Monthly Operating Repts for May 1995 for Beaver Valley Power Station Units 1 & 2
ML20085F982
Person / Time
Site: Beaver Valley
Issue date: 05/31/1995
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506200009
Download: ML20085F982 (10)


Text

.- -

,e ...yo

'Af Telephone ;412) 393-6000

, x4 Shippingport. PA 15077-0004 e June 8,1995 l l

l l

Beaver Valley Power Station j Unit 1 - Docket No. 50-334, License No. DPR-66 i Unit 2 - Docket No. 50-412, License No. NPF-73  !

Monthly Ooerating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

1 In accordance with Appendix- A, Technical Sxcifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for tie month of May,1995.

Respectfully, f&

T.P.N nan '

Division Vice President, Nuclear Operations /

Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA 9506200009 950531 PDR ADOCK 05000334 R PDR hw ~The Nuclear Professionals

\_'.

=

4 * - -

NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE UNIT 1 MAY 1995

~May 1 The Unit operated at a nominal value of 100% output for the

_ through entire report period.

- May 31 l

1:

a e- - - - , , e ..-,,-r .

.w n- , - - , - -y, 4 -

4. 4

AVERAGE MILY LNIT POWER LEVEL DOCKER NO. 50-334 UNIT BVPS Unit 1 DATE June 2.-1995 CCMPIEPID BY David T. Jones TELEPHONE (412) 393-7553 70NIH May 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (BWe-Net) ()We-Net)-

1 833 17- 821 2 833 18 838 _

-3 829 19 829 4 829 20 829 5 833 21 825 ,

l 6 829 22 838 7 821 23 825 8 821 24 829 9 829 25 833-10 817 26 821 11 833 27 829 12 833 28 808 13 829 29 808 14 821 30 833 15 829 31 829-

-16 838 INSIRUCTIONS On_ this form, ; list the average daily unit power level MWe-Net for_each_ day in the r w i.ing monthe Conpute to the nearest whole megawatt.

l OPERATING DATA REPORT I DOCKET NO.: 50 334 l REPORT DATE: 06/0$/95 COMPLETED BY: DAVID T. JONES i TELEPHONE: (412) 393-7553 I OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: MAY 1995 i
3. LICENSED THERMAL POWER (MWt): 2652 '
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. HAX DEPENDABLE CAPACITY (Gross MWo): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: ,

I l

9. POWER LEVEL TO WHICH RESTRICTED, IF,ANY (Net MWe): None i
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 3623.0 167279.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 744.0. 2120.1 108676.9 j
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 744.0 2054.7 106592.4
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY CEN. (MWH): 1967916.0 5168470.0 256495536.5
17. GROSS ELECT. ENERGY GEN. (MWH): 651370.0 1701950.0 82727917.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 615700.0 1590360.0 77314264.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 56.7 65.5
20. UNIT AVAILABILITY' FACTOR:(PERCENT) 100.0 56.7 65.5
21. UNIT CAPACITY FACTOR (MDC): PCT 102.2 54.2 59.5
22. UNIT CAPACITY FACTOR (DER): PCT 99.1 52.6- 57.7
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.7 15.9 24.' SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

. FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

' UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Rock:t No. 50-334 .

Unit Name. SVPS Unit #1 Date June 5. 1995 Completed By _ David T. Jones REPORT MONTH May 1995 Telephone (412) 393-7553  ;

Method of = Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Oste .Typel '(Mours)

Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence

~

NONE 4

1 I

-1 2 '3 '

4 F-Forced Reason: .

Nethod: Exhibit F-Instructions for S-Scheduled 4-Equipment. Failure (Explain) 1-Manual- Preparation of Data Entry Sheets

- ' #4intenance or Test ~ 2-Manual Scram for Licensee Event Report (LER) File

--G:ef uel i ng - 3-Automatic Scram

-(NUREG0161).

O*itegulatory Restriction- 4-Cont'd. from Previous Month-E-operator Training & License Exam. 5 Reduction 5~ .

F-Administrative 9-Other  : Exhibit N-Same Source.

G-operational Error (Explain). .

t-Other (Emptain)'

.n

['

NARRATIVE

SUMMARY

OF c

MONTHLY OPERATING EXPERIENCE UNIT 2 MAY 1995 1 May 1 through The Unit began the report period in Mode 5 while preparations  !

for startup from the fifth refueling outage continued.

May 3 1

May 4 Mode _4 was entered at 2057 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.826885e-4 months <br />.

May 5

. The Unit amained in Mode 4 while preparations for entry into

. Mode 3 continued.

i

_ May 6 Mode 3 was entered at 0458 hours0.0053 days <br />0.127 hours <br />7.572751e-4 weeks <br />1.74269e-4 months <br />.

-- May 7 The Unit remained in Mode 3 while preparations for entry into Mode 2 continued.

May 8

Mode 2, was entered at 1449 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.513445e-4 months <br /> and the reactor was taken 1

critical at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.

