ML20084N160
| ML20084N160 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/27/1973 |
| From: | Hobbs J AFFILIATION NOT ASSIGNED |
| To: | Kruesi F US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084N159 | List: |
| References | |
| NUDOCS 8306020581 | |
| Download: ML20084N160 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.D 9 J. C. HOBBS o 2507 COUNTRY CLU3 PR ADO. COR AL G ADLCS, FLORIDA n2=.:c:om= 2eu;c. mom =cr::xmm.
July 27, 1973 Ur. P.U. 1;rucci Director of Ecgulatory Operations U.S. 7. torr.ic Energy Corr.iccion Uachington, ;.C. 20545 Cear ::r. : rucci:
'2hc cnclosed ccpy of letter I wrote Junc Oth, exprocced ny thanks for your prcr:.pt ancuer to my letter.
I postponed its raailing hoping to get to the IIct.cstead Library;other Defence ::atters have prevented.
'/urhoy Point is ctill in trouhlc, the hearing did not cler.inate the hazard.
It uould c very helpful if you uculd cond I:.c:
- 1. Lirconcioned drauing of the header uhich failed and also of the hencer which replaced it. '"hc chetchoc werc very helpful ';ut not coriplete ,
j 2. Urauing of the original Safety Valves and discharge I piping.
- 3. Drawing of the procent Cafnty Valvec with Piping.
Sincerely, ,
- l g; , y/,/
C/
$DR 0A 730809 H hofK05000250 PDR n m~;e; o
& \J ( N l*