10 CFR 63.41, Standards for Issuance of a License
License Issuance and Amendment
Standards for issuance of a license
A license to receive and possess source, special nuclear, or byproduct material at a geologic repository operations area at the Yucca Mountain site may be issued by the Commission on finding that--
a
(a) Construction of the geologic repository operations area has been substantially completed in conformity with the application as amended, the provisions of the Atomic Energy Act, and the rules and regulations of the Commission. Construction may be considered substantially complete for the purposes of this paragraph if the construction of--
- (1) Surface and interconnecting structures, systems, and components; and
- (2) Any underground storage space required for initial operation, are substantially complete.
b
(b) The activities to be conducted at the geologic repository operations area will be in conformity with the application as amended, the provisions of the Atomic Energy Act and the Energy Reorganization Act, and the rules and regulations of the Commission.
c
(c) The issuance of the license will not be inimical to the common defense and security and will not constitute an unreasonable risk to the health and safety of the public.
d
(d) Adequate protective measures can and will be taken in the event of a radiological emergency at any time before permanent closure and decontamination or decontamination and dismantlement of surface facilities.
e
(e) All applicable requirements of part 51 of this chapter have been satisfied.
External Links