Letter Sequence Other |
---|
|
|
MONTHYEARML0210802382002-05-0202 May 2002 Issuance of Amendment Relocation of Certain Engineered Safety Features Pump Values from Technical Specifications to the Technical Requirements Manual (Tac No. MB4258) Project stage: Approval ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 Project stage: Other 2002-05-02
[Table View] |
|
---|
Category:Technical Specification
MONTHYEARL-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-19129, Submittal of Changes to the Seabrook Station Technical Specification Bases2019-12-31031 December 2019 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18195, Submittal of Changes to the Seabrook Station Technical Specification Bases2018-12-18018 December 2018 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-17208, Submittal of Changes to the Seabrook Station Technical Specification Bases2017-12-14014 December 2017 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process SBK-L-16206, Submittal of Changes to Technical Specification Bases Dated 12/21/20162016-12-21021 December 2016 Submittal of Changes to Technical Specification Bases Dated 12/21/2016 SBK-L-15228, Submittal of Changes to the Technical Specification Bases2016-01-0505 January 2016 Submittal of Changes to the Technical Specification Bases SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14231, Submittal of Changes to Technical Specification Bases2014-12-18018 December 2014 Submittal of Changes to Technical Specification Bases ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-12265, Submittal of Changes to the Technical Specification Bases2012-12-19019 December 2012 Submittal of Changes to the Technical Specification Bases SBK-L-12052, Submittal of Changes to Technical Specification Bases2012-02-16016 February 2012 Submittal of Changes to Technical Specification Bases SBK-L-11066, License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation2011-04-21021 April 2011 License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation SBK-L-10236, Submittal of Changes to the Technical Specification Bases2010-12-30030 December 2010 Submittal of Changes to the Technical Specification Bases SBK-L-09269, Submittal of Changes to Technical Specification Bases2009-12-30030 December 2009 Submittal of Changes to Technical Specification Bases SBK-L-09211, Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria2009-09-25025 September 2009 Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 262009-02-18018 February 2009 License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26 SBK-L-08216, Submittal of Changes to Technical Specification Bases2008-12-16016 December 2008 Submittal of Changes to Technical Specification Bases SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat2008-02-19019 February 2008 Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated. SBK-L-06244, Submittal of Changes to Seabrook Station Technical Specification Bases2007-01-0303 January 2007 Submittal of Changes to Seabrook Station Technical Specification Bases SBK-L-06214, Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process.2006-11-28028 November 2006 Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process. SBK-L-06171, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time.2006-10-0101 October 2006 Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time. ML0605302202006-02-17017 February 2006 Technical Specification Pages Re Removal of Requirement to Perform End-of-Life Moderator Temperature Coefficient Measurement ML0512900672005-05-0606 May 2005 Technical Specifications, Containment Systems, Bases. Amendment No. BC 04-12 ML0511500472005-04-21021 April 2005 Technical Specifications, Containment Building Penetrations Surveillance Requirements (Tac. MC3753) ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term ML0430102922004-10-25025 October 2004 Technical Specification Pages, Change to Emergency Diesel Generator Technical Specification Surveillance Requirement 4.8.1.1.2A5 Footnote ML0428902812004-10-12012 October 2004 Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate ML0426700362004-09-21021 September 2004 License Amendment, Issuance of Amendment Re Change to Emergency Power Systems SBK-L-04050, Submittal of Changes to the Plant Technical Specification Bases2004-09-0202 September 2004 Submittal of Changes to the Plant Technical Specification Bases ML0408603072004-03-17017 March 2004 License Amendment Request 04-03, Application for Stretch Power Uprate ML0407106782004-03-0303 March 2004 Submittal of Changes to the Technical Specification Bases ML0404404322004-02-0404 February 2004 License Amendment Request 03-03, Miscellaneous Changes to the Technical Specifications. ML0404204042004-02-0303 February 2004 License Amendment Request 03-04, Change to Technical Specification SR 4.8.1.1.2a.5. ML0229400242002-10-11011 October 2002 License Amendment Request 02-04, Revision to TS Associated with Pressure/Temperature Curves & Low Temperature Overpressure Protection Limits ML0225301992002-09-0505 September 2002 Technical Specifications Re Index - Limiting Conditions for Operation and Surveillance Requirements ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 2024-08-12
