,04,05,06,07,08,09,10

                                                                                                                                                                     - 11 ~,12 ,13 ,14 ,15 ,16 ,17 ,18 ,19 , 20 .

cO M , ' g %y ( ,3 . (O Snfsty?Functionti- .M. ' Maintain electrical': continuity for

    .p                    9              W
                                                          ^                                         *
area cooler: control circuit post ,

gg, ,c ,

                                                                                                      .                                                              _ accident, passive essential.

mn . M \ f- ~( .- M ' . . [ S [.. . , _ No7 qualification documentation for y .. , QQualificationiDeficiency:

 %J                       7; j ~                                                                                                                                - tthis? equipment has been located.
                                                                                         '                                       ~
 ,: %                 ;y PL Dwyer Differential Pressure Switches
                                                                                                                                                                                                                                                 ~

QfDef iciencyJEvaluation:f i (DPS's) have been environmentally,

                                                                                                                                                                                                     ~

Z1 sM# a Lt ested by Franklin Research Center

$CF yOld                T                                      ,

for-PECo.' TheDawitches functioned' M-' p#( ~

    $%%gdE T ,
                                                                                                                                                                  .successfully through baseline 4

a 9j 'y

       ;MMM                     '     '               ,        $W functionalitesting, thermal aging,.

radiation aging, seismic: testing and fori4.5~ days into the DBA simulation

                                                                                                                                                                                                          ~

w . .f! w Wp59] ' j ~

  • 2*t:)+ *F; ; .which represents a postulated post
                                                                                                                                                                                         ~

p DBA"perlo_diofj13.5-days;- The testh g ypPpAg/g, 7 4Ag%u-y w ..^Y,

                                                                                                                                                                 .switches;were thermally aged for Periods off20Dyears-'andu40 years 63 My M" ?                                                                                            '
                                                                                                                                                                     .before;DBAltestingowhichJadds to the-'                                                                                S A We                                                                                 -

sgM4

Mdm% % % i ^ . +

1 -margineof theiDPS's" installed:ati , _$ MhN Ap - hs)#[; -

                                                                                                               ,4                                       W 4PBAPSLwhichiare onlyE10iyears old.                                                                                             ]

Jgqv%gmwr . "g1,

                                                                                                                                                        ~
ThelDPSCfailure;was such thatlthe
/;1- o*               3                                                                                                                                         upre ssure.n actuated '.diaphragmz became' J^

idi j M;7

                                                                                                                                                                     .increasingry?stif f L dur ing.~ the? test; N
                                                                                                                                                   ~                                                                                                               ~
                                              +'
                         .Jin Land'eventuallyfwould not+ move when                                                         .             ,

d W M." 4 f , pressurized to opensthe micro switch i 1 ' bc b;w. qc

within?theLDPS. No-electricalM-.

w.w c

a. ~
                                                                                                                                                               .$insulati, eon 1 failure:or;;structurait ,'

gg JO n;au,fM- &3

                         %f~                                                  x.                  '
                                                                                                                     -                                 W ifailure; occurred;which~wouldsaffact gpM                      }g&                          g$$(Y      '             /V                                  Z   ,
                                                                                                                                        , W           W    ;the(operation"offsafety-related eguipmentiforgthetentireg31"daysJoff y;                     %                 .
                                                                                                             ,m                         _j'4                                                      .
                                                                                                                                                                                                                                                     ~
                                                                                                                                                            ~ ?th~e DBAfsimulation. TheEDPSis ar'e Oy dlA M=i
                ,h@  "M i ggs3. ,,    '     W           C    69ci                                                                  ,

Lusedtto controlithe' operation of? ~ . . . - . g.

                                                                                                                                                                                                                                                                                  +

9,M _

                                                                                                                                                                   -area:coolersTin;.ECCStrooms.-;The-
#hw&y1:~.y  mE                       ,1o9 s9 > '<                                                                            , ,

O failureLof the?DPS=such1that it Will? ,

                                                                                                                                                                                                                                                                                              ~
     $NM       g w                          M.?a w                                                  -..

not changeistate$does'notiaffectEthe? @ E' m a m ~ ,

                                                                                                                                                                    ; operation /offthe runn,ingearea-J                                                                                     g

$R,%p y a'g(y*16 Q"De y:/-J -

                                                                                                            ~~                                                    -             -
cooler.;,These switchesfare'
                                                                                                                                                                                                                                 >                                           m.

f MENpM, d f +A _ m finstalledsinAthe' discharge)sideTof7

                                                                                                                                      ^

m f

                                                                                                                                                          . O thefarea ncoolerifans1which woulds,                                                                                           1
  1. y$Ca " Gd qwgj, e ' " 4, , ,

M reducefthe'ir; operating? emperature? t .u u AM

                                                                                               ~

jbyJ10Ldegrees.Fiand infaddition,/ai g%q ,

                                                  ,a g -                      t10idegree1F marginLwas-addedito the-                      ~
                                                                                                                                                                                                                                                                                     *4 1, h;i h ,MM #D ' %                                      1   y.;dd6~             _                                                                          igeneral3aiea;postulatedEDBA                                                        -
                                                                                                                                        =

e www . ,h4 s s , _ j.

                 ~

eh h 3 e .

                                                                                                                                                            -U           .

( O gru 4 ,> M , m . 3

                                                                                                                                                                                                                                                                          ,      y-
                                                                                                               ?A                         %                                     [                   ,                                              .                               .

m

g. 7-

^f- '9w-.

                                                                ~           ~
                                                                                        ^
    "p'
                                                                                 >                                                                                                ATTACHMENT 3 Page 4 of 6
  ;jk                  - -

3 temperature resulting in a DBA test

                                                                                         -                                                        temperature margin of +20 degrees F.

