Exam Analysis
ML033421369
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
(DPR-028)
Issue date: 10/03/2003
From: Gosekamp M
Entergy Nuclear Vermont Yankee
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-271/OL-03-301
Download: ML033421369 (31)


Text

Question #14: The question is valid as written.

0/6 applicants answered correctly.

Traininghowledge deficiency - TCR 03-0453 Question #23: The question is valid as written.

3/6 applicants answered correctly.

Trainingknowledge deficiency - TCR 03-0454 Question #33: The question is valid as written.

3/6 applicants answered correctly.

Question is difficult and of limited value. Question to be deleted from exam bank.

TCR 03-0455 Question #55: The question is valid as written.

116 applicants answered correctly.

Distractors will be revised to clarify increase, decrease issues or limits. TCR 03-0456 Question #56: The question is valid as written.

2/6 applicants answered correctly.

Traininghowledge deficiency Distractors A and B will have the word ONLY added to the end of each sentence to better comply with the writers guide. TCR 03-0457 Question #SO: The question is valid as written.

1/2 applicants answered correctly.

The proctor failed to hand out EOP-3, which is a required student reference, when distributing exam material. The applicant who answered the question correctly asked for EOP-3 late, after the applicant who missed the question had left the room.

Question #82: The question is valid as written.

1/2 applicants answered correctly.

Trainingknowledge deficiency

Question #85: The question is valid as written.

1/2 applicants answered correctly.

-Traininghowledge deficiency Question #88: The question is valid as written.

1/2 applicants answered correctly.

Trainingknowledge deficiency Question #90: The question is valid as written.

0/2 applicants answered correctly.

Trainingknowledge deficiency Question #4: The question is valid as written.

1/2 applicants answered correctly.

Traininghowledge deficiency Question #95: The question is valid as written.

0/2 applicants answered correctly.

Training/knowledge deficiency Question #98: The question is valid as written.

1/2 applicants answered correctly.

During examination review with the applicants, it was determined that the incorrect answer was caused by a math error.

High quality distractors No trainingknowledge deficiency During examination review with the applicants on 10/14/03, all questions were discussed in.detail. The review was conducted by Scott Brown. Several minor editorial enhancements were recommended and are incorporated on the final exam disc provided. No technical inaccuracies were identified that would change any correct answers.

SRO NRC Exam 2003 Ouestion No. 14 Exam Bank Question No.: 5627 Revision: 1 Point Value: 1 SRO Only: No Instructor Guide: LOT-00-217 Objective: CRO 5b Question Level: Comprehension Select the correct answer:

RCIC is operating in the injection mode with its suction path from the torus. A slow leak develops in the torus.

As torus level continues to lower, RCIC:

will trip on low suction pressure. Incorrect - The slow reduction in torus level will allow RCIC to continue to run with its exhaust line uncovered and its suction line submerged pressurizing the containment preventing a low suction pressure trip will trip on high exhaust pressure. Correct Response EOP 3 study guide page 8-37. RCIC high exhaust pressure trip occurs at 43 psig and the primary containment vent rupture disc ruptures at 59 psig and is isolated by TSV 86 during operartion suction will auto transfer to the CST on Incorrect - We have an Auto Swap on LAW low torus water level. CST level. It makes sense to have one on low torus level but VYN does not.

suction will auto transfer to the CST on Incorrect - A low suction pressure suction low suction pressure. transfer makes sense but VYN does not have one.

References:

OP 2121, rev 29 Pilgrim 2003 NRC EOP 3 study guide page 8-37 New Task Associations 2170030101 Manually Initiate Startup of the RCIC System Knowledge and Abilities Associations

SRO NRC Exam 2003 Ouestion No. 23 Exam Bank Question No.: 5636 Revision: 1 Point Value: 1 SRO Only: No Instructor Guide: LOT-00-618 Objective: 1, 13, 15 Question Level: Fundamental KnowledgelMemory Select the correct answer:

The "A"Recirculation Loop has just experienced a double-ended rupture of the suction line.

LPCI injection must be shifted to the containment cooling mode no later than ! after the break to limit Correct Response-USAR requires containment cooling established at 600 seconds nost DBA LOCA

b. 600 seconds, peak drywell temperature Incorrect - USAR 14.6 page 21 requires containment in 30 minutes to limit drywell temDerature IC. I 60 minutes, peak torus temperature Incorrect - 60 minutes is beyond the USFAR specified maximum time.

Incorrect - 60 minutes is beyond the I I

d. 60 minutes, peak drywell temperature USFAR mecified maximum time.

References:

USFAR, rev 18, 14.6.25 New Task Associations 2000190501 Respond to High Torus Water Temperature they apply to HIGH SUPPRESSION POOL WATER TEMPERATURE: (CFR 41.5,45.6): Suppression pool cooling operation Static Simulator Exams: None Last Revised: 09/16/2003 9:29:43 AM by Brown, Scott T.

apply to LOW SUPPRESSION POOL WATER LEVEL:

(CFR 41.7 -45.6): RCIC: Plant-mecific Static Simulator Exams: None Last Revised: 09/16/2003 8:41:11 AM by Brown, Scott T.