[Table view] Category:Amendment
MONTHYEARL-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material SBK-L-09211, Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria2009-09-25025 September 2009 Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 262009-02-18018 February 2009 License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26 SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat2008-02-19019 February 2008 Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated. ML0605302202006-02-17017 February 2006 Technical Specification Pages Re Removal of Requirement to Perform End-of-Life Moderator Temperature Coefficient Measurement ML0512900672005-05-0606 May 2005 Technical Specifications, Containment Systems, Bases. Amendment No. BC 04-12 ML0511500472005-04-21021 April 2005 Technical Specifications, Containment Building Penetrations Surveillance Requirements (Tac. MC3753) ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term ML0430102922004-10-25025 October 2004 Technical Specification Pages, Change to Emergency Diesel Generator Technical Specification Surveillance Requirement 4.8.1.1.2A5 Footnote ML0428902812004-10-12012 October 2004 Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate ML0426700362004-09-21021 September 2004 License Amendment, Issuance of Amendment Re Change to Emergency Power Systems ML0408603072004-03-17017 March 2004 License Amendment Request 04-03, Application for Stretch Power Uprate ML0404204042004-02-0303 February 2004 License Amendment Request 03-04, Change to Technical Specification SR 4.8.1.1.2a.5. ML0229400242002-10-11011 October 2002 License Amendment Request 02-04, Revision to TS Associated with Pressure/Temperature Curves & Low Temperature Overpressure Protection Limits ML0225301992002-09-0505 September 2002 Technical Specifications Re Index - Limiting Conditions for Operation and Surveillance Requirements ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 2024-08-12
[Table view] |
Text
REACTIVITY CONTROL SYSTEMS BORATION SYSTEMS CHARGING PUMP - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency power source.
APPLICABILITY: MODES 4, 5, and 6.
ACTION:
With no charging pump OPERABLE or capable of being powered from an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
SURVEILLANCE REQUIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5.
4.1.2.3.2 All charging pumps, excluding the above required OPERABLE pump, shall be demonstrated inoperable* by verifying that the motor circuit breakers are secured in the open position** within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entering MODE 4 from MODE 3 or prior to the temperature of one or more of the RCS cold legs decreasing below 325°F, whichever comes first, and at least once per 31 days thereafter, except when the reactor vessel head closure bolts are fully detensioned or the vessel head is removed.
- An additional pump may be made capable of injecting under administrative control for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during pump-swap operation, except during RCS water-solid conditions.
Additionally, an inoperable pump may be energized for testing provided the discharge of the pump has been isolated from the RCS by a closed isolation valve with power removed from the valve operator, or by a manual isolation valve secured in the closed position.
- An alternate method to assure pump inoperability may be used by placing the control room pump-control switch in the Pull-to-Lock position and isolating the discharge flow path of the pump from the RCS by at least one closed isolation valve. Use of the alternate method requires inoperability verification at least once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SEABROOK - UNIT I 3/4 1-9 Amendment No. 74, 83
REACTIVITY CONTROL SYSTEMS BORATION SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging pumps shall be OPERABLE.
APPLICABILITY: MODES 1,2, and 3.*
ACTION:
With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least the limit specified in the CORE OPERATING LIMITS REPORT (COLR) for the above MODES at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging pumps to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.2.4 At least two charging pumps shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5.
- The provisions of Specifications 3.0.4 and 4.0.4 are not applicable for entry into MODE 3 for the centrifugal charging pump declared inoperable pursuant to Specification 4.1.2.3.2 provided that the centrifugal charging pump is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or prior to the temperature of one or more of the RCS cold legs exceeding 375°F, whichever comes first.