Failure 1of the DPS could affect the

    '2 capability of the backup area cooler le                                                                                        from automatically initiating on the k,~                               '

loss of the running cooler. . wv

                                                                ,wf                    -                                                          The RHR system (LPCI Model) has four
                                                                                                                                                -pump / motors located in four w

different rooms with two' area U - g~ . coolers /RHR room. The failure mode

     ,       ~c
                   -                                                          .                                                                 .of the DPS-is.such that it will not
                ' s# ~                                                                                                                          . change state after 13.5 days post DBA and initiate operation ofsthe J3-                                                    <                                                          . backup area cooler for the RHR

,1 , u - pump / motor. Tho' existence of.the backup area coolers isynot required. to.meetmsystem requirements or the

                                                                                                                                                .singleEfailure" criteria; as
     - ~
                                                                                                                                                 . redundant RHR equipment can meet the E

gg

                                                                                                                                                . cooling requirements resulting from
     < ~
           ~

za DBA. " Dased on the results ofuthe FRC

                 ~             '

test, the RHR area coolers will

   .. y.,
                                                                                                                                                ? start atithe onset of an accident'
                                                                                                                                                ~and c'ycle between the lead fan and-backup; fan (if required ldue to > loss               a OE                                                                     S                        -                                          o'f lead ' f an) for 13.~ 5 ' days. Ten
                                   "'.                                                                                                          ; minutes 1after-the~ start of the DBA,
                                                                                                                                   ;4-            only twoLRHR pumps are required to effect ?an' emergency shutdown, (re f.-
                       %.                                                                                                                         Table -. 8. 5.2a PBAPS - FSAR)'.. - If . the:
   -                   9'                                                                                                                       =DPS?cifailedil3.5fdays after the'                ..
   .n                                                                  -0?                                                                        beginning of a LOCA;and the. backup .
        ~

s .arealcoolertdidenot~ start, tan-4iC '6 -increase?incroom' temperature would.

                                                                                                                                                 -beLindicated-in the control-room and-

_+10 j 14 - 'the operator would!take appropriate

               ~4
                                                         ~-

caction~torstart'the: redundant-E,m - Mequipmenteinfoneiof the other?3-RHR-

                           ,               -4                                              -

rooms. LOperation?o!! the%RUR L y TV 6 - ,

                                                                                                                                ,               : pump / motor 5 initiates operationi of
   ]& >

the: area 1 coolers.with the DPS'in-the -1 closed ' pos.ition . EThe1DPS is? normallyfin the closed po'sition 1' ] ' during system: shutdown:and doesanot. g, have-:to changeistateEto initiate operation ofLthe-area' coolers;1 i , 45 on , y there fore , it'will porform~1ts--

                                                                                                        ~

, . f , + s

                                                                      '%>:n                                                           u          :sa fe ty - func. tion..

i , -

                      , -                                   '                                             ,A                                    ,Basedron-theLfailure mode of-the 04 "*                                       '
                                                      ' re                                                        '
                                                                                                                        ~
                                                                                                                                                  'DPS,.the fact thatithe DPS does not                ,

t5 o a

                                                                                                           ?' f Maa                                                                                                        --5,,,,
                                 ~

{ a,

                        ~
                                                              =

[E Q. 3 . ATTACHMENT 3 y Page 5 of 6 "A E > / . have to change state to initiate operation of.the area coolers and l' -the RIIR pump / motors are redundant, PECo concludes that PBAPS can continue to operate without undue

                    ~
risk to. public health and safety.

[ Equipment: , PT-6-105

SSfdtyLFunction: . "

Provide reactor-pressure indication for operator information.

      -       LQualification Deficiency:                                                             Post-accident operability time of g

101~ days as opposed to existing qualified post-accident operability n time of 7 hours.

                                                                                                   . Pressure Transmitter PT-6-105 is
                                                                                 ~
          'f De ficiencyh Eval'uation : -
                                                   '                                                  located in room 403 andiproviden reactor pressure indication for operator.information. PT-2                    f-                                                                                  55A,B,C,D are also located in' room e

403,' provide indication for operator

                               -                              a<                                      information, and are environmentally 3                                           qualified. In addition to PT-6-105, p

a new transmitter will be. installed

                           ,                                                                                      ~

7 ,

                                                                                                     .to,' enhance the present leve1~of-qualification. _The new pressure 9                                              transmitters will'. have a post-f-                                    ,

accident operability, time of one Z- year as opposed to a 7-hour post-accident' operability time for the.

                                                               ^

redundant instrumentsLPT-2 l 55A,B ,C,D. - Pressure. Transmitters

          '                                                                                          .PT-2-3-55A,B,C,D are qualified'to              r temperature, pressure andiradiation'
                                                                                                                                ~
   ?             '

levelsiin'excessJof-the postulated DBA. conditions. ? Based on the foregoing, it can'bc concluded that jc 3 , information will-be available forL

   " C ?"                                                                                             the operator to take the proper-      ..
                                                          -          ,         ,                      actioneasjrequired by1the : emergency procedures.-                                 '

}. , DEquipment:- - :TE-24 4 2A ,B TE-3442A,D:

         * ;i Sf fetyg' 7' 'unction':*                                                                Provide l suppression pool water

_ temperature indication for-operator information.- l f :. - ' fQualification:: Deficiency: s lNo1EQ documentation-available. (Defih[encyLEval'ation: u Temperature Elements TE-2442A,B and

                                                                                                     'TE-3442A,B.aro11ocated in-the torus 4

- 1, k

  • 1 J t e-

_. . - - - . 7,

( P;g ~ ATTA01D1ENT 3 Page 6 of 6 c ~ p, - and provide suppression pool water temperature indication for operator information. The only non-metallic

                          ~

c materials in the temperature elements, as' documented by a

                                                                                                                                   - telephone conversation with Decher
               ' '                                                                                                                   Instrument Company, are the neoprenc
                          /_                                                                                                       - connection head-cover gasket and the
  • ceramic < terminal block.in-the connection head. Based on a review U- of these materials-as listed in m.

EPRI-NP-2129 Report and Standard IIandbook for Electrical Engineers, it is concluded that neoprene and 1 - ceramics can withstand radiation levels in excess of 1 11R and are not

                                                           -                                                                         adversely affected by.the postulated
 ,                  1 high temperature operation. Based on:the foregoing, it can.be

( concluded that information will be e t

                                     -                                                                                               available for'the operator to take p
                                                                         -                                                           proper. action as required by the f(

s - emergency. procedures. p--= 3 l %- # 5 a  ? e '" ' . r er

                           -Y    ,
                                                                                 'd(l                                                     .*
                             .: 3_
 .fix                                                                                      ,.,j -

p.7 1 i ,

                                                                                      '4V                                                       ..
                ,   ,. / :              7
                  '        '#                                                                                                          ~

Fii % f , ( , V4 '

                                                                                                                  /4 -

4., .',..-. c

  • u  ;

m S n . l :l, !9- ! '

                              ~
ti ,

i Q._ _{. x !_ L , r_--

vy -,=--

                         -s,, tn -                                                              ,

FM . , . m ..