SRO NRC Exam 2003 Question No. 33 Exam Bank Question No.: 5646 Revision: 2 Point Value: 1 SRO Only: No Instructor Guide: LOT-00-21 1 Objective: A 0 2g Question Level: Comprehension Select the correct answer:

The high pressure sensing line for the core plate D/P instrumentation has a fitting leak of 10 gpm at the D P cell. An ATWS event occurs and SLC "A" system is started.

The SLC system will inject:

I a. I all of the boron above the core date. Incorrect -

Incorrect -

some of the boron on the floor in the Incorrect -

some of the boron below the core plate, Correct Response - The core plate D P some on the floor in the Northeast Comer instrument high pressure tap is below the core plate and is the SLC injection path.

10 gpm of SLC in will go out the leak.

References:

LOT-00-216, CRO Obj. lb, c G191267 Sheet 1 New Task Associations Tkk Nt& tie 21 10050101 Inject Poison Solution into the Reactor Vessel relationships between STANDBY LIQUID CONTROL SYSTEM and the following: (CFR 41.2 to 41.9 / 45.7 to 45.8): Core plate differential pressure indication 1 Static Simulator Exams:None Last Revised: 08/12/2003 3:09:46 PM by Hallonquist, Nora E.

SRO NRC Exam 2003 Ouestion No. 55 Exam Bank Question No.: 5668 Revision: 5 Point Value: 1 SRO Only: No Instructor Guide: LOT-00-202 Objective: CRO 4, 5 Question Level: Fundamental KnowledgeMemory Select the correct answer:

During full power operation the "A"Recirc Motor Generator trips on differential overcurrent and repairs will take several weeks.

Which of the following limits must be changed to satisfy Tech Specs?

a. MCPR limits are increased. Incorrect -

6%APRM Rod Blocks are reduced. Correct Response

c. MAPLHGR limits are increased. Incorrect -
d. LHGR limits are reduced. Incorrect -

References:

COLR Cycle 23, rev 0 Tech Specs 3.6.G. 1.a, 203 LO1 EB #1650, modified Task Associations 2007900501 Respond to a Loss of Bus 1 Using ON 3 169 Static Simulator Exams: None Last Revised: 09/18/2003 653: 10 PM by Brown, Scott T.

SRO NRC Exam 2003 Ouestion No. 56 Exam Bank Question No.: 5669 Revision: 4 Point Value: 1 SRO Only: No Instructor Guide: LOT-03-201 Objective: CRO lf,lj,2 Question Level: Comprehension

~.- .

F T 1 Select the correct answer:

A reactor startup is in progress.

Reactor power on APRMs is 80%. Core flow is 85% of rated. Recirc drive flow is 80% of rated. Reactor power is being increased by control rod withdrawls when an RBM rod block occurs. RBM A is reading 89 and Rl3M B is reading 81.

To continue the power increase you must:

RBM A

b. Depress the "push to setup" button on Incorrect -

RBM B I lincreased

References:

OP 2133, rev 16 A R S 9-5-M-7 New Task Associations 2017360401 Respond to RBM HI/INOP 2 157180401 Respond to RBM System Alarms 215002 A2.01 ROD BLOCK MONITOR SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR 41.5 / 45.6): Withdrawal of control rod in high power region of core: BWR-3,4,5

Static Simulator Exams: None Last Revised: 09/18/2003 6:53:45 PM by Brown, Scott T.

SRO NRC Exam 2003 Question No. 80 Exam Bank Question No.: 5693 Revision: 3 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-614 Objective: SRO 1 Question Level: Analysis Select the correct answer:

The "A" Main Steam Line is leaking in the drywell. The following plant conditions exist.

All control rods are in Drywell temperature is 285°F and rising Drywell pressure is 3 .O psig and rising Drywell RRUs have been restarted Reactor water level is 145" Reactor pressure is 920 psig Torus level is 11 ft As the CRS you should order:

I Answer/Distractor 1 Justification

a. I Recirc pumps secured, drywell RRUs I Incorrect - Drywell sprays are not allowed, because drywell temperature cannot be Must determine still safe on RPV Level Instrument Saturation Curve at SRV reclosing pressure of 50 psig.

References:

EOP-3, rev 3 New EOP-3 is required for student reference.

Task Associations 20002 10501 Respond to High Drywell Temperature Knowledge and Abilities Associations

apply to HIGH DRYWELL PRESSURE:(CFR 41.10, Static Simulator Exams: None Last Revised: 08/19/2003 3:55:49 PM by Hallonquist, Nora E.

