MONTHYEARNOC-AE-240040, Application for Order Consenting to Direct Transfer of Licenses2024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses NOC-AE-240040, Operator Licensinq Examination Schedule Revision 32024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 NOC-AE-240040, Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 752024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 NOC-AE-240040, Financial Assurance for Decommissioning - 2024 Update2024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation2024-02-0808 February 2024 Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic 2024-07-31
[Table view] |
Text
Nuclear Operating Company 6 MY BU5 '1 -
3oc-~, d. 1 1 T. -.
I August 5, 2002 NOC-AE-02001370 10CFR50 Mr. Ellis W. Merschoff Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 -Ryan Plaza Drive, Suite 400' Arlington, Texas 76011-8064 South ITexas Project Unilis 1 and 2 Docket Nos. )TN 50-498, 50-499 South Texas Proiect Comr prehensive Cultural Assessment
References:
- 1. Letter, A. A. Thadani to W. T. Cottle, "Confirmatory Order Modifying License (Effective Immediately) and Exercise of Discretion,' (EA 97-341), -June 9,1998
- 2. Letter, E.W. Mersch6ff to W. T. Cottle, "Request For Partial Relaxation Of Confirmatory Order,' November 24,1999 3.- Letter, E. W. Merschoff to W. T. Cottle, "Relaxation Of Confirmatory Order Modifying License," June 24, 2002
- 4. Letter, W. T. Cottle to E. W. Merschoff, "South Texas Project
- Comprehensive Cultural Assessment," November 1, 1999,
- NOC-AE-000691
- 5. Letter, W. T. Cottle to E. W. Merschoff, "South Texas Project Comprehensive Cultural Assessment,"t April 17, 2002, NOC-AE-02001277 This letter provides additional information concerning our upcoming 2002 mini-cultural survey and the 2003 Comprehensive Cultural Assessment required by Nuclear Regulatory Commission (NRC) Order EA-97-341 (the Order) dated June 9, 1998, (Reference 1) as amended by References 2 and 3.
In Reference 3, the NRC granted permission to conduct the 2002 mini-cultural survey in the form of interviews and focus groups. In our letter requesting this change (Reference 5) we stated that SYNERGY Consulting Services Corporation would be conducting the interviews/focus groups. STP b O:\WP\NL\NRC-AP\MISC-02\02001 370.doc STI: 3147 1423
NOC-AE-02001 370 Page 2 of 3 Nuclear Operating Company (STPNOC) has evaluated other contractors and decided to use Management Insight Technologies instead of SYNERGY for the 2002 "mini-survey". We intend to use Management Insight Technologies during the "mini-survey" in order to decide on a contractor for future cultural surveys.
STPNOC still intends to use SYNERGY Consulting Services to administer the 2003 Comprehensive Cultural Assessment as we have done in previous years.
The preparations for the interviews and focus groups are underway and they should be completed by September 2002. The results will be reported to the NRC as required by the Order.
Also, in Reference 2 the NRC approved changes to the requirements of the original Order (Reference 1) where "mini-surveys' would not be required to be performed in the same year as Comprehensive Cultural Assessments. The schedule STPNOC provided in Reference 4 indicated that the final Comprehensive Cultural Assessment would be administered in September 2003.
However, STPNOC has determined that the 2003 Comprehensive Cultural Assessment would fit better within the overall station activities if conducted in January 2003. This timing gives an appropriate interval since the last Comprehensive Cultural Assessment (conducted in December 2001) and meets the requirements of the Order.
It is our intent to keep the NRC informed of the status of the Order while also assuring that we have no misunderstandings. If you have any questions, please contact Robyn Piggott at 361-972-7438 or me at 361-972-8757.
J. J. Sheppard Vice President & Assistant to the President & Chief Executive Officer RDP O:\WP\NL\NRC-AP\MISC-02\02001 370.doc STI: 31471423
NOC-AE-02001370 Page 3 of 3 cc:
(paper copy) (electronic copy)
U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Reliant Energy, Inc.
Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Departmrent of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady A. H. Gutterman, Esquire City of Austin Morgan, Lewis & Bockius LLP Electric Utility Department 721 Barton Springs Road M.T. Hardt/W. C. Gunst Austin, TX 78704 City Public Service