                                         ,  _c           <
                  ..t :;.                             2                                           a b           , . _ . ,                                                                                               e E'

d 'p 4 y - 2,,

        .w       ..
                                                   - s-
                                                                                                                                  ~

e ' - E s u  : ' m

         %I 3
    .i,               (

M%i

                                                                   ~
                                                                                                                                                                                                                                      - ATTACHMENT 4 s-4' 0
                      ~,<-,._                                                                      ,

TO t.' ' m 1 PHILADELPHIA ELECTRIC COMPANY'S!

                                                                                                 -1~
                                                                                                                                                                                         ~ RESPONSE!TO GENERIC LETTER 84-24'..
                                                                                                                                                                ~
 .?~' --:                                      .
                                                         +
                                                                   . es           w                            w m _                                                   y - . , ,;                                                                                          ,
                                                                                                                                                                                                                                      .- PERTAINING TO p                                                    . . -
                                                                          .      ^R               ...                    . . ,
                                                                                                                                                                                       .; PEACH BOTTOM 1 ATOMIC POWER STATION
UNITS 2.E 3 m + ~
            .m
                                                                                                                                                            ^-                                       -DOCKET NOS.J50-277.-AND'50-278
                        %v -                                                        -

n, n p' - . o, w'

  • RESPONSES-TO-NRC'IE BULLETINSi
                                                           ~

i

                       % s           *a,

_ w-- = . . _Y 4 . , , q g' k cAND INFORMATION' NOTICES.

                                                                                                                             -                            . :, p                                  .
                                                                                                                              ~

e L 4 . 3 1, yot g y q~ ,

                                                                                                                                              ~
                                                                                                                                                              ~
                                                                                                                                                                                                         .THAT IDENTIFY ENVIRONMENTAL ~.                                                                                           ..m
e. .
                                                                                                                                                                                    +
                                                                                                                                                                                                                          .               .                                     ~
                                                                     . [,
                                                                                                                                                                                             =-QUALIFICATION: PROBLEMS RELEVANT'
      ~                       ,

s

                        ' lf -                                                                                                                                            _..
                             X,                                                                                                                                          ;TO PEACH: BOTTOM ATOMIC POWER STATION k '

VV + g q j;y-: - ' ,

                                                                                         --s                                                                                                                                                                                                                         x N

cp 3. 48  : FEBRUARY.1985

                                                                                                                                                                                                                       )

1 1/ .I . s

                          .- t y'                                  x                                                                                                                                 ,                                                                       ,,

, lr '; * > s.~ c I i {. . .4 (A~ '

        'fh'I'                         4                    1
                                                                                                                                                                       .        yg                                                                                *
a r
                                                        ~
                                                                                                                                                                       ' ' f:

w , .

                 ;fh                                               3--              y   ,,(                                                                                                                , *
                                   ,a                            . f.:;- . .f q                                                       l
                         .c          ,                               ',
                                 ^
                      ~'g"                                                                                                               4-                                                       $-
                                                                                                                                                                                                                                                                                                       }

- ,g .,;-y-} f ~ 1 <

                           - , '                                                                                                                s3 .

1 4 h5 i,g{.' , q>..'f f=; I + P. A 1

                                                                                                                                                  '7      e .
                                                                                                                                                                                                                                        ~
 - s
 ,                                                                                                                                   /                                                    _

.w- * ,

                                                                                     ~.y                 .

j' ,1 -Q:: , , w : , #

                                                                                                                     ,,.-c b
    .                                    1'        e-"        ' _                                                                                                                                                                   _
                                                                       >                                           x                               .                                                                   ,
                                                                                                                                                                                                                                                                                     +
                                                                             .p                             ,                                         t
                                                                                                                                                                                         .o--                 t                                     -

Y 4

       -3
                                                          ,7; : +

J d $*> - PIIILADELPIIIA ELECTRIC COMPANY iPEACH< BOTTOM ATOMIC POWER STATION

                                           .                                                                                        . UNITS 2 & 3
                                                                                                                          -DOCKET NOS. 50-277 & 278
                                             ~

i 9; ii ATTACIIMENT 4 -

                                                                                                    ^
RESPONSES =TO NRC IE BULLETINS AND
                                                                                                                              - INFORMATION NOTICES
       ~ '                                                   '

EIE Bulletin 82-04

                                                        ~
                                                  ~
                ^'

Defi biencie's-in Bunker Ramo. Primary Containment Electrical Penetration

        ;:<                           ; Assemblies:'-

c .

                                                                                                                          ~
                                                      ~

I5unkerfRamo Primary Containment-Electrical Penetration

                                                                 *              ' Assemblies:are not'used at'PBAPS; therefore, IE-Bulletin 82-
                                                                                 -'0411s:not applicable.                                                           .1 HIE-IN 821 11~                                                      --<                                 -

y iPo'tential InaccuraciesE:in: Wide lRangeEPressure Instruments used in-J]~p\WestinghouseiesignediPlants. D y?t ,

                                                                                                                              .                                  +

W' lResponseito-IE-INJ82-11 iPBAPS Unitsi 2 andt3:are not Westinghouse designed plants; M < therefore,-IN!82-11 is notiapplicable. 5 -~IE- IN 8 2-52e

                                                                                                                   ^
     +
                              ~       _(                                                                                              _                   _ _

-G.  ;  : Equipment [EdvinonmentaliQualificat' ion Testing Experience--JUpdating .of.- ~ g j: Test-l Summarie's)Previously J Published in :IE-IN : 81-29; Equipment'-

                        +

Environmental { Qualification: Notices : (EEQN ili thru . ll) : Response to IE-IN1825 52 EEQN-l:{ Limitorque^ Valve Operators:- 6. 3 ' Limit'drque Qua'lif'icStibn$Reportsion-file-at PECo satisfylthe-e - s

Specifie_d.EnvironmentalJQualification' Parameters forLPBAPS Units 2-W
                                         -                    liand '; 3.1    -

s; .,. t + W u y 2

                                                                        .g,.:

h:h.E- - + w .

m %37 q g m . id ~<# ^ p, j4 o #;: . . 3

  . . ' -,@T                                 , en       w-                                                                                                                                                                                                   ATTACHMENT 4 u                        .