SEABROOK - UNIT I 3/4 1-10 Amendment No. 9,74, 83 1
EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - TavQ GREATER THAN OR EQUAL TO 350°F SURVEILLANCE REQUIREMENTS 4.5.2 (Continued)
- d. At least once per 18 months by:
- 1) Verifying automatic interlock action of the RHR system from the Reactor Coolant System to ensure that with a simulated or actual Reactor Coolant System pressure signal greater than or equal to 440 psig, the interlocks prevent the valves from being opened.
- 2) A visual inspection of the containment sump and verifying that the subsystem suction inlets are not restricted by debris and that the sump components (trash racks, screens, etc.) show no evidence of structural distress or abnormal corrosion.
- e. At least once per 18 months, during shutdown, by:
- 1) Verifying that each automatic valve in the flow path actuates to its correct position on (Safety Injection actuation and Automatic Switchover to Containment Sump) test signals, and
- 2) Verifying that each of the following pumps start automatically upon receipt of a Safety Injection actuation test signal:
a) Centrifugal charging pump, b) Safety Injection pump, and c) RHR pump.
- f. By verifying OPERABILITY of each pump when tested pursuant to Specification 4.0.5:
- 1) Centrifugal charging pump;
- 2) Safety Injection pump; and
- 3) RHR pump.
SEABROOK - UNIT I 3/4 5-6 Amendment No. 33474, 83
EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T... GREATER THAN OR EQUAL TO 350°F SURVEILLANCE REQUIREMENTS 4.5.2 (Continued)
- g. By verifying the correct position of each electrical and/or mechanical position stop for the following ECCS throttle valves:
- 1) Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE, and
- 2) At least once per 18 months.
High Head SI System Intermediate Head SI System Valve Number Valve Number SI-V-143 SI-V-80 SI-V-147 Sl-V-85 SI-V-151 SI-V-104 SI-V-155 SI-V-109 SI-V-117 SI-V-121 SI-V-125 SI-V-129
- h. NOT USED I SEABROOK - UNIT 1 3/4 5-7 Amendment No. 33-,74, 83
EMERGENCY CORE COOLING SYSTEMS BASES 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS (Continued)
When the RCS has a vent area equal to or greater than 18 square inches, or the RCS is in a reduced inventory condition, i.e., whenever reactor vessel water level is lower than 36 inches below the reactor vessel flange, one Safety Injection pump may be made OPERABLE when in MODE 5 or MODE 6 with the reactor vessel head on and the vessel head closure bolts not fully detensioned. When operating in this configuration, cold overpressure protection is provided by either the mechanical vent opening in the RCS boundary, equal to or greater than 18 square inches, or the additional void volume existing when operating in a reduced inventory condition. Either configuration is required to be present prior to making the SI pump OPERABLE. This required RCS vent area or reduced inventory condition and the cold overpressure protection surveillance requirements to verify the presence of the RCS vent area or verify that the reactor vessel water level is lower than 36 inches below the reactor vessel flange provides assurance that a mass addition transient can be mitigated and that adequate cold overpressure protection is provided.
The Surveillance Requirements provided to ensure OPERABILITY of each com ponent ensures that at a minimum, the assumptions used in the safety analyses are met and that subsystem OPERABILITY is maintained. With the exception of the operating centrifugal charging pump, the ECCS pumps are normally in a standby, non-operating mode. As such, flow path piping has the potential to develop voids and pockets of entrained gases. Maintaining the piping from the refueling water storage tank (RWST) to the RCS full of water (by verifying at the accessible ECCS piping high points and pump casings, excluding the operating centrifugal charging pump) ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of non-condensable gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following a safety injection (SI) signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation. Surveillance Requirements for throttle valve position stops and flow balance testing 1 provide assurance that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to: (1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECCS-LOCA analyses.
Verifying that the RHR system suction valve interlock is OPERABLE ensures that the RCS will not pressurize the RHR system beyond its design pressure. The value specified in the surveillance requirement ensures that the valves cannot be opened unless the RCS pressure is less than 440 psig. Due to bistable reset design, and the instrument uncertainty, the valves could be open above the interlock setpoint, but below the reset I Refer to the Technical Requirements Manual for flow balance criteria.
SEABROOK - UNIT I B 3/4 5-2 Amendment No. ,64,74, 83