SRO NRC Exam 2003 Question No. 82 Exam Bank Question No.: 5695 Revision: 2 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-614 Objective: SRO 1 Question Level: Comprehension Select the correct answer:

An earthquake has caused an LNP and a crack in the torus. Plant conditions are as follows:

RPV level band 127"-177" RPV pressure is 100 psig and lowering A & B RHR Loops in torus cooling Torus level is 8 ft lowering CS "A" is injecting at 1000 gpm As the CRS you should direct torus temperature monitored on:

I Answer/Distractor Justification

a. ERFIS - average torus water temperature Incorrect -
b. CRP 9-3 TI-19-33C torus water Incorrect -

I I temDerature ERFIS - Points M062M064 (RHR heat Correct Response - ERFIS average torus exchanger inlet temperatures) temperature is preferred but at this torus level the detectors are monitoring torus air space temperature and not water temperature. The EOP Study Guide directs monitoring of points M062M064.

CRP 9-47 TR-16-19-40 Torus water Incorrect -

temDerature

References:

LOT-00-614, SRO 1 EOP Study Guide, rev 11, page 8-6 New Task Associations Task Number Task Title 2000190501 Respond to High Torus Water Temperature

Static Simulator Exams: None Last Revised: 09/18/2003 7:12:Ol PM by Brown, Scott T.

SRO NRC Exam 2003 Question No. 85 Exam Bank Question No.: 5698 Revision: 4 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-610 Objective: SRO 3 , 4 Question Level: Comprehension Select the correct answer:

A high reactor water level transient has occurred. Reactor water level is 250". MSIVs are shut.

All high pressure injection sources are secured. Operators are attempting to control pressure with SRVs. From CRP 9-3, it appears that the SRVs are not responding to the manual actuations. No tailpipe pressure switch actuations. Pressure control is sluggish and remains >

1055 psig.

In accordance with station procedures you should direct as a minimum:

used for pressure control. to be used for RPV pressure control under these conditions.

SRV operations to stop, RPV head vents Incorrect - RPV head vents are not allowed used for pressure control, and RWCU for RPV pressure control under these started in the letdown mode. conditions.

SRV tailpipe temperatures and primary Incorrect - Allowing continued SRV containment parameters monitored. operations with flooded steam lines increases the potential for tailpipe damage.

1 Actions must be taken to drain the main steam lines.

SRV tailpipe temperatures and primary Correct Response - OP 3 1 14 requires containment parameters monitored, and primary containment parameters to be RWCU started in the letdown mode. monitored when SRVs are opened with flooded steam lines. SRV tailpipe pressure switches may not indicate open SRVs when the steam lines are flooded. OT 3 114 directs monitoring tailpipe temperatures. EOP-1 pressure control leg directs use of RWCU in letdown if notfuel failure exists. This action will also lower RPV water level and reduce the potential for damage to SRV tailpipes.

References:

OT 3 114, rev 12 EOP-1 rev 2 1/26/2000 Plant Hatch event

New Task Associations: 2000060501 Respond to high reactor water level Knowledge and Abilities Associations operate the facility between shutdown and designated Dower levels (CFR 45.2)

Static Simulator Exams: None Last Revised: 09/16/2003 4:45:53PM by Brown, Scott T

SRO NRC Exam 2003 Question No. 88 Exam Bank Question No.: 5701 Revision: 2 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-205 Objective: SCRO 1 Question Level: Analysis Select the correct answer:

The reactor has been shutdown for 20 days. Shutdown cooling is in service. Parameters are as follows:

Reactor level 160" for I&C Surveillances Reactor coolant temperature is 95°F SDC flow is 4500 gpm Under these conditions, thermal stratification:

' I AnswedDistractor Justification will not occur. Flow may be lowered to Incorrect - 1100 gpm is the RHRSW Pump 1100 gpm before stratification is a min flow limit, not a thermal stratification concern. limit.

will occur. OP 2124 directs flow raised to Incorrect - 41 00 gpm is for pump min flow a minimum of 5500 gpm. concerns, not thermal stratification. OP 2124 has no 5500 gpm limit.

Incorrect - Thermal stratification will occur under these conditions and that is why the procedure does not allow 5

Correct Response - OP 2124

References:

OP 2124, rev 50, Precaution #37 GESIL 357 Task Associations 2057970101 Swap Shutdown Cooling Loops Knowledee and Abilities Associations I I I SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN I I I I COOLING MODE); and (b) based on those predictions, I

use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR 41.5 / 45.6): Inadequate system flow Static Simulator Exams: None Last Revised: 09/16/2003 2:37:06 PM by Brown, Scott T.

SRO NRC Exam 2003 Ouestion No. 90 Exam Bank Question No.: 5703 Revision: 0 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-223 Objective: SRO 3 Question Level: Comprehension Select the correct answer:

A plant shutdown is in progress to repair a recirc pump seal leak. Reactor power is 6%. The drywell is being purged through the 18" line to allow early primary containment entry.

This mode of operation is allowed by Technical Specifications for per calendar year. This restriction assures the integrity of the .

90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br />, SBGT Tech Spec, must also understand the concept that on a LOCA SBGT 2- open before the primary containment isolation valves can stroke shut. This event has the potential to rupture both SBGT trains and make secondary containment unavailable.