P 1'e J' m Page 2 of 7 l g .

s. -- %

m . [ w f(( Response to IE-IN-82-52 EEQN ITT Barton Transmitters: *

                                                                                             ~
                                                                                                                                                                                                                                                                                  ^
             -M','                                            2Bart'on transmitters-installed in Class lE applications at PBAPS Iareblocated in-~ secondary containment and are qualified by Barton                                                                                                                                              l
                                                               ;reportSR3-7_64-9.c:Barton Transmitters identified in EEQN-2.were                                                                                                                                                  ;

O 7' > t ~ " testeditollevels<which~ exceed PBAPS Environmental conditions for

bothiPrimaryl Containment and Secondary-Containment.

x . : LResponse to'IE-IN'82-52 EEQN D. G. O'Brien Electrical

             ,                   [

c e,

                                                        . _ E Penetrations: -                                                                                                                                                                                                     '

y - .. 7 p ag g,foeBrien Electrical Penetrations are.-not installed at PBAPS ~ y _ .m , . LUnits?2 and : 3;; therefore, EEQN-3 -is not applicable.

     ,           ,  9,                                                         ;._
%       ,'                          [ t' p..

LResponse to~IE-IN 82-52 EEQN-4, 5, & 6 - Dresser: Safety Valves:

                                    ~~ h/!DresserLSafety Valves areinot :i'nstalled_ at PBAPS Units 2 and 3;
         ] qy ~' ! therefore ! EEQN--4, 5 ~ and 6L are 'not applicable.
             .- x :                                                                      ;
             ~hy                     _             >           [ Response?toLIE-IN:82-52:EEQN 7 - Target-Rock (PORV '.s ) Model.80X-17                                          :006-13:,

7 o s . ~ 4 ITarget? Rock ! Pow'er f0perated Relief Valves (PORV)<Model; 80X-006-1 ~ A I_ larecnotinstalled;atLPBpPS'UnitsJ2 - Land 3;therefore,EEQN-7;isnot - E , ; z7

                                                                         ~

iapplicable.7 ud + , so '

                                                                                                                  .r, q'; >                                                                                          . .                        . - -
                                                     * ; Responses to IE-IN'82-52 EEQN-8 *l Control-Component' Incorporated
  >Lt                                                                                                                                                                                                                               ' '                        ~ '

M

                                          .          ; f(PORV) :                                                                  ,
                      %:2 i l.                                                                          !..

an.' Control ~: Component'. Incorporated Power 50perated% Relief. Valves p,- ,,  :(PORV's) Vare 'notlinstalled datH PBAPS / Units ' 2-'andf 3;: therefore ~, EEQN. yg ,, ' ,_ ;m8bi, sL not applicable t <

                                                      ,                                                                                     m                                                                  _

n; . ._ e . - c , . N Crosby Safety'LValve73K6::

                                                                               ~
Response?to 'IE-IN /82-52 EEQN-91 w

n- _ . , ,

                     -. _ ~                             ag                 ,

_ . , ._ ,. .. " i , gC .. W.SkCrosbyfSafety; Valves 3K6:are; not3installedMat 'PBAPS: Units 2 and)3;1 ' >< P itherefore: EEQNJ9'isj.not(applicable.: 1, - - 4 3 ,

                                              . _ A,dv[
                                  'ri Rhsponse t'oiIE-I'N 82-52 EEQN'-10J-'ASCO SV's:NP-1. Series:

r .

i s

m'

                        .y , ; y ',_ .                                 , f~                                 a ' n '~
                                                                      $ b r .. ,

y

        ',       g
                                                 '                                          q
                                                        'jPBAPSIUnits'2fandE3-[ASCO SV's.are'NP-8300 series, which.are not1
                                                              ; the3 subject ofjIE-IN . 82 EEQN-10;f therefore , :EEQN-10"is : not L 3

33 h n. applicable. , 4,-  ; s+ "

                                                                                                                                                                                                                                                                         ~

y b ,

  ',            r                     2      ,
                                                                     '1                                                                           ,                   ,                                                                                                  ,

k Y  ; m

                   ,            ,                                                            .._t,
  .                                    s L _.- -                                 ___.______,_:,. ___________,,_______.__l_,,,__
  • bn g .a . s

_ s, - .

           <.9                  ?
          *'                                    .M                            '
                                                                                  ~

ATTACIIMENT 4 3 c

6 '
                                  ,     4             ,

Page 3 of 7 k ' ~

                                    ,            u      II .

s 3%/ ' ' J iResponseito'-IE-IN 82 EEQN-ll - Environmental Tests of Xi '_; l .<;,- ' 1 ;ElectricalxTerminal Blocks, IE-IN 82-03:

                                                              'b', ^

s

  '*%,,.7@,                                                         3See; Response.uto.1IE-IN 84-47 and'IE-IN 84-78.

mi

    ~i                                                               'Respon etto IE-IN1 82-52':EEQN-ll - Potential Inaccuracios in Wide-

^

                                                                     ; range 1PressurecInstruments in. Westinghouse-Designed Plants IE-IN                                              .

y t82-ll:) a- '.H*. l

                                                           ,(PBAPS Units'2 and 3'are not.Wostinghouse designed plants;
                                         + 4               1 7 therefore,'EEQN-llois not applicable'.
 .-            it            

s5 y jIEE IN!83-45" 4 w #. y: ' _;h_ ' 9Environmentdl Qualification' Testing of GE-CR-2940-Position Selector fcontrolDSeitch:- . 1- ,

                                                    ~

iResponse'to'IE-IN 83-45

                                                                                                           ~

t .-

           .                v.                                                         .           .                               ..

g

                                                    " s.

