Tech Spec Pages Corporate Office Title Change (TAC MB2457 and TAC MB2458)
ML020640642
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/21/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2457, TAC MB2458
Download: ML020640642 (2)


Text

ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant General Manager shall be responsible for overall unit operation of both units and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 The Nuclear Plant Supervisor (or during his absence from the control room, a designated individual) shall be responsible for the control room command function. A management directive to this effect, signed by the Site Vice President shall be reissued to all station personnel on an annual basis.

6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATION 6.2.1 An onsite and an offsite organization shall be established for facility operation and corporate management. The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant.

a. Lines of authority, responsibility and communication shall be established and defined from the highest management levels through intermediate levels to, and including all operating organization positions. Those relationships shall be documented and updated, as appropriate, in the form of organizational charts. These organizational charts will be documented in the Topical Quality Assurance Report and updated in accordance with 10 CFR 50.54(a)(3).
b. The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety, and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.
c. The Plant General Manager shall be responsible for overall plant safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.
d. Although the individuals who train the operating staff and those who carry out the quality assurance functions may report to the appropriate manager onsite, they shall have sufficient organizational freedom to be independent from operating pressures.
e. Although health physics individuals may report to any appropriate manager onsite, for matters relating to radiological health and safety of employees and the public, the Health Physics Supervisor shall have direct access to that onsite individual having responsibility for overall unit management. Health physics personnel shall have the authority to cease any work activity when worker safety is jeopardized or in the event of unnecessary personnel radiation exposures.

TURKEY POINT - UNITS 3 & 4 6-1 AMENDMENT NOS. 220 AND 214

ADMINISTRATIVE CONTROLS 6.6 DELETED 6.7 SAFETY LIMIT VIOLATION is violated:

6.7.1 The following actions shall be taken in the event a Safety Limit shall be notified by

a. In accordance with 10 CFR 50.72, the NRC Operations Center, one hour after the violation has telephone as soon as practical and in all cases within Review Nuclear been determined. The Chief Nuclear Officer, and the Company Board (CNRB) shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

10 CFR 50.73.

b. A Licensee Event Report shall be prepared in accordance with in accordance with
c. The License Event Report shall be submitted to the Commission within 30 days after 10 CFR 50.73, and to the CNRB, and the Chief Nuclear Officer discovery of the event.

by the Nuclear

d. Critical operation of the unit shall not be resumed until authorized Regulatory Commission.

6-12 AMENDMENT NOS. 220 AND 214 TURKEY POINT - UNITS 3 & 4