. OPERATING DATA REPORT 50-263 DOCKET NO.
' DATE 9- 1-94
- COMPLETED BY H. H. Paustian l TELEPHONE 612/295-5151 ;
OPERATING STATUS
] Notes ] ,
~
Monticello ] ]
'1. Unit Name :
August ) )
- 2. Reporting period:
- 3. Licensed Thermal Power (MWt): 1670 ] ]
- 4. Nameplate Rating (Gross MWe): 569 ] ] ,
- 5. Design Electrical Rating (Net MWe): 545.4 ] ] ,
- 6. Maximum Dependable Capacity (Gross MWe): 564 ] ]
- 7. Maximum Dependable Capacity (Net MWe):
~~536 ] ]
8.~If' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE ,
- 11. Hours In Reporting Period 744 5831 203112 744.0 5669.2 165044.9
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 940.7
- 13. Reactor Reserve Shutdown Hours 744.0 5636.3 162237.0
- 14. Hours Generitor On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 1108162 9231924 250496704
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 367156 3110062 84664725
- 18. Net Electrical Energy Generated (MWH) 347467 2980596 80999389 100.0% 96.7% 79.9%
- 19. Unit Service Factor 79.9%
- 20. Unit Availability Factor 100.0% 96.7%
- 21. Unit capacity Factor (Using MDC Net) 87.1% 95.4% 74.4% '
- 22. Unit Capacity Factor (Using DER Net) 85.6% 93.7% 73.1% i
- 23. Unit Forced Outage Rate 0.0% 3.3% 3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 9/15/94 - 39 days ,
- 25. If Shut Down At'End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved ,
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9409200169 940919 PDR ADOCK 05000263 R PDR
',. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-263 UNIT Monticello ~~
DATE 9- 1-94 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 497. 17 465. >
2 493. 18 466.
3 490. 19 459.
4 490. 20 458.
5 488. 21 458.
6 488. 22 451.
7 23 486. 454.
8 485. 24 448.
9 484. 25 447.
10 485. 26 445.
11 482. 27 439.
12 481. 28 442.
13 474. 29 438.
14 473. 30 438.
15 470. 31 437.
16- 468.
INSTRUCTIONS j on.this format,. list the average daily unit power level in MWe-Net for each ;
day in the reporting month. Compute to the nearest whole megawatt. l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-263 DATE 9- 1-94 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH AUG __
08-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)
08-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
s-
~ - .
UNIT SIRTfDOUNS AND POWER REDUCTIONS DOCKET NO. 50-263 UNIT NAME l onticello
- DATE ~ 9-01-94 ,
COMPLETED BY 71. I!. Paustian REPORT M0tml August TELEP110NE [612/295-5151 ~~ .
No. Date Duration Reason Method LER System Comp. Cause & Corrective Ty(pe
- 1) (hours) (2) of No. Code Code Action to Shutdown (4) (5) Prevent Recurrence (3) ,
None i
1 2 3 4 F: Forced Reason: Method: Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5 D-Regulator Restriction 4-Other (Explain) IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)
Il-Other (Explain) ,
. _ - _ - _ _ _ _ _ . - . - . - . . . . . - . . . . - . - .- - --,- - . - - - -- - - - _- - _ - - - - .. _ . . _ _ _ _