PECo ?isireplacing the failed 'componeta(Delrin Cam) with: a

                                - +

stainless. steel cam.. ' t 7y. - .~ - ,~ 5~ .- TheLJCOiforfthistcontrol?sta. tion'is included on page 2 of' - < - ~ TAttachmentz3. <

    +

y . -- IIE-INc83 172-EEQN-12 thrui24 4 .

                                                                                                                                                                       'i.
                    ,- ?Environmentall:QualificationTTestiExperience, EEQN.12?thru.24sc w,                          -                                       c_
                                  $                                 .,, .                      .)
                                                                                                                     ~

7 ,

                         ^}                                         ! Response tos IE-IN 83-72'EEQN Environmental > Qualification ~'of-JEpoxy Grouts _-.and. Sealers,.IE-IN 83-40:-                                                                                       -

[' 7

                                                                                                                                                                                     ~

A .

                                                                   -Epoxy-Groutsfare~~not:usedlat-PDAPS for anchors 7or seals;'thereforen
                                                                                                                                                                                                    ~

K$ * (EEQN-12 7.ist not :applicab1'e'. -

                                                                   +

Qy ( +i.'~ 4

                                                                   .ItesponseU to IE-IN 83272 EEQN Environmental Qualification g(.*                                                                l Testing.of,GE-CR-29.40,DPosition/ Selector Contr'ollSwitch) IE-IN'83--
                                                                                                                                                                                                        ~
                                                                                                          ^ ~
  .'                                                         }45:                      L
                                                                                           ,      i                                                     s
                                                                                                                                                                                              ~
             } { .' , y                   T                                   .

4 ( [c l m ~ )See?-Response to IE-IN 83-45'.- .g ,~

                                                                                         ~

_ r . . , [g ld% ' o.

s. f ,

3

                                                                           ~
                                                                                                                          ~
                                                                                                                                                            .g,
                                                                                                                                                             ^

q^ ;[ < ~

                                                                              = .)

3 5

g

            $1 - %                                            f                                  .

1 Vit c _l . c , .. ; , D 3;a ' . n ATTACID1ENT 4

  • p'
                                                ~ '                                         v Page 4 of 7
            ,s               . :-i.                     ,
                    ,, .              ,                       4ResponseCto*IE-IN 83-72-EEQN Anaconda Flexible Conduit:
. +

N ,' - KAnacond'ajflexible conduit is installed in primary coatainment at a j' ^ iPBAPS?UnitsL2fand..'3-on Class lE Motor Operated Valves (MOV), Air ~' "

                                                          '[ Operated1 Valves?(AOV), and: Safety Relief Valves (SRV).                                         .

This

                                           @ iequipment?isielectrically connected by an Anaconda flexible 4:                                        %, ]conduitLt,otarjunction box"with drain holes to avoid water            .

g' raccumulationb'The junction box,1which'is not a sealed device,

          '38
                                             ~

icontainaia terminal. block that has been environmentally qualified. m .. .. .

                 .- "' f ~ (The' MOV.'sc and; the, solenoid valves on the AOV's and. SRV's have been
                    ,                   s                        successfully!LOCA. tested to_ envelope PBAPS postulated accident                                                                                        -
                   'T,-                                   Mconditionst "The environmental conditions referenced in EEQN-13 excee'dithe: postulated accident conditions for primary containment W                              _* L atiPBAPS Units :.21and ^.3.

p , he ) (Re'sponse ?toEIE-IN'83-72 EEQN.14,15,16,17',18 &-19-- Rockwell POST--

                                                                                                   ~

l3 :LOCA Hydrogen-Recombiners:-

                             .~

y ,s . < ,4. , , 7 5 '[. i o 1RockwelleInternational? POST-LOCA Hydrogen,Recombiners are not-

                                                          - installedTatiPBAPS' Units:2fand 3;ttherefore,,EEQN-14,15,16,17)1876 s ;;E --
                      ' f ' - ?l9lare notfapplicable.:

W u - . y ~

                                                                                                                                                                                                      ~

T~]  ! Response't'o IE-I'Ni83-72 EEQN-20 -'Barton Electronic, Transmitters:-- 9 ..  % y , , I W, D ' 0BartonLElec'troniciTransmitters Model 763 are not l'n stalled at1 ' g "PBAPSLUnitst2?andE3);therefore, EEQN-20 is.not applicable. . y, a , a > m' ' 3 Response!to":IE-IN 83-72'EEQN Barksdale Pressure Switches-D2T: and-D2H - ' - 2 3p .

 ;p m
  • e
                                                                                                 ~
                                                                                                                                                                                                                         +

4 Q,_ -

  • JBarksdaleepressur'eiswitchesimodelsEB2Tland.D2H'areLnotJinstalled~
                 .                                        J ati PBAPS : Units f 2? and J 3; l there fore , L EEQN-2111s-' not; applicable L                                                                                  ,

y,; - -+ ,' _ . g. ,

    $l' ! ,<                                                  l
                                                                                                                                                 . . ~ ..                              ,-
                                                                                                                                                                         ' Static-O-Ring' Pressure' Switches'SN and + '
                                                                                                                                                                                                                 ~
      ~
                    ,m           ,
                                                           -JResponse'to"IE-!N#83-72.
                                                    - ol2N Series::

r .,( -1 c .

                                                                                       -.-+                                                                                                                         .

N rx> ,e., - - . ' ., '

  '/ de                                  ,               14Model*5NNStatic-O-Ring; Pressure Switches:areiinstalledoat:PBAPS,;

fi' .

                                                           ?were7 tested by? Franklin!Research Centerifct-PEco:and:successfully:

Laeetnalloa_cceptance? criteria.. Modeltl2NLStatic-O-Ring PressureL , I *- i p,_ fg : Switches [arecnotjused.finfClass;lE: applications?at;PBAPS" Units"2:, v.