By limiting the time the 18" valves are open when containment is required, the probability of this happening is reduced to I

near zero.

b. I30 days, SBGT Incorrect -
c. I 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br />. Primarv Containment Incorrect -

I

d. 30 days, Primary Containment Incorrect -

References:

Tech Spec Bases, rev 197, page 165/166, Section 3.7 OP 2 1 15, rev 43, page 4 New Task Associations 34 10320302/0 Evaluate Plant System Performance and Coordinate Appropriate Actions 3 per Technical SpecificationslTMODCM in the Event A Limiting Condition for Operation is Entered or not Satisfied

Static Simulator Exams: None Last Revised: 07/25/2003 1:14:46PM by Hallonquist, Nora E.

SRO NRC Exam 2003 Question No. 94 Exam Bank Question No.: 5707 Revision: 0 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-308 Objective: SCRO (CRS) 1 Question Level: Fundamental KnowledgelMemory Select the correct answer:

The MSIVs are shut. The reactor is critical in accordance with OP 0105, Appendix A, "Reactor Heatup with the MSIVs Closed."

Which one of the following defines the Tech Spec mode of operation?

1 Answer/Distractor I Justification Id. ]Run I Incorrect - I

References:

Tech Spec definitions New Task Associations 34 10320302/0 Evaluate Plant System Performance and Coordinate Appropriate Actions 3 per Technical Specifications/TRM/ODCM in the Event A Limiting Condition for Operation is Entered or not Satisfied Static Simulator Exams: None Last Revised: 07/25/2003 1:24:08 PM by Hallonquist, Nora E.

SRO NRC Exam 2003 Question No. 95 Exam Bank Question No.: 5708 Revision: 2 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-138 Objective: 22, 24 Question Level: Analysis Select the correct answer:

Core flow is 60%. The recirculation motor generator scope tube mechanical stops are set for 109.5% speed. MCPR Option "A" has been selected based on full core scram times. Core exposure is 11,000 MWdSt. The MCPR operating limit is:

a. 1.49 Incorrect - Incorrect exposure used
b. 1.61 Incorrect - Coi-rect for full flow
c. 1.64 Incorrect - Incorrect exposure usgd 4

'&? 1.77 Correct Response - From COLR Table 2.2-k$

yJ .'

.' 1: Option A > 10,375 MWdST, MCPR =

k;

.J;~

1 1.61; From Figure 2.2-1: 60% flow intersects 109.5 at 1.1 (1.1)(1.61) = 1.771 I .

References:

COLR, rev 0, Cycle 23 Tech Spec New COLR is a required student reference Task Associations

'TaskN 2-34 10320302/0 Evaluate Plant System Performance and Coordinate Appropriate Actions 3 per Technical Specifications/TRM/ODCMin the Event A Limiting Condition for Operation is Entered or not Satisfied Static Simulator Exams: None Last Revised: 09/16/2003 2:54:41 PM by Brown, Scott T.

SRO NRC Exam 2003 Question No. 98 Exam Bank Question No.: 5711 Revision: 2 Point Value: 1 SRO Only: Yes Instructor Guide: LOT-00-404 Objective: SRO 1 Question Level: Analysis Select the correct answer:

A point source in the reactor building is reading 500 mr/hr at a distance of two (2) feet. Two options exist to complete rework on a valve located near this radiation source.

Option 1: Operator X can perform the task in thirty (30) minutes working at a distance of four (4) feet from the point source Option 2: Operators X and Y, who are trained in the use of a special extension tool, can perform the task in seventy five (75) minutes at a distance of eight (8) feet from the point source Which one of the following options is preferable and consistent with the ALARA program?

I Answer/Distractor I Justification

References:

LOT-00-059, rev 6, page 5 of 12 Palisades 2001 NRC Task Associations Task Number Task Title 3430290302/0 Assess Exposure Limits of Personnel for Assigned Duties 3

Knowledge and Abilities Associations I System ~ U ANO. 1 statement ]RO ISRO 10 I 2.3.10 I Ability to perform procedures to reduce excessive levels of I 2.9 I 3.3 radiation and guard against personnel exposure (CFR 43.4.45.10)

Static Simulator Exams: None Last Revised: 08/19/2003 3:44:38 PM by Hallonquist, Nora E.

