(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Inspection Report
MONTHYEARIR 05000238/20230012023-09-0606 September 2023 U.S. Department of Transportation, N.S. Savannah - NRC Inspection Report 05000238/2023001 IR 05000238/20220012023-01-10010 January 2023 U.S. Department of Transportation, N.S. Savannah - NRC Inspection Report No. 05000238/2022001 Dated January 10, 2023 IR 05000238/20210012021-08-10010 August 2021 U.S. Department of Transportation, N.S. Savannah - NRC Inspection Report 05000238/2021001 IR 05000238/20200012020-12-0202 December 2020 NRC Inspection Report No. 05000238/2020001, U.S. Department of Transportation, N.S. Savannah, Baltimore, Maryland IR 05000238/20190022020-01-0808 January 2020 NRC Inspection Report No. 05000238/2019002, U.S. Department of Transportation, N.S. Savannah, Baltimore, Maryland IR 05000238/20190012019-03-28028 March 2019 U.S. Department of Transportation, N.S. Savannah, Baltimore, Maryland, NRC Inspection Report 05000238/2019001 IR 05000238/20170012018-01-0808 January 2018 NRC Inspection Report No. 05000238/2017001, U.S. Department of Transportation, N.S. Savannah, Baltimore, Maryland IR 05000238/20140012014-12-19019 December 2014 IR 05000238-14-001, on 12/11/14 - 12/16/14, U.S. Department of Transportation, N.S. Savannah, Baltimore Maryland ML1212107052012-04-26026 April 2012 IR 05000238-11-001, on 12/12/11 - 03/29/12, U.S. Department of Transportation, N.S. Savannah, Baltimore, MD, Transmittal Letter IR 05000238/20110012012-04-26026 April 2012 IR 05000238-11-001, on 12/12/11 - 03/29/12, U.S. Department of Transportation, N.S. Savannah, Baltimore, MD, Inspection Report IR 05000238/20094022009-03-25025 March 2009 IR 05000327-09-402 and 05000238-09-402, on 03/02/2009, Sequoyah Nuclear Plant, NRC Security Inspection IR 05000238/20080012008-11-17017 November 2008 IR 05000238-08-001; on 09/10/2008, U.S. Department of Transportation; N.S. Savannah, Baltimore, MD IR 05000238/20062012006-10-19019 October 2006 IR 05000238-06-201, on 10/10-11/2006, U. S. Maritime Administration'S Nuclear Ship Savannah IR 05000238/20032012003-11-26026 November 2003 IR 05000238/03-201 on 11/13/03 - 11/14/03 for James River Reserve Fleet Office Near Ft. Eutis, Virginia IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue IR 05000238/19982011998-03-11011 March 1998 Insp Rept 50-238/98-201 on 980128-30.No Violations Noted. Major Areas inspected:on-site Review of Radiation Protection & Security Control Measures Implemented for Ns Savannah IR 05000238/19960011996-11-29029 November 1996 Insp Rept 50-238/96-01 on 961031.No Violation Noted.Major Areas Inspected:Routine,Announced Insp Conducted to Followup an Unresolved Item Identified in Insp Rept 50-238/94-03 IR 05000238/19890011989-09-20020 September 1989 Insp Rept 50-238/89-01 on 890906-08.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Activities & Followup & Review of Licensee Actions Re Inspector Followup Items & Previous Violation IR 05000238/19870011988-10-0303 October 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-238/87-01 2023-09-06
[Table view] |
Text
ber 26, 2003
SUBJECT:
NRC INSPECTION REPORT NO. 50-238/2003-201
Dear Mr. Seelinger:
This letter refers to the inspection conducted on November 13 and 14, 2003, at the James River Reserve Fleet office near Ft. Eustis, Virginia, and on board the N.S. Savannah. The inspection included a review of activities authorized under NRC license NS-1. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. Based on the results of this inspection, no safety concern or noncompliance of NRC requirements were identified. No response to this letter is required.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
Should you have any questions concerning this inspection, please contact Stephen Holmes at 301-415-8583.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-238 License No. NS-1 Enclosure: NRC Inspection Report No. 50-238/2003-201 cc w/encl.: Please see next page
N. S. Savannah Docket No. 50-238 cc:
Mr. Erhard W. Koehler Marine Surveyor Division of Ship Maintenance and Repair U.S. Department of Transportation Maritime Administration 400 7th Street, S.W.
Washington, DC 20590 Mr. David S. Breeden, Jr.
Chief, Safety Office Humphreys Engineer Center Support Activity Casey Building, Room 112 7701 Telegraph Road Alexandria, VA 22315-6034 Mr. Michael F. Bagley Fleet Superintendent James River Reserve Fleet Drawer C Fort Eustis, VA 23604 ber 26, 2003
SUBJECT:
NRC INSPECTION REPORT NO. 50-238/2003-201
Dear M