MONTHYEARML0205105942002-03-27027 March 2002 Environmental Assessment Related to Administrative Technical Specification Amendment (Tac No. MB2852) Project stage: Other ML0209506912002-04-0303 April 2002 Technical Specifications - Seabrook, Unit 1 - Amendment 81 Project stage: Other ML0205105782002-04-0303 April 2002 License Amendment, Administrative Changes to Technical Specifications Project stage: Other ML0217205922002-07-0909 July 2002 Termination of Review of Application for Orders and Conforming License Amendments for License Transfers Related to Corporate Restructuring Project stage: Approval 2002-04-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24162A0882024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24141A1502024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2272024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24092A0752024-03-28028 March 2024 3R22 Refueling Outage Inservice Inspection (ISI) Owners Activity Report Extension 2024-09-04
[Table view] |
Text
July 9, 2002 Mr. J. A. Price Vice President - Nuclear Technical Services - Millstone Dominion Nuclear Connecticut, Inc.
c/o Mr. David A. Smith Rope Ferry Road Waterford, CT 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT NOS. 1, 2, AND 3 -
SUSPENSION OF REVIEW OF APPLICATION FOR ORDER APPROVING IN-DIRECT LICENSE TRANSFERS RELATED TO CORPORATE RESTRUCTURING (TAC NOS. MB2850, MB2851, AND MB2852)
Dear Mr. Price:
By letters dated August 17 and November 26, 2001, you applied for an order consenting to the indirect transfer of the Facility Operating Licenses for Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3 (Millstone) to the extent held by Dominion Nuclear Connecticut, Inc. (DNC).
The indirect transfer would result from the establishment of an intermediary parent company that would own DNC. As noted in your letters, the proposed corporate restructuring was being planned in connection with related license transfer requests from Virginia Electric & Power Company (VEPCO) for the North Anna and Surry Power Stations made in order to comply with electric industry restructuring laws in the Commonwealth of Virginia.
In your letter dated August 17, 2001, DNC requested that the Nuclear Regulatory Commission (NRC) staff complete its review and issue a consenting order for the indirect transfer of the Millstone licenses by November 30, 2001. This schedule coincided with the schedule requested for the North Anna and Surry license transfers, which in turn was based on the requirement in the Virginia Electric Utility Restructuring Act that the Virginia State Corporation Commission (SCC) direct the functional separation of generation, retail transmission, and distribution on incumbent electric utilities in Virginia to be completed by January 1, 2002.
However, your letter dated November 26, 2001, requested that the NRC staff delay its consent to the indirect transfer of the Millstone licenses. This request was made to allow the SCC to issue a decision on VEPCOs proposed corporate restructuring before NRC action on the license transfer application. The letter stated that a revised request date for issuance of an order would be provided by VEPCO by January 31, 2002.
In a letter to the NRC dated January 30, 2002, VEPCO notified the staff that on December 18, 2001, the SCC issued an Order that denied VEPCOs request to transfer its generation assets to an affiliate company as proposed. However, certain issues remain open with the SCC notwithstanding its Order, although it is unclear at this time how and when the issues with the SCC will be resolved or whether changes to DNCs license transfer request for Millstone will be necessary as a result.
J. Price Due to the foregoing uncertainties, the NRC staff review of the Millstone license transfer request is being held in abeyance pending the resolution of issues before the SCC and/or modifications or adjustments to the transfer application. Accordingly, the staff has decided to close out TAC Nos. MB2850, MB2851, and MB2852.
Sincerely,
/RA/
Richard B. Ennis, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-245, 50-336, and 50-423 cc: See next page
ML021720592 *see previous concurrence OFFICE PDI-2/PM PDI-2/PM* PDI-2/PM* PDI-2/LA OGC* PDI-2/SC NAME REnnis VNerses JHickman TClark SHom JZimmerman for JClifford DATE 7/8/02 6-24-02 6-24-02 7/8/02 7-3-02 7/9/02 Millstone Nuclear Power Station Units 1, 2, and 3 cc:
Ms. L. M. Cuoco Mr. P. J. Parulis Senior Nuclear Counsel Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc. Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D. Ernest C. Hadley, Esq.
Director, Division of Radiation P. O. Box 1104 Department of Environmental West Falmouth, MA 02574-1104 Protection 79 Elm Street Mr. John Markowicz Hartford, CT 06106-5127 Co-Chair Nuclear Energy Advisory Council Regional Administrator, Region I 9 Susan Terrace U.S. Nuclear Regulatory Commission Waterford, CT 06385 475 Allendale Road King of Prussia, PA 19406 Mr. C. J. Schwarz Director - Nuclear Station Operations First Selectmen and Maintenance Town of Waterford Dominion Nuclear Connecticut, Inc.
15 Rope Ferry Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. W. R. Matthews Mr. D. A. Smith Vice President and Senior Manager -Licensing Nuclear Executive - Millstone Dominion Nuclear Connecticut, Inc.
Dominion Nuclear Connecticut, Inc. Rope Ferry Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Ms. Nancy Burton Mr. Charles Brinkman, Manager 147 Cross Highway Washington Nuclear Operations Redding Ridge, CT 00870 ABB Combustion Engineering 12300 Twinbrook Pkwy, Suite 330 Mr. D. J. Meekhoff Rockville, MD 20852 Unit 1 General Manager Dominion Nuclear Connecticut, Inc.
Senior Resident Inspector Rope Ferry Road Millstone Nuclear Power Station Waterford, CT 06385 c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357
Millstone Nuclear Power Station Mr. M. J. Wilson Units 1, 2, and 3 Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
cc: Rope Ferry Road Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Mr. D. A. Christian Senior Vice President - Nuclear Operations and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056 Attorney Nicholas J. Scobbo, Jr.
Ferriter, Scobbo, Caruso, Rodophele, PC 75 State Street, 7th Floor Boston, MA 02108-1807 Mr. J. Alan Price Site Vice President - Millstone c/o Mr. David A. Smith Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. E. Scace Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385