10 CFR 63.131, General Requirements
Jump to navigation
Jump to search
Performance Confirmation Program General requirements
a
(a) The performance confirmation program must provide data that indicate, where practicable, whether:
- (1) Actual subsurface conditions encountered and changes in those conditions during construction and waste emplacement operations are within the limits assumed in the licensing review; and
- (2) Natural and engineered systems and components required for repository operation, and that are designed or assumed to operate as barriers after permanent closure, are functioning as intended and anticipated.
b
(b) The program must have been started during site characterization, and it will continue until permanent closure.
c
(c) The program must include in situ monitoring, laboratory and field testing, and in situ experiments, as may be appropriate to provide the data required by paragraph (a) of this section.
d
(d) The program must be implemented so that:
- (1) It does not adversely affect the ability of the geologic and engineered elements of the geologic repository to meet the performance objectives.
- (2) It provides baseline information and analysis of that information on those parameters and natural processes pertaining to the geologic setting that may be changed by site characterization, construction, and operational activities.
- (3) It monitors and analyzes changes from the baseline condition of parameters that could affect the performance of a geologic repository.