ML20083A818

From kanterella
Revision as of 08:39, 19 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO 50-336/83-030:fuel Movement Occurred in Spent Fuel Pool While Credit Taken to Encl Bldg B Filtration Sys.B Facility Inoperable Due to Installation of Temporary Unqualified Block Wall
ML20083A818
Person / Time
Site: Millstone 
Issue date: 12/05/1983
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
MP-5575, NUDOCS 8312200416
Download: ML20083A818 (1)


Text