NRC 2003 ANSWER KEY 1-75 RO 76-100 SRO ONLY Page 1 of 2 NAME: KEY DATE: 10/3/03 l . A B @ D 26. A B @ D 51. A B @ D

2. A B D 27. A @) C D 52. A B @ D
3. A @ C D 28. A @ C D 53. A @ C D 4 . A @ C D 29. @ B C D 54. @ B C D
5. A B C @ 30. A B @) D 55. A @ C D 6 . A B @ D 31. A B @ D 56. A B D
7. A B C @ 32. A B C @ 57. @ B C D 8 . @ B C D 33. A B C @ 58. A B @ D
9. A B C @ 34. A B @ D 59. @ B C D
10. A B C @ 35. @ B C D 60. A @ C D
11. @ B C D 36. A B C @ 61. A B @ D
12. A B @ D 37. @ B C D 62. @ B C D
13. A B @ D 38. A B C @ 63. @ B C D
14. A @ C D 39. A B @ D 64. A B @ D
15. A B @ D 40. A B @ D 65. @ B C D
16. B C D 41. @ B C D 66. A @ C D
17. A @ C D 42. A B C @ 67. @ B C D
18. A B C @ 43. A B C @ 68. A @ C D
19. @ B C D 44. A @ C D 69. @ B C D
20. @ B C D 45. A B & D 70. A @ C D
21. A B C @ 46. A B @ D 71. A @ C D
22. @ B C D 47. @ B C D 72. A B C @
23. @ B C D 48. A B @ D 73. A B @ D
24. A @ C D 49. 8 B C D 74. A @ C D
25. @ B C D 50. @ B C D 75. @ B C D

Page 2 of 2

76. A B @ D
77. A B @ D
78. A B @ D
79. A B C @
80. A B @ D
81. A B 6 D
82. A B @ D
83. A B @ D
84. @ B C D
85. A B C @
86. @ B C D
87. A B C -@
88. A B C @
89. A @ C D
90. @ B C D
91. A B @ D
92. I$, B C D
93. @ B C D
94. A @ C D
95. A B C @
96. @ B C D
97. A B @ D
98. A '@ C D
99. @ B C D 100 @ B C D

EXAMINATION LICENSED OPERATOR INITIAL TRAINING PROGRAM Course: SRO NRC Exam 2003 Exam Activity Code: Date Exam Prepared: 19 September 2003 Date Exam Taken: 3 October 2003 Exam Ouestions Level Source 1 c 5614 3 LOT-00-202 CRO 3j 3 295001/AA2.05 2 New 2 c 5615 2 LOT-0 1-262 CRO 6 3 295003/2.4.01 2 New 3 b 5616 3 LOT-00-601 CRO2,3,4 3 295004/AA1.03 1 New 4 b 5617 0 LOT-00-249 CRO 8 3 295005/AK2.01 1 New 5 d 5618 2 LOT-00-129 31 3 295006/AK1.01 0 New 6 0 5619 4 LOT-00-612 A2, A4 3 295016/AA2.07 2 New 7 d 5620 0 L-OT-00-603 CRO 3g 3 295018/AK2.01 1 New 8 a 5621 2 LOT-00-279 CRO le, 5 3 295019/AA1.04 1 New 9 d 5622 1 LOT-00-60 1 CRO 3 , 4 3 295021/AK1.04 1 New 10 d 5623 5 LOT-00-620 3 3 295023/AK2.03 0 New 11 a 5624 1 LOT-00-205 CRO 2 3 295024EK2.12 1 New 12 e 5625 3 LOT-00-302 CRO 3 3 295025/2.1.32 0 New 13 c 5626 3 LOT-00-607 CRO 2 3 295028EA2.05 1 New 14 b 5627 1 LOT-00-2 17 CRO 5b 3 295030EA1.02 1 New 15 c 5628 3 LOT-00-256 CRO 2 3 29503 1 E A l .11 0 New 16 a 5629 1 LOT-00-6 10 CRO 2 3 29503 1EA2.02 2 New 17 b 5630 0 LOT-00-6 10 CRO 2 3 295037EK3.04 2 New 18 d 5631 4 LOT-00-286 CRO 4a 3 600000/AK3.04 1 New 19 a 5632 0 LOT-00-607 CRO 1 3 295026/EK2.04 0 New 20 a 5633 2 LOT-00-138 17,19 3 29503W2.2.25 0 New 21 d 5634 4 LOT-00-602 CRO 3 3 295002/AK1.04 1 New 22 a 5635 2 LOT-00-288 CRO 5 3 295010/AK3.02 1 New 23 a 5636 1 LOT-00-6 18 1, 13, 15 3 295013/AK3.01 0 New 24 b 5637 4 LOT-00-308 CRO 2,3,4, 5 3 29501Y2.2.22 0 New 25 a 5638 1 LOT-00-607 CRO 2 , 3 3 295029EK1.01 1 Bank 26 c 5639 1 LOT-00-611 CRO 3 , 5 3 295033EA2.01 0 New 27 b 5640 2 LOT-0 1-223 CRO 4 , 5 3 295034EA1.02 1 New 28 b 5641 2 LOT-00-205 CRO 2 , 4 3 203000/A3.05 2 New 29 a 5642 1 LOT-00-205 CRO 2 3 205000/2.1.28 0 New 30 c 5643 2 LOT-00-206 1oc 3 206000/K2.03 0 New 31 c 5644 0 LOT-00-206 CRO 3, 5b, 6b, 7 3 206000/A1.08 0 New 32 d 5645 0 LOT-00-2 18 CRO 2 3 209001/K3.02 0 New 33 d 5646 2 LOT-00-21 1 A 0 2g 3 21 1000/K1.02 1 New 34 c 5647 2 LOT-00-626 CRO 4 3 21 1000K3.01 0 Bank 35 a 5648 1 LOT-00-2 12 CRO 2 3 212000/A1.09 1 New 36 d 5649 2 LOT-02-2 15 CRO 2i 3 215003K3.04 0 New

