ML20084A811

From kanterella
Revision as of 07:03, 18 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
AO 75-09:on 750410,control Rod Cap K-7 Inspected Due to Leak Indication & Pinhole Leak Discovered.Cap to Be Replaced
ML20084A811
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/11/1975
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084A805 List:
References
AO-75-09, AO-75-9, NUDOCS 8304050618
Download: ML20084A811 (1)


Text

-.

7

. :: u r;r:r _

~

@h%.U

';m:.,

k/sO  % Q . M*

ROCHESTER GA5 AND ELECTRIC CORPORATION = 89 EAST AVENUE, ROCNESTER. N.Y.1.tS49 i

.... a.x ... s .s e. co Ginna Station April 11,1975 Mr. James P. O'Reilly ,

Director ,'

U.S. Nuclear Regulatory Co::ssission ~

Region 1 _

631 Park Avenue ,' s King of Prussin Pa. 19t.05 ~ - .

Subject:

Abnorcal Occurrence 475-09: Pinhole leak in cap attached to Magnetic Control Rod Drive Rod Travel Housing K- 7

Dear Mr. O'Reilly:

'ihie is to confirn ny phone call to Mr. Paul Kellcgg yesterday to report

~ Abnormal Occurrence 475-09 at Cinna Station.

  • At the beginning of the refueling shutdewn that started on March 10, 1975,.

there was en indication of a leak frco K-7 centrol rod housing cap. This

  • was found by visual inspection. A dye penetrant check of the area did not shcv any lenk. The head was recoved fron the reaccor and placed on the miwd ou the up.u m. iu ;. fisur uf the evacuit.:uat. Iu this luc iluu *t u.s not possible to do any further checking of the area.

On April 10, 1975, with the head back on the reactor, the K-7 control rod cap

' was inspected further. The area was cledned with a file and polished with e.nery cloth. Another dye penetrant examinatien of the area shcued a pinhole leak approxinately 1/4" to 3/S" above the seal weld that seals the screwed cap to the Rod Travel llousing.

The PORC net and recoccended that a new cap be purchased and installed. If a ncv cap is not availabic in time for plant startup, a weld repair procedure will be developed to repair the leak. .

2. W Charles E. Platt Superintendent .

CEP:bg cc: C. J . S*.ra r th cut ISSE Corp. s..

L. D. White, Jr. .KrA' E Corp. -J; M

. J. F."Svect, RG6E Corp.

4 8304050618 750422 -

gDRADDCK 05000244 e f

PDR - -. - - - - -

2 l<

. . . .