ML020570576

From kanterella
Jump to navigation Jump to search

Amendment Corporate Officer Title Change (TAC MB2457 and TAC MB2458)
ML020570576
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/21/2002
From: Jabbour K
NRC/NRR/DLPM/LPD2
To: Stall J
Florida Power & Light Co
Jabbour K, 415-1496
References
TAC MB2457, TAC MB2458
Download: ML020570576 (10)


Text

February 21, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT UNITS 3 AND 4 ISSUANCE OF AMENDMENTS REGARDING CORPORATE OFFICER TITLE CHANGE (TAC NOS. MB2457 AND MB2458)

Dear Mr. Stall:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 220 to Facility Operating License No. DPR-31 and Amendment No. 214 to Facility Operating License No. DPR-41 for the Turkey Point Plant, Units Nos. 3 and 4, respectively. The amendments consist of changes to the Technical Specifications (TS) in response to your application dated July 18, 2001.

The amendments would change the title of the corporate executive responsible for overall nuclear plant safety from President-Nuclear Division to Chief Nuclear Officer, in Section 6.0, Administrative Controls, of Turkey Point Units 3 and 4 TS.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosures:

1. Amendment No. 220 to DPR-31
2. Amendment No. 214 to DPR-41
3. Safety Evaluation cc w/enclosures: See next page

February 21, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT UNITS 3 AND 4 ISSUANCE OF AMENDMENTS REGARDING CORPORATE OFFICER TITLE CHANGE (TAC NOS. MB2457 AND MB2458)

Dear Mr. Stall:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 220 to Facility Operating License No. DPR-31 and Amendment No. 214 to Facility Operating License No. DPR-41 for the Turkey Point Plant, Units Nos. 3 and 4, respectively. The amendments consist of changes to the Technical Specifications (TS) in response to your application dated July 18, 2001.

The amendments would change the title of the corporate executive responsible for overall nuclear plant safety from President-Nuclear Division to Chief Nuclear Officer, in Section 6.0, Administrative Controls, of Turkey Point Units 3 and 4 TS.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosures:

1. Amendment No. 220 to DPR-31
2. Amendment No. 214 to DPR-41
3. Safety Evaluation cc w/enclosures: See next page Distribution:

PUBLIC KJabbour RDennig PDII-2 R/F RCorreia BClayton(Hard Copy) OGC HBerkow ACRS GHill (4 copies)

DTrimble LWert, RII UBhachu Package: ML020730308 Tech Spec Pages: ML020640642 ADAMS ACCESSION NO. ML020570576 OFFICE PDII-2/PM PDII-2/LA RORP/SC IOLB/SC OGC PDII-2/SC NAME KJabbour BClayton RDennig DTrimble SUtall (NLO) RCorreia DATE 02/01/02 02/01/02 02/08/02 02/15/02 02/20/02 02/21/02 OFFICIAL RECORD COPY

FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 220 License No. DPR-31

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Florida Power and Light Company (the licensee) dated July 18, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-31 is hereby amended to read as follows:

(B) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 220, are hereby incorporated in the license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days within issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Richard P. Correia, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 21, 2002

FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO. 4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 214 License No. DPR-41

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Florida Power and Light Company (the licensee) dated July 18, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-41 is hereby amended to read as follows:

(B) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 214, are hereby incorporated in the license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(C) This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Richard P. Correia, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 21, 2002

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 220 FACILITY OPERATING LICENSE NO. DPR-31 AMENDMENT NO. 214 FACILITY OPERATING LICENSE NO. DPR-41 DOCKET NOS. 50-250 AND 50-251 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.

Remove pages Insert pages 6-1 6-1 6-12 6-12

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 220 TO FACILITY OPERATING LICENSE NO. DPR-31 AND AMENDMENT NO. 214 TO FACILITY OPERATING LICENSE NO. DPR-41 FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 AND 50-251

1.0 INTRODUCTION

By letter dated July 18, 2001, Florida Power and Light Company (FPL or the licensee) proposed a revision to the Technical Specifications (TS) for Turkey Point Plant, Units 3 and 4. The proposed amendments would change the title of the corporate executive responsible for overall nuclear plant safety from President-Nuclear Division to Chief Nuclear Officer, in Turkey Point Units 3 and 4 TS, Section 6.0, Administrative Controls.