37 a 5650 1 LOT-02-215 CRO 8 3 215003K6.04 2 New 38 d 565 1 0 LOT-01-215 CRO 6 3 2 15004Kl.O 1 0 New 39 c 5652 3 LOT-05-215 CRO 6 3 215005/A1.02 1 New 40 c 5653 2 LOT-00-2 17 CRO 4b 3 2 17000K5.06 0 New 41 a 5654 3 LOT-00-2 18 CRO 2 3 218000K3.02 0 New 42 d 5655 3 LOT-00-206 CRO 5,7, 10a 3 2230021A2.02 2 New 43 d 5656 2 LOT-00-239 CRO 3 3 239002K1.09 1 New 44 b 5657 1 LOT-01-259 CRO 5e 3 259002K5.01 1 New 45 c 5658 0 LOT-00-261 CRO 5 3 261000K1.03 2 New 46 c 5659 6 LOT-00-264 CRO 11 3 262001K4.05 1 New 47 a 5660 2 LOT-00-262 Id, 3 3 26200 1/A4.0 1 1 New 48 c 5661 1 LOT-03-262 CRO 7 3 262002/K4.01 0 Bank Mc 49 a 5662 3 LOT-00-601 CRO2,3,4 3 263000K1.01 0 Bank Mc 50 a 5663 2 LOT-00-263 CRO 2 3 2630001A2.01 1 New 51 c 5664 0 LOT-00-603 CRO 3 3 264000K6.09 0 New 52 c 5665 1 LOT-00-279 A 0 9d, 11; CRO 3 300000/A3.02 0 New Id 53 b 5666 2 LOT-00-208 CRO 7 3 400000/A3.01 0 New 54 a 5667 3 LOT-02-201 CRO la, cy e, 3 3 201002/A2.01 0 New 55 b 5668 5 LOT-00-202 CRO 4 , 5 3 20200212.1.33 0 Bank MI 56 c 5669 4 LOT-03-201 CRO 1f,lJ,2 3 2150021A2.01 1 New 57 a 5670 1 LOT-00-216 CRO 4, l l a , 14 3 216000/A2.11 2 New 58 c 5671 2 LOT-00-205 CRO 2 3 219000/K2.01 0 New]

59 a 5672 0 LOT-01-229 CRO 5 3 223001K5.13 0 New 60 b 5673 1 LOT-00-234 A 0 2a, bycy 10a 3 234000/A2.03 2 New 61 c 5674 2 LOT-00-302 RO 13 3 239001K3.06 1 New 62 a 5675 2 LOT-00-249 CRO 5 , 7 , 9 3 241000/A3.12 1 New 63 a 5676 2 LOT-00-256 lj, 2 3 256000lA4.07 2 New 64 c 5677 1 LOT-01-288 A 0 3, CRO 3,5 3 29000112.1.30 1 New 65 a 5678 2 LOT-04-2 15 CRO 1, FND 3 3 290002K1.19 0 New 66 b 5679 1 LOT-00-302 CRO 2 3 0/2.1.18 0 New 67 a 5680 3 LOT-03-400 CRO 1 3 012.1.20 0 New 68 b 5681 2 LOT-01-400 CRO 3 3 0/2.2.23 0 New 69 a 5682 0 LOT-00-402 CRO 2 , 3 3 0/2.2.11 0 Bank M 70 b 5683 1 LOT-02-201 CRO la, b, 7 3 012.2.0 1 0 New 71 b 5684 1 LOT-00-27 1 CRO 5 3 0/2.3.11 0 New 72 d 5685 4 LOT-00-602 CRO 3 3 012.3.10 1 New 73 c 5686 3 LOT-00-6 10 CRO 3 3 0/2.4.18 0 New 74 b 5687 1 LOT-00-607 CRO 2 , 3 3 012.4.23 1 New 75 a 5688 0 LOT-00-622 CRO 4 3 012.4.19 0 New 76 c 5689 2 LOT-05-215 SRO 1 4 2950011AA2.02 2 BankM I 77 c 5690 1 LOT-00-601 SRO 8 4 295004/AA1.01 2 New 78 c 5691 2 LOT-00-601 SRO 8 4 295018/AA2.04 0 New 79 d 5692 1 LOT-00-601 SCRO (CRS) 5 , 7 4 295021/AA1.02 1 New 80 c 5693 3 LOT-00-6 14 SRO 1 4 295024EA2.02 2 New 81 c 5694 0 LOT-00-602 SRO 6 4 295025EA2.02 1 New

