MONTHYEARML0235405232002-12-17017 December 2002 Technical Specification Pages for Amendment Nos. 209 & 100 Modify the Note to Eliminate the Once Per 60 Months Restriction on Replacing the Battery Service Test by the Battery Modified Performance Discharge Test Project stage: Other ML0235402002002-12-17017 December 2002 License Amendments 209 and 190, Modify the Note to Eliminate the Once Per 60 Months Restriction on Replacing the Battery Service Test by the Battery Modified Performance Discharge Test Project stage: Other 2002-12-17
[Table View] |
Technical Specification Pages for Amendment Nos. 209 & 100 Modify the Note to Eliminate the Once Per 60 Months Restriction on Replacing the Battery Service Test by the Battery Modified Performance Discharge TestML023540523 |
Person / Time |
---|
Site: |
McGuire, Mcguire |
---|
Issue date: |
12/17/2002 |
---|
From: |
NRC/NRR/DLPM |
---|
To: |
|
---|
References |
---|
TAC MB6233, TAC MB6234 |
Download: ML023540523 (2) |
|
|
---|
Category:Technical Specifications
MONTHYEARML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits ML18355A6102019-01-25025 January 2019 Issuance of Amendments to Revise the Licensing Basis for Protection from Tornado Generated Missiles ML18318A3582019-01-16016 January 2019 Issuance of Amendment Nos. 311 and 290 to Correct Non-Conservative Technical Specification 3.4.11, Pressurizer Power Operated Relief Valves Porvs) RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating ML17269A0552017-10-25025 October 2017 McGuire, Units 1 and 2 - Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-283-A, Revision 3 (CAC NOS. MF9098 and MF9099) ML17248A4692017-08-29029 August 2017 Tech Spec and Tech Spec Bases TS-LOEP & TSB-LOES ML17237A0472017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification - List of Effected Pages (Rev. 111) RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17087A2732017-03-22022 March 2017 Issue Tech Specification List of Affected Pages (Loep), Revision 108 ML17087A2722017-03-22022 March 2017 Renewed Facility Operating License - Amendment 293 ML16236A0532016-09-26026 September 2016 Issuance of Amendments Regarding One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML16243A3532016-08-17017 August 2016 Technical Specifications 5.5, Revision 1 - Amendment No. 276/256 ML16139A4612016-05-10010 May 2016 Technical Specification 3.3.1, Rev. 001, Amendments 283 and 262 ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. ML15306A1412016-03-16016 March 2016 Issuance of License Amendment Regarding Nuclear Service Water System Allowed Outrage Time Extension ML16004A3522016-02-0303 February 2016 Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1 ML15174A1732015-08-24024 August 2015 Issuance of Amendments Regarding Technical Specification Definition of Rated Thermal Power ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement2015-03-23023 March 2015 Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, ML14211A4032014-08-27027 August 2014 Issuance of Amendments Regarding Technical Specification 3.3.2 in Support of Compliance with NRC Order EA-12-049 ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML13316A0072013-10-31031 October 2013 Updated Technical Specifications Manual and Bases ML13277A3602013-09-24024 September 2013 Technical Specifications Bases ML13135A1332013-04-25025 April 2013 Annual Radioactive Effluent Release Report ML12340A4062012-11-27027 November 2012 Technical Specifications & Technical Specification Bases Updates. Includes Tsb Loes (Revision 114) & Tsb 3.6.15 (Entire Section) Rev 125 ML12240A1962012-09-29029 September 2012 Issuance of Amendments, Regarding Changes to Diesel Generator Starting Air Pressure Limits ML12229A1462012-08-0909 August 2012 License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12082A2102012-03-0505 March 2012 License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML11341A1102011-12-0505 December 2011 License Amendment Request for Changes to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, Function 16(e) ML11318A1172011-11-0909 November 2011 License Amendment Request for Temporary Changes to Technical Specifications and Limited Duration Use of NUREG-0800, Section 3.5.1.3, Revision 3, to Allow Nuclear Service Water System (Nsws) 'A' Train Repair ML11131A1332011-09-12012 September 2011 License Amendment, Issuance of Amendments Regarding Technical Specification Changes to Allow Manual Operation of the Containment Spray System ML11140A0882011-05-12012 May 2011 Request for Exemption from Certain Requirements of 10 CFR 72.212(a)(2), 72.212(b)(2)(i), 72.212(b)(7) and 72.214 ML1106603442011-02-28028 February 2011 Technical Specification and Tec Spec Bases Updates ML1103200662011-01-24024 January 2011 Notice of Enforcement Discretion Request (Noed), Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.3 ML1032700962010-12-20020 December 2010 License Amendment, Issuance of Amendments Regarding Revision of Technical Specification (TS) 3.8.4 DC (Direct Current) Sources - Operating. ML1032706582010-11-18018 November 2010 Response to Request for Additional Information to Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements ML1022803352010-08-0404 August 2010 Technical Specification Updates ML1019504512010-08-0202 August 2010 Issuance of Amendments Regarding Replacement of Source Range and Intermediate Range Encore Detection Systems with Equivalent Neutron Monitoring Systems Using Fission Chamber Detectors (TAC ME1749 & ME1750) ML1021503242010-06-28028 June 2010 Technical Specifications and Technical Specifications Bases Updates 2024-04-08
[Table view] |
Text
DC Sources - Operating 3.8.4 SURVEILLANCE FREQUENCY SR 3.8.4.7 - - -...-- NOTET-------------------- -------------
S-..-.-----------------
The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7. I Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
I SR 3.8.4.8 Verify battery capacity is Ž_80% of the manufacturer's 60 months rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected life with capacity < 100%
of manufacturer's rating AND 24 months when battery has reached 85% of the expected life with capacity >
100% of manufacturer's rating McGuire Units 1 and 2 3.8.4-3 Amendment Nos. 209 & 190
DC Sources-Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.8.4.6 This SR requires that each battery charger be capable of supplying 400 amps and 125 V for > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. These requirements are based on the design requirements of the chargers (Ref. 4). According to Regulatory Guide 1.32 (Ref. 11), the battery charger supply is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurrences. The minimum required amperes and duration ensures that these requirements can be satisfied.
The Surveillance Frequency is acceptable, given the unit conditions required to perform the test and the other administrative controls existing to ensure adequate charger performance during these 18 month intervals.
In addition, this Frequency is intended to be consistent with expected fuel cycle lengths.
SR 3.8.4.7 A battery service test is a special test of battery capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> should correspond to the design duty cycle requirements as specified in Reference 4.
The Surveillance Frequency of 18 months is consistent with the recommendations of Regulatory Guide 1.32 (Ref. 11) with the exception that it is allowable to perform the battery service test with a unit in any Mode.
This SR is modified by a Note. The Note allows the performance of a modified performance discharge test in lieu of a service test.
The modified performance discharge test, as defined by IEEE-450 (Ref.
- 12) is a simulated duty cycle consisting of just two rates; the one minute rate published for the battery or the largest current load of the duty cycle, followed by the test rate employed for the performance test, both of which envelope the duty cycle of the service test. Since the ampere-hours removed by a rated one minute discharge represents a very small portion of the battery capacity, the test rate can be changed to that for the performance test without compromising the results of the performance McGuire Units 1 and 2 B 3.8.4-6 Revision No. 36