ML020510594

From kanterella
Revision as of 00:07, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Environmental Assessment Related to Administrative Technical Specification Amendment (Tac No. MB2852)
ML020510594
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/27/2002
From: George Wunder
NRC/NRR/DLPM/LPD1
To: Feigenbaum T
North Atlantic Energy Service Corp
Wunder G, NRR/DLPM, 415-1494
References
TAC MB2852
Download: ML020510594 (7)


Text

March 27, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

ENVIRONMENTAL ASSESSMENT RELATED TO ADMINISTRATIVE TECHNICAL SPECIFICATION AMENDMENT FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MB2852)

Dear Mr. Feigenbaum:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for amendment dated August 6, 2001, as supplemented on November 2, 2001, and February 1, 2002. The proposed amendment would make administrative changes to Technical Specification Sections 1.9, Core Alteration; 1.14, Engineered Safety Features Response Time; and 1.29, Reactor Trip Response Time.

The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Environmental Assessment cc w/encl: See next page

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION NORTH ATLANTIC ENERGY SERVICE CORPORATION DOCKET NO. 50-443 SEABROOK STATION, UNIT NO. 1 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Facility Operating License No. NPF-86, issued to North Atlantic Energy Service Corporation (the licensee), for operation of the Seabrook Station, Unit No. 1, located in Rockingham County, New Hampshire. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.

ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:

The proposed action would make administrative changes to Technical Specification Sections 1.9, Core Alteration; 1.14, Engineered Safety Features Response Time; and 1.29, Reactor Trip Response Time.

The proposed action is in accordance with the licensees application dated August 6, 2001, as supplemented by letters dated November 2, 2001, and February 1, 2002.

The Need for the Proposed Action:

The proposed action will allow the licensee to implement Technical Specification changes to support refueling outage 08, currently scheduled for spring 2002.

Environmental Impacts of the Proposed Action:

The NRC has completed its evaluation of the proposed action and concludes that it has no environmental impact.

The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types of effluents that may be released off site, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.

With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impact. Therefore, there are no significant nonradiological environmental impacts associated with the proposed action.

Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.

Environmental Impacts of the Alternatives to the Proposed Action:

As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.

Alternative Use of Resources:

The action does not involve the use of any different resource than those previously considered in the Final Environmental Statement for the Seabrook Station, Unit No. 1, dated December 1982.

Agencies and Persons Consulted:

On February 13, 2001, the staff consulted with the New Hampshire State official, Mike Nawoj, of the New Hampshire Office of Emergency Management, and on February 19, 2002, the staff consulted with the Massachusetts State official, James Muckerheid, of the Massachusetts Emergency Management Agency, regarding the environmental impact of the proposed action. The State officials had no comments.

FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.

For further details with respect to the proposed action, see the licensees letter dated August 6, 2001, as supplemented by letters dated November 2, 2001, and February 1, 2002.

Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.

Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.

Dated at Rockville, Maryland, this 27th day of March 2002.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

March 27, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

ENVIRONMENTAL ASSESSMENT RELATED TO ADMINISTRATIVE TECHNICAL SPECIFICATION AMENDMENT FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MB2852)

Dear Mr. Feigenbaum:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for amendment dated August 6, 2001, as supplemented on November 2, 2001, and February 1, 2002. The proposed amendment would make administrative changes to Technical Specification Sections 1.9, Core Alteration; 1.14, Engineered Safety Features Response Time; and 1.29, Reactor Trip Response Time.

The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Environmental Assessment cc w/encl: See next page DISTRIBUTION:

PUBLIC RLEP/ES [JTappert]

PDI-2 Reading File OGC GWunder ACRS JClifford CCowgill,RI TClark EAdensam Accession Number: ML020510594 OFFICE PDI-2/PM PDI-2/LA DRIP:RLEP/ES OGC PDI-2/SC NAME GWunder TClark JTappert RHoefling JClifford DATE 3/11/02 3/5/02 3/14/02 3/22/02 3/27/02 OFFICIAL RECORD COPY

Seabrook Station, Unit No. 1 cc:

William J. Quinlan, Esq. Mr. Stephen McGrail, Director Assistant General Counsel ATTN: James Muckerheide Northeast Utilities Service Company Massachusetts Emergency Management Agency P.O. Box 270 400 Worcester Road Hartford, CT 06141-0270 Framingham, MA 01702-5399 Mr. Peter Brann Philip T. McLaughlin, Attorney General Assistant Attorney General Steven M. Houran, Deputy Attorney State House, Station #6 General Augusta, ME 04333 33 Capitol Street Concord, NH 03301 Resident Inspector U.S. Nuclear Regulatory Commission Mr. Woodbury Fogg, Director Seabrook Nuclear Power Station New Hampshire Office of Emergency P.O. Box 1149 Management Seabrook, NH 03874 State Office Park South 107 Pleasant Street Town of Exeter Concord, NH 03301 10 Front Street Exeter, NH 03823 Mr. Daniel G. Roy Nuclear Training Manager Regional Administrator, Region I Seabrook Station U.S. Nuclear Regulatory Commission North Atlantic Energy Service Corp.

475 Allendale Road P.O. Box 300 King of Prussia, PA 19406 Seabrook, NH 03874 Office of the Attorney General Mr. James M. Peschel One Ashburton Place Manager - Regulatory Programs 20th Floor Seabrook Station Boston, MA 02108 North Atlantic Energy Service Corp.

P.O. Box 300 Board of Selectmen Seabrook, NH 03874 Town of Amesbury Town Hall Mr. Gene F. St. Pierre Amesbury, MA 01913 Station Director Seabrook Station Mr. Dan McElhinney North Atlantic Energy Service Corporation Federal Emergency Management Agency P.O. Box 300 Region I Seabrook, NH 03874 J.W. McCormack P.O. &

Courthouse Building, Room 401 Mr. Frank W. Getman, Jr.

Boston, MA 02109 President and Chief Executive Officer BayCorp Holdings, LTD 20 International Drive, Suite 301 Portsmouth, NH 03801-6809

Seabrook Station, Unit No. 1 cc:

Mr. Bruce D. Kenyon President and Chief Executive Officer Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Steve Allen Polestar Applied Technology, Inc.

77 Franklin Street, Suite 507 Boston, MA 02110