82 c 5695 2 LOT-00-614 SRO 1 4 295026/2.4.03 1 New 83 c 5696 1 LOT-00-603 SRO 4 4 600000/AA1.05 1 New 84 a 5697 2 LOT-00-308 SCRO 1 4 295007/2.2.22 0 New 85 d 5698 4 LOT-00-610 SRO 3 , 4 4 295008/2.2.02 1 New 86 a 5699 1 LOT-00-615 SRO 1 4 295010/AA2.02 1 Bank Clinton 2000 NR 87 d 5700 1 LOT-00-261 SRO 1 4 295034EK3.02 0 Bank Grand G 1998 NR 88 d 5701 2 LOT-00-205 SCRO 1 4 205000/A2.12 2 New 89 b 5702 2 LOT-00-614 SRO 1,2 4 209001/A2.09 2 New 90 a 5703 0 LOT-00-223 SRO 3 4 26 1000/2.1.27 1 New 91 c 5704 4 LOT-00-264 SCRO l a 4 264000K6.01 2 New 92 a 5705 3 LOT-00-205 SCRO 1 4 230000/2.2.25 1 New 93 a 5706 3 LOT-00-233 SRO 1 4 233000/A2.07 0 New 94 b 5707 0 LOT-00-308 SCRO (CRS) 1 4 0/2.1.22 0 New 95 d 5708 2 LOT 138 22,24 4 0/2.1.25 2 New 96 a 5709 0 LOT-00-400 SCRO 3 4 012.2.2 1 0 New 97 c 5710 1 LOT-00-223 SRO 3 4 0/2.3.09 0 New 98 b 5711 2 LOT-00-404 SRO 1 4 0/2.3.10 2 Bank Palisade 2001 NR 99 a 5712 2 LOT-00-900 SRO 1 , 4 4 0/2.4.40 0 New!

100 a 5713 1 LOT-00-900 SRO (CRS) 1.4 4 0/2.4.43 0 New 325 Ouestion Level Totals Level Description Number of Questions 0 Fundamental KnowledgeMemory 45 1 Comprehension 35 2 Analysis 20 Originator: Brown, Scott T.

Last Revised: 09/19/2003 7:36:15 PM by Brown, Scott T.

EXAMINATION LICENSED OPERATOR INITIAL, TRAINING PROGRAM Course: RO NRC Exam 2003 Exam Activity Code: Date Exam Prepared: 19 September 2003 Date Exam Taken: 3 October 2003 Exam Questions w -

ev Level Source 1 c 5614 3 LOT-00-202 CRO 3j 3 295001/AA2.05 2 New 2 c 5615 2 LOT-01-262 CRO 6 3 295003/2.4.01 2 New 3 b 5616 3 LOT-00-601 CRO2,3,4 3 295004/AA1.03 1 New 4 b 5617 0 LOT-00-249 CRO 8 3 295005/AK2.01 1 New 5 d 5618 2 LOT-00-129 31 3 295006/AK1.01 0 New 6 c 5619 4 LOT-00-612 A2,A4 3 295016/AA2.07 2 New 7 d 5620 0 LOT-00-603 CRO 3g 3 295018/AK2.01 1 New

.--- 3 295019/AA1.04 1 New 8 a 5621 2 LOT-00-279 CRO le, 5 9 d 5622 1 LOT-00-601 CRO 3,4 3 295021/AK1.04 1 - New 10 d 5623 5 LOT-00-620 3 3 295023/AK2.03 0 New 11 a 5624 1 LOT-00-205 CRO 2 3 295024EK2.12 1 New 12 c 5625 3 LOT-00-302 CRO 3 3 295025/2.1.32 0 New 13 c 5626 3 LOT-00-607 CRO 2 3 295028EA2.05 1 New 14 b 5627 1 LOT-00-2 17 CRO 5b 3 295030EA1.02 1 New 15 c 5628 3 LOT-00-256 CRO 2 3 295031EA1.11 0 New 16 a 5629 1 LOT-00-6 10 CRO 2 3 295031EA2.02 2 New 17 b 5630 0 LOT-00-610 CRO 2 3 295037EK3.04 2 New 18 d 5631 4 LOT-00-286 CRO 4a 3 600000/AK3.04 1 New 19 a 5632 0 LOT-00-607 CRO 1 3 295026EK2.04 0 New 20 a 5633 2 LOT-00-138 17,19 3 295038/2.2.25 0 New 21 d 5634 4 LOT-00-602 CRO 3 3 295002/AK1.04 1 New 22 a 5635 2 LOT-00-288 CRO 5 3 295010/AK3.02 1 New 23 a 5636 1 LOT-00-618 1,13, 15 3 295013/AK3.01 0 New 24 b 5637 4 LOT-00-308 CRO 2 , 3 , 4 , 5 3 295015l2.2.22 0 New 25 a 5638 1 LOT-00-607 CRO 2 , 3 , 3 295029EK1.01 1 Bank 26 c 5639 1 LOT-00-611 CRO 3,5 3 295033EA2.01 0 New 27 b 5640 2 LOT-0 1-223 CRO 4,5 3 295034EA1.02 1 New 28 b 5641 2 LOT-00-205 CRO 2 , 4 3 203000/A3.05 2 New 29 a 5642 1 LOT-00-205 CRO 2 3 205000/2.1.28 0 New 30 c 5643 2 LOT-00-206 1oc 3 206000/K2.03 0 New 31 c 5644 0 LOT-00-206 CRO 3,5b, 6b, 7 3 206000/A1.08 0 New 32 d 5645 0 LOT-00-2 18 CRO 2 3 209001K3.02 0 New 33 d 5646 2 LOT-00-21 1 A 0 2g 3 211000K1.02 1 New 34 c 5647 2 LOT-00-626 CRO 4 3 21 1000K3.01 0 Bank 35 a 5648 1 LOT-00-2 12 CRO 2 3 212000/A1.09 1 New 36 d 5649 2 LOT-02-2 15 CRO 2i 3 215003K3.04 0 New