                    ?'W                                    :andl3.?

kl ' & c.h,> ~

k. r
           ;l . , , '

t s mi' s _ s u

                                                                                                            ^&
 'yx                                                             ,
           * **                                                                        ll y ,

3 P

                                                                                                           .} :.' - -                        7 isp ' w p                                                                                                   ; ,;                                                                                     u              )

m.~. . . . , . - . -, - . - . . - . . . - - . - - ~. - . (lg,%

                                                                    ~

l -; e '; j w (._; , c.; , , . u r u' K :.s . , e. ATTACIIMENT 4 0 1w;g - Page 5 of 7 qq

                                                                                                                              ~                                                                                                                                          .

gi , # -

        ~"y~:                                                                                  ~

24 M:s , "?ResponseStioiIE-IN'83-72 EEQN Barton Transmitters: ' k; f _ m ,  ;,l h - iThe;failureimode reported in EEQN-23 occurred at 320 degrees (7. " - i  ; Fahrenheit.;,The maximum4 temperature the Barton Transmitter-will 2, 7 - ?bejexposed?to at:PBAPS. Units.2 and 3 is 128 degrees Fahrenheit; [,~ <

                             ~ >

_J y"I - -:therefore,1EEQN-23fis not. applicable. i

           ,,$'-                                                                                                                                                                                                                                                         b y!;.                                         ~
                          ', W                                  Response"to IE-INU83-72~EEQN-24                                                                                 Limitorque Valve Operators:
     ,,                                                       c L^N                                           6                ;Limitorq6e4 Val' vet 0perators have been inspected at PBAPS Units 2
                          ~;;                                 jand 30for;: properly-qualifled components and are inspected during w                                     ~ each3 refueling 2o'utage'. ' Terminal-: Blocks are not used in the                                  -
Limitorque " operatorsat-PBAPS.
                                                                                       ,_ / *
                                      , LIE-IN#84-23' -

1 4 $ Y d ::Re'sult's:ofithM N'RCl Sponsored Qualification Methodology Research Test ~ { y on3ASCO'~ Solenoid 1Valvess;

           . ~; , y                                              ,
4. f: . - '  ; , . .
          -                                            ,'?ResponseL tolIE-IN 84-23                                                                                                                                                                                       ;

[

          ~                                                        .                             .,. :,                                                                                                                                                                 ,
x ,, ,, .  ;. -

C N 1The?SV?siat PBAPS!are rebuilt on-a. routine. Environmental-

                                                                            ~

i iQualificAtionJmaintenance schedule. ~Alsoi ASCO SVfs install'ed in: [7 , " -

                                                              '; primary 7 containment 1areUpilot solenoidston AOV'siwhich operate                                                                                                                                      .

Ei '~

                          ,                                     withinc5jseconds" post DBA'and'wouldLnot beLexposed'to(the' extreme                                                               4 environmentalEconditionsDas~reportediin theJFranklinLRessarch
                             -'                               ' Center::.EnvironmentalfQualification ' test.

v , y sic 'LIN-IE84M4 , e JD't-

                                                                                                                                                                                                    ~

s lEnvironnestalpQualification.LTesting'ofJRockbestosTCables

                                      ~a
      ,                y;>;                                                       ;

iResponse:toiIE-INi84-44

                                ~

x y - -

                                                                                                                                                                                                               ,                                                       3 -
    ,.*                                                    ; ?c ,               3          '

t  ; j: 6%l .' u, .,.

                                                                                                                                                       -t
                                                                                                                                                            . , .-              r       - .

JPEcof:hasitwo~ representativesJon the; industry advisory' committee! to G , , fassistbinithe?RockbestosTsupplemental2 qualification (testLprogram M .. k ofor(ClassflE: electrical cable'.E;2Also., Dechtel Corporation:has3 < ff ,  : ^ ;preparedda' generic; test;reportton Rockbestos' cable whichFaddresses - the'- NRCifindings . :

                                                                                                                                                                   'D                                                                                                .-

+ ,

   <,'                                        ' 5,/ _%

r = Y: r , i

                                    ^

k' ' 4 ,. . 3 Y' , i [U r

                                                                   ,                       w                                          .
  • l1 i f{l I

E r  % + ^ ATTACHMENT 4 Page 6 of 7

                            - IE-INI84-47 I         ,             ' Environmental Qualification Tests of. Electrical Terminal Blocks:
                    -                 ResponseIto IE LIN 84-47 Terminal 4 Blocks are not used'in instrument circuits in' primary cont'ainment.           Terminal-blocks used-in secondary containment which are associated with instrumentation-will not be exposed to the extreme. harsh environmental. conditions'as described in IE-IN 84-
                                  ,;4 7.

i

                             'IE-IN - 8 4-57/

L Operating Experience Relatedsto Moisture 1 Intrusion in Safety-Related Electrical Equipmentiat Commercial Power Plants: e

                                  #Nesponse to IE-IN 84-57
                                          ~

w- f Equipment' installed at PBAPS has1 moisture seals installed if.the~ 34 . qualification test r'equires that1 seals be installed. Maintenance

                                   . requirements demand'that equipmentigaskets befreplaced~with new
gaskets whenever disturbed-and~ gasket 7 replacement intervals-Edefined . for . Class lE equipment surveillance and- maintenance .
                 ., .             . activities assurefthat; equipment 11sLin proper operating condition.-

IE-IN i 84-68

                       - Potential': Deficiency l in Improperly Rated : Field - Rate'd Wiring to o

Solenoid Valves:  ; Respon' s e :to IE-INI 84--68 ' A . lPBAPS-has recently installed Valcor SV's with 200 degrees Celsius 9 field-run wire which-exceeds-the possible maximum temperature

                                   .inside 'the ' valve body L(138 degrees Celsius) by 62. degrees Celsius.

e a i 3 l? s - , , . . , . , _ , . . , . , ,

n-g;;

      * -;y:;:%    ,

1 ' '. ATTACIIMENT 4 Page 7 of 7 o IE-IN 8 4 -78 :-

                                                                       ~

Underrated Terminal.Blocits.That May Adversely Affect Operation of Essential. Electrical Equipment: o

                            -                                  Response ' to IE -IN 84-78 :

Beau' Pro' ducts'76000' series. Term'inal Blocks are not installed in

                                                              -;Limitorquel Valve' Operators at PBAPS... Electrical Connections in
                                                             . Limitorque. Valve Operators-are made directly to the torque switch
                                                              'and -limit : switch: and: the : motor ~ leads are spliced directly to the
                                                              < source leads;-;thereforei'IE-IN'84-78 is not applicable.~
                                           , /

{ t

           $% 4,      .              y7,--

b

                                                                                         >i G                      w A.-

l 1 s P sv e A 1 -.- >

                                                                                    ..}.

r 5 N, i

'kA                                        . . .,'                    e-
                                                                                                                                           */

p_ ,

     . ;7                                      w                      .-
+ ,
  , + ,. .                                                                                                                   <

yg:

     . +-                                                                                             . .

a < p - - c

   '                                                                                    =

1m1

                   .3     4r                -
                                               ~..
  ,                 w.,

3 _'#'. , s' y , A I ' -

k. * .

