ML022950088

From kanterella
Revision as of 05:20, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Biweekly Notice Memo, Notice of Issuance, Add Two Footnotes to TS Table 3.3.8.1-1, Functions 1.e & 2.e, & Make Editorial Change to Heading of TS Table 3.3.8.1-1
ML022950088
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/12/2002
From: Macon W
NRC/NRR/DLPM/LPD3
To:
NRC/NRR/DLPM
Macon W, NRR/DLPM/LPDIII-02, 415-3965
References
TAC MB5556, TAC MB5557
Download: ML022950088 (3)


Text

November 12, 2002 MEMORANDUM TO: Biweekly Notice Coordinator FROM: William A. Macon, Jr., Project Manager, Section 2 /RA/

Project Directorate III Division of Licensing Project Management

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE -

NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES (TAC NOS. MB5556 AND MB5557)

Exelon Generation Company, LLC, Docket Nos. 50-373 and 50-374, LaSalle County Station, Units 1 and 2, LaSalle County, Illinois Date of application for amendments: July 8, 2002 Brief description of amendments: The proposed amendments would change Appendix A, Technical Specifications (TS), of Facility Operating License Nos. NPF-11 and NPF-18.

Specifically, the proposed change adds two footnotes to TS Table 3.3.8.1-1, "Loss of Power Instrumentation," Functions 1.e and 2.e, "Degraded Voltage - Time Delay, LOCA," and makes an editorial change to the heading of TS Table 3.3.8.1-1. The Degraded Voltage -

Time Delay, LOCA, function is currently required to be OPERABLE during plant configurations when the ECCS instrumentation that generates the Loss of Coolant Accident (LOCA) signal is not required to be OPERABLE. The proposed changes correct this inconsistency by adding two new footnotes to TS Table 3.3.8.1-i that modify the required OPERABILITY of the Degraded Voltage - Time Delay, LOCA, function.

Date of issuance: November 12, 2002 Effective date: As of the date of issuance and shall be implemented within 30 days.

Biweekly Notice Coordinator Amendment Nos.: 155 & 141 Facility Operating License Nos. NPF-11 and NPF-18: The amendments revised the Technical Specifications.

Date of initial notice in FEDERAL REGISTER: August 20, 2002 (67 FR 53986)

The Commissions related evaluation of the amendments is contained in a Safety Evaluation dated November 12, 2002.

No significant hazards consideration comments received: No.

Biweekly Notice Coordinator Amendment Nos.: 155 & 141 Facility Operating License Nos. NPF-11 and NPF-18: The amendments revised the Technical Specifications.

Date of initial notice in FEDERAL REGISTER: August 20, 2002 (67 FR 53986)

The Commissions related evaluation of the amendments is contained in a Safety Evaluation dated November 12, 2002.

No significant hazards consideration comments received: No.

DISTRIBUTION:

Non-Public PD3-2 r/f W. Macon C. Rosenberg ADAMS Accession Number: ML022950088 OFFICE PM:LPD3-2 LA:LPD3-2 OGC* SC:LPD3-2 NAME WMacon CRosenberg RWeisman LRaghavan for AMendiola DATE 10/23/02 10/23/02 11/01/02 11/05/02 OFFICIAL RECORD COPY