4

May 9 ,

Mode I was entered at 1606 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.11083e-4 months <br />. T% Ms U.qit Generator was synchronized to the' electrical grid _ at 1758 hours0.0203 days <br />0.488 hours <br />0.00291 weeks <br />6.68919e-4 months <br /> completing the Unit's fifth refueling outage.

May 10 3

At 0812 hours0.0094 days <br />0.226 hours <br />0.00134 weeks <br />3.08966e-4 months <br /> the output breakers were opened and the Unit was remov:d from service to permit planned turbine overspeed trip testing. ' At - 1235 ' hours the out 4

synchronizir.3 the Unit to the put breakers electrical: were closed grid

! following 4 successful tunine overspeed trip testing. Output - was then escalated to approximately 28%. -

The Und achieverl

[ approximately 28% output at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />.

4 May 11 i The Unit continued to operate atL approximately 28% output to permit core flux mapping.

i May 12 j At 0341 hours0.00395 days <br />0.0947 hours <br />5.638227e-4 weeks <br />1.297505e-4 months <br /> the Unit commenced a rampup in output at 3% per hour toward approximately 75% output. The increase in output was halted at approximately 46% output to permit repair of the

motor for the "B" Heater Drain Pump. ~

May 13 Since the Unit was str.bilized at approximately 46% output, core flux ma the 75%pping was performed at this power plateau instead of at' power plateau.

May 14 The thit continued to operate at approximately 46% output to permP. core flux mappmg.

4 May 15 Following satisfactory repair of the motor for the "B" Heater -

Drain Pump and completion of core flux mapping, at 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br />
the Unit commenced a rampup in output at 3% per hour toward approximately 100% output.

4

l NARRATIVE

SUMMARY

OF MONTHLY OPERATINO EXPERIENCE . I UNIT 2 (continued)

MAY 1995 ,

May 16 The Unit achieved approximately 100% output at 0607 hours0.00703 days <br />0.169 hours <br />0.001 weeks <br />2.309635e-4 months <br />.

May 17 The Unit operated at a nominal value of 100% output for the

' through remainder of the report period.

May 31 1

I l

j i

1

, 1. . .

AVDUGE DAILY LNIT POWI!R LEVEL i I

l 1

DOCKET NO. 50-412 I INIT BVPS Unit 2 DATE June 2, 1995 CNPLEITD BY David T. Jones TELEPtDNE - (412) 393-755L 1

l POffIH May 1995 DAY AVDUGE DAILY PCWi!R LEVEL DAY AVDUGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)'

t ~

1 0 17 811 2 , 0 18 822 3- 0 19 829 4 . 0 20 831 l

,5 0 '

21' s ^831 6 0 22 838-7 0 23 835' 8 0 24 828 9 0 25 840 l 10 88 26 ~840 l

11 165 27 836 '

12 304 28 834 13 343 29 831-14 344 _ 30 837 15 546 . 31 835 16 803 INSIRUCTICNS On this form, -list the average daily unit power :an Ne-Net for each day in'

.the.r % ting month. Canpute to the nearest whole megs.mtr.

. ..s OPERATING DATA REPORT DOCKET NO.- 50-412 REPORT DATE: 06/05/95 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: MAY 1995  ;
3. LICENSED THERMAL POWER (MWt): 2652 1
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870 820
7. MAX. DEPENDABLE CAPACITY (Net MVe):

.l

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: l l

l l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 3623.0 66062.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 559.5 2548.6 56373.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 529.6 2518.7 55996.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1170585.0 6100396.0 138621718.0
17. GROSS ELECT. ENERGY GEN. (MWH): 384166.0 2015928.0 45067721.0
18. NET ELECTRICAL ENERGY GEN. (MVH): 358108.0 1901361.0 42576366.0
19. UNIT SERVICE FACTOR: (PERCENT) 71.2 69.5 84.8
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 71.2 69.5 84.8 21.1%IT CAPACITY FACTOR (MDC): PCT - 58.7 64.0 78.2
22. UNIT CAPACITY FACTOR (DER): PCT 57.6 62.8 77.1 2.5. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
24. SHU'OOWNS SCIlEttH.ED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STA2 TUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED

. INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N / A . .,_,,, N/A

2 e-

, -g

  • E ,

UNIT SNUTDOWNS AhD POWER REDUCTIONS (t20%) Docket No. 50-412

  • Unit Name BVPS Unit #2 Date June 5. 1995
Completed By David T. Jones i REPORT MONTH May 1995 Tetephone. (412) 393-7553

^

Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date. Typet (Nours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence, 5 950501 S 210.0 C 4 N/A . RC FUELxx- The Unit remained shutdown to-complete its fifth refueling outage.

6 950510 5 4.4 B' 9 N/A NA TUREIN The Unit was removed from service to permit turbine overspeed trip test i ng (the reactor remained 4

critical).

(

il 4

1 12 3 4 F-Forced Reason: Method Exhibit F-Instructions for S-Scheduled A-Equipment Faiture (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam. Reduction 5 F-Administrative 9-Other Exhibit N-Same Source.

G-Operational Error (Explain)

N-Other (Explain)

]