1 a Y ATTACIIMENT' 5

                                                                                                                                                                                                            +

J- t 9 "

                                      ~ '

rr . TO

                                                                                                                                                               ~ PIIILADELPIIIA ELECTRIC COMPANY'S .
                                                                                    -W:

J..y .q .

                                                                                                                                   ,.                      RESPONSE TO' GENERIC LETTER 84-24 m

tw PERTAINING TO:

                                                                                                                                                        - PEACl!-BOTTOM ATOMIC POWER STATION.

UNITS 2fAND 3-

                                                                                                           ,,
  • DOCKET'NOS. 50-277'AND 50-278
                                                                                                               ,                                        ,-      REVISION TO PECO EVALUATION 'FOR 4                                                                                : AUTOMATIC-VALVE' CORPORATION-.
                                                                                                                     '                                                                ~

lfi@. -

                                                                                                                                                                         -l PILOT' SOLENOID' VALVES 4

4 < s

                                                                                                                                                                                 ' FEBRUARY 1985
                                                                                                                                                                   ~

g a$ S ifz b f I#

               . . -s               L f~        -%

5

                                                                                        .{\                 .

l J '. ~ , s , O g f 2 1 -

                                                                                                                                                                                                                  ~

r 1 r ) ' n

                           '                                                                                                                   ~

s _., s I ' / , a_ i j 6  %

 , +                                           r

_ n s . t - , 1

 #                                                - / ,L p)
         -                                                               $                i
                                                                                                                !                                                                   W ikt..
                                                                                              ~

Qy,

en -

         -Ny7 ? 5~7', ,                          ,

Mi ' . J ATTACIIMENT 5 Page 1 of 1

                                                                                                                                    ].
g. ,) E N y ., ; , m

[ >; ,, 2 PECo-Evaluation

         .g                                            , ~                                r
n.

w , J:-FRC VItem" Number :~43,3 44, ~ 4 5" ~ Unit 2 L 1i w l43, 44,345 Unit 3

                               ~.

L~ ' . Y:: ,  !!? rDescriptioniofi' Item:~Pilotcsblenoid valves for steam rel ef 7g g !r ' ;~ ' valves and'MSIV's 7

 <                   ..                                                                                                                    - Automatic Valve Corporation (AVCO)
                     .                                                   4'     &
                                                                                    '_')
                                                                                       +     -                -
                                                                                                                          ~
                                                                     - '                                                                                               ' Summary of TER
 ?                                   r
                       .                                                            ..g
                                      .                                 s             .
                                                -e.                                        -

4 % ' Item:

                                                                                                                ! Unit'                                                     Deficiencies                                                         ,
        .$                                                             <43-                                      L 2 & _3                                                              1
        'y-                                                      1 443                                   0:1 2 s /3'                                                                   1 E45~                         .~
                                                                                                                  '2 sr 3 -                                                            1
l. .% ,
                                                 ,                                  ;                                                                                  a                                                                                 ,

7  : Documented'evidencenof qualification inadequate. '

               !.^                       l Evaluation: j GE ' Le tter . G-IIE-8-198[ transmitted Environmental                                                                                                                                                  *' ..
                                         ' Qualification Test Results and! Procedures'for Automatic Valve!
                                         ! Corporation;SV's-mode 1Enumbers C-5450, and~4988-33-and 34.                                                                                                                                   A-(Technical' Evaluation Report on PBAPS Unit'2' dated ll/80'conductediby 4

M % ",fA.,E.:Finkel<oflthe-lNRC indicates'that-the only.deficle'ncytis aging. J'- 1Th'e: Steam' Relief Valveh are' reconditioned every second refueling .

    ;;,1 1 ; outage.dand{theJPilot: Solenoid Valvesat Peach Bottom are replaced.
                                                                            ~
                 ; s:;every third-refueling outage. 'The=MSIV.'s-at Peach Bottom are -

W reconditio'nedLeveryirefueling' outage., ' g , x (5[ t , _ . . , ., "_ i J Conclusion s Based ion '.:the 'above ~.information',- it'is concluded that' the 9AVC SV' star'e:; environmentally (qualified forJthe postulated' accident iconditions?at-PBAFS.- m - Y - j E

 "k$     ' r/ .

4

                                              ~                      <

3 G% g:; , w, ,

                     ;c,          ..
o-
c
  ,s                                                                                     > .I'                                           .

f

                                                                                                                                        ^

Mjp , jf ~ _11 - m: > x . s .. , _

                                                                                                                                                                                                                           'Rev;. ' 0 ' l/3/84 '

Rev. 1 2/85 V' ,~ 4 4 , f u 9,,

m. L.E >

s j J

                                                                                                                                                                                       ~

ouk ' , x

s: y,

                                                                                                  -=

3 b 4 1

    .a, ra..,                      : m:.a          w s      _6-j :                                                                                                                        s 4-c                          e                                              .
  • 'y *
j. ?A d ',' "--
                                                                                        ,L"
~. y. p;_-                                       >.                                   .
                                          - .-                                                                                  s
         , n                                          <

r a w - y. . w' l- . . m3 '

             ,            w-                                           ...c                         ,                         ,
           + Qf s.                                      ,                 ?

p l

      .)              ,
   ,If'l"                              1                                                                        , . .

N yg _ 'fJ m.