37 a 5650 1 LOT-02-2 15 CRO 8 3 2 15003K6.04 2 New 38 d 5651 0 LOT-0 1-215 CRO 6 3 2 15004LIC2.0 1 0 New 39 c 5652 3 LOT-05-2 15 CRO 6 3 215005/A1.02 1 New 40 c 5653 2 LOT-00-2 17 CRO 4b 3 2 17000K5.06 0 New 41 a 5654 3 LOT-00-2 18 CRO 2 3 218000/K3.02 0 New 42 d 5655 3 LOT-00-206 CRO 5,7,10a 3 223002/A2.02 2 New 43 d 5656 2 LOT-00-239 CRO 3 3 239002K1.09 1 New 44 b 5657 1 LOT-01-259 CRO 5e 3 259 0 0 2 m .O1 1 New 45 c 5658 0 LOT-00-261 CRO 5- 3 261000K1.03 2 New 46 c 5659 6 LOT-00-264 CRO 11 3 262001K4.05 1 New 47 a 5660 2 LOT-00-262 Id, 3 3 26200 1/A4.0 1 1 New 48 c 5661 1 LOT-03-262 CRO 7 3 262002K4.0 1 0 Bank Mo 49 a 5662 3 LOT-00-601 CRO 2,3,4 3 263000/K1.01 0 Bank Mo 50 a 5663 2 LOT-00-263 CRO 2 3 263000/A2.01 1 New 51 c 5664 0 LOT-00-603 CRO 3 3 264000K6.09 0 New 52 c 5665 1 LOT-00-279 A 0 9d, 11; CRO 3 300000/A3.02 0 New 53 b 5666 2 LOT-00-208 Id CRO 7 3 400000/A3.01 0 New 54 a 5667 3 LOT-02-201 CRO la,c,e, 3 3 20 1002/A2.01 0 New 55 b 5668 5 LOT-00-202 CRO 4,5 3 202002/2.1.33 0 Bank Mc 56 c 5669 4 LOT-03-20 1 CRO lf,lj,2 3 2 15002/A2.01 1 New 57 a 5670 1 LOT-00-2 16 CRO 4, lla, 14 3 216000/A2.11 2 New 58 c 5671 2 LOT-00-205 CRO 2 3 2 1900O/K2.01 0 New 59 a 5672 0 LOT-01-229 CRO 5 3 223001K5.13 0 New 60 b 5673 1 LOT-00-234 A 0 2a, b, c, 10a 3 234000/A2.03 2 New 61 c 5674 2 LOT-00-302 RO 13 3 239001/K3.06 1 New 62 a 5675 2 LOT-00-249 CRO 5,7,9 3 24 1OOO/A3.12 1 New 63 a 5676 2 LOT-00-256 lj, 2 3 256000/A4.07 2 New 64 c 5677 1 LOT-01-288 A 0 3, CRO 3,5 3 290001/2.1.30 1 New 65 a 5678 2 LOT-04-2 15 CRO 1, FND 3 3 290002LKl. 19 0 New 66 b 5679 1 LOT-00-302 CRO 2 3 0/2.1.18 0 New 67 a 5680 3 LOT-03-400 CRO 1 3 0/2.1.20 0 New 68 b 5681 2 LOT-0 1-400 CRO 3 3 0/2.2.23 0 New 69 a 5682 0 LOT-00-402 CRO 2,3 3 0/2.2.11 0 Bank Mi 70 b 5683 1 LOT-02-201 CRO la, b, 7 3 0/2.2.01 0 New 71 b 5684 1 LOT-00-27 1 CRO 5 3 0/2.3.11 0 New 72 d 5685 4 LOT-00-602 CRO 3 3 012.3.10 1 New 73 c 5686 3 LOT-00-6 10 CRO 3 3 0/2.4.18 0 New 74 b 5687 1 LOT-00-607 CRO 2 , 3 3 012.4.23 1 New 75 a 5688 0 LOT-00-622 CRO 4 3 0/2.4.19 0 New 225

Ouestion Level Totals 0 Fundamental KnowledgelMemory 36 1 Comprehension 27 2 Analysis 12 Originator: Brown, Scott T.

Last Revised: 09/19/2003 7:32:38 PM by Brown, Scott T.