2.0 BACKGROUND

On June 4, 2001, FPL appointed a Senior Vice President in charge of all nuclear operations.

The Senior Vice President is an officer of FPL, reports to the President and Chief Executive Officer of FPL Group, and has corporate responsibility for overall nuclear plant safety.

Consistent with the requirements of Title 10, Code of Federal Regulations (10 CFR),

Section 50.54(a)(3), the licensee changed its Topical Quality Assurance Report (TQAR) to replace President-Nuclear Division with the generic organizational position title of Chief Nuclear Officer.

Previously, the corporate executive responsible for overall plant nuclear safety was designated as President-Nuclear Division, which is the title currently used in the Turkey Point Units 3 and 4 TS, Section 6.0. The proposed change eliminates the specific reference to the organizational title, President-Nuclear Division, and replaces it with the generic organizational position title of Chief Nuclear Officer. The Senior Vice President in charge of all nuclear operations will meet all the requirements of the title of Chief Nuclear Officer as delineated in the Turkey Point Unit 3 and 4 TS, Section 6.0, and the TQAR.

Use of the generic organizational position title of Chief Nuclear Officer will preclude the need for future amendments to the TS, if the title of the corporate executive responsible for overall plant nuclear safety were to be changed again.

ENCLOSURE 3

3.0 EVALUATION The licensees request involves only a change in the title of the corporate executive responsible for overall plant nuclear safety of Turkey Point Units 3 and 4. The proposed changes to the TS are administrative in nature and result in no changes in responsibilities or accountabilities delineated in TS Section 6 and the TQAR. The proposed amendment will not require a design change or modification, additions, deletions to the physical plant or the modes of plant operations defined in the facilities operating licenses. Therefore, the TS revision is acceptable.

4.0 STATE CONSULTATION

Based upon a letter dated March 8, 1991, from Mary E. Clark of the State of Florida, Department of Health and Rehabilitative Services, to Deborah A. Miller, Licensing Assistant, U.S. Nuclear Regulatory Commission, the State of Florida does not desire notification of issuance of license amendments.

5.0 ENVIRONMENTAL CONSIDERATION

These amendments relate to changes in record keeping, administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (66 FR 41622, dated August 8, 2001). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.

5.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Ujagar S. Bhachu Date: February 21, 2002

Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:

M. S. Ross, Attorney Attorney General Florida Power & Light Company Department of Legal Affairs P.O. Box 14000 The Capitol Juno Beach, FL 33408-0420 Tallahassee, Florida 32304 Mr. John P. McElwain, Site Vice President T. O. Jones, Plant General Manager Turkey Point Nuclear Plant Turkey Point Nuclear Plant Florida Power and Light Company Florida Power and Light Company 9760 SW. 344th Street 9760 SW. 344th Street Florida City, FL 33035 Florida City, FL 33035 County Manager Ms. Olga Hanek Miami-Dade County Acting Licensing Manager 111 NW 1 Street, 29th Floor Turkey Point Nuclear Plant Miami, Florida 33128 9760 SW 344th Street Florida City, FL 33035 Senior Resident Inspector Turkey Point Nuclear Plant Mr. Don Mothena U.S. Nuclear Regulatory Commission Manager, Nuclear Plant Support Services 9762 SW. 344th Street P.O. Box 14000 Florida City, Florida 33035 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Mr. Rajiv S. Kundalkar Department of Health Vice President - Nuclear Engineering Bureau of Radiation Control Florida Power & Light Company 2020 Capital Circle, SE, Bin #C21 P.O. Box 14000 Tallahassee, Florida 32399-1741 Juno Beach, FL 33408-0420 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100