                                                                                                                                                            -                    ATTACIIMENT 6 p-( ,-  _

TO

                                 .                                                                                      t
                                                                                                                                                              'PIIILADELP11IA ELECTRIC COMPANY'S
47 - s

[ RESPONSE TO-GENERIC LETTER 84-24

                                                    ~
             'l~    _

_ PERTAINING TO

                                               ^
                                                                       'M                        '

PEACl! B'OTTOM ATOMIC POWER STATION n , E , UNITS 2'AND 3 e.

                                                                                               <                                    g m                                         -                <

0;s. a: ,

                                                                                                                                                               .: DOCKET NOS. 50- 277 AND 50-278
                                                                                                                                                                                                                     -P . .
REVISION TO TECIINICAL' DISCUSSIONS.
                                                                                                                                                    ~
            <                                                                                                                                                                                                  ~

gj 05

 .,+
                                                                                                                                                      .0F RELIANCE ECCS' COOLER FAN MOTORS
                             . y -( <
                            ..,;                                                       }                                                                             _

Q ,

                                                                                                  ~                                   <                            ,
                                                                                                                                                                          - r :.
                                                                                                                                         %                                   ' FEBRUARY-1985:
           ' ., f J;i                                         s 9                                                                                               y!                                      .

s h t

 ,,p%_
                                                    .'-7a           f

' N,a " Cl' - + > n; ,

                                                                                                                                                                                                                      ,     's c            ,

E'

                                                                                                    - b                                                                             /                  t

{}.. . _ lf; _ , 4 A i

                                                                          .,.3.,
 ~
                                                  ,                                      a
                         '.:is
                                                                    , T .)

j s

, t f.                   e A

r 4 9

                 ,-fp
              .,v...                      i f-f                                                                                                                                                 #

m_ P n

                        +-                                                                                            g J                                                                                                                     ~

s

                    . . k' ;

i L 1 Y r

                                                \ ) . ./           4.

qw- ' g  %. g ~ '

                    > J. - i :\ &
 ,   L                                                                                              ..?                                                   --

1;n w. WW - n _ , -

                           ,r
                                      ; :,f                          ,

W1 s - > '

                                                                                                                                 ',                                     TECHNICAL DISCUSSION M, 3 -MU'                     <       1 4;.

4 "  % ,[ j - 4M- FRCk Item No'.:j86, 90 LUnit 2 86,590'- Unit 3 . j; .. . < .. 4

                                      .: m
            ;                        iDescrihtion'offIt'em                                                                                                      Reliance ECCS cooler fan motors.
     , . y                                                           ,-                                                                                                               .

y,G ; c

                                                                            ~
                                                                                            ,                                                                                  . Summary of TER
                                        ..                           3                                   ,X                      '
          - gN[ -TItem                                                                -

Unit- LDeficiencies

            ; 9
       ,1,. w
         '~
e. ' 4 86' 42 ?&D 3  : 4 ;5 10
                                                    ' .90 ~ n21 s 13'                                                                            .4,~5                          :10 1                       #
   # ' $Aisupplemental report to NUC-9 is appended by letter from Reliance
   ?                             JElectric. ;This.tletter restricts the. applicability of the supplemental The PECo analysis (Re f. 112) 4-< A.freport;to:Lthe;
                       ~

correlatesithe1 motor, insulation? insulation' system system. organic materials list to radiation

       . ,             W /damagetthr'esholds. ~ Additional evidence of qualification should be l";j M5 lprovided;for:theEmotor lead ~ splice and bearing lubricant and should
                   ?                 Laddressithe;thermaliaging.and radiation exposure of the motor as a fq-                            :whole.<-

JEvaluAtions-TAsinoted in:the TER, PEco reference 112 is a radiation 4 N yanalysisifor the." organic materials.which comprise the. motors'

                                                                                                                                           ~

felectricalGinsulation system. =The radiation: analysis o.f the motor is; e

               ~

licompletelinsthatiallithe organic materials?within-the motorJare ~

Jaddressed.xlThe, motor.fsplice? insulation qualification is covered:by-
                      ,2 rSyst'em1 Component                                                                                       9              Evaluation Worksheets which are located'in the
                                                                                                                                                                                    ~

J.f JElectrical1 Power:SystemEpart of~the database. iThe : extension of : this: J7 S anal'ysisjistnot!necessaryisince'the=remainingLmaterials are metallic. LThelRHR, Core} Spray"and HPCItarealcooler motors are reconditioned

      < %~ feverya fiveM(5) ? years:'which: consists of. Ins.talling :new bearings, . .. .
                                                                                        '                                                                                                        ~
                         \ ; dipping - the winding i:(when 'necessary) , cleaning,'. balancing,ilubricating~

Jandfhi-pot { testing.i1In! addition,jthe-RHR,:CorelSpray,;andlHPCI~ area-4: icoolers are3 tested.monthlysinVaccordance NithLPDAPS technical' '

u. i  %, specifications and' lubricated every three ' (3)L months. .
                                                             =

n. E 'fConclusion's'LBasedton the~abovetinformation',-itJ:isJconclu'ded that the' i 4 e yReliance; fan motorsiar'e-environmental 1yfqualified for the postulated o^ 7 accident!; conditions atiPBAPS. -

                                                                                                                                                                                                                         ' ~
   &n y n7                         ,

m <

                  ? , 5:."'                                                                               7 q

a 3 g;_ r ,< t

                                                 ,i4 s       f(-                      si?                                                                 ,       ,
                                                               '7e s                     .

7 i

               /[x ;
                                     <,r                                 <

t t

                                                                                                               '      ^
                                                 . q                      <                         ~

m

   &1 , *                                                    ',                                       ,
     ;p A ..y. q
            -<                                                                                                            7 1     ' ,'
     ;                                 ." V      -
-24 '

t im"

  • o-^
                                                                                                                                                                ~

Rev. 0 1/3/04l

                   ,,          i                                                                 g                    ,
Rev. 1 2/05'
   ,w                       .;         ,

afi Qt ,w - . p . y' 9; ,

   ,.
  • y } s y L a Vi[Jfj;l }.
                                                                                                   ~

w-

                                                                                                                                                                    ~ ~ j ' _.

1

                                                                                                                                                                                              - .                                   . . _ _ _ , _ _ . _ _ _ _ _ _ _ _ _}}