Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0411402882004-04-21021 April 2004 Amendment 280, Tech Spec Page 3/4.6-15, Enclosure 2 Project stage: Acceptance Review ML0411204032004-04-21021 April 2004 License Amendments 290 and 280, Revise Requirements for Containment Ventilation System Purge & Exhaust Isolation Valves Project stage: Other 2004-04-21
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML20108E9062020-04-20020 April 2020 Public Notice License Amendment Request to Amend Renewed Facility Operating License ML16110A0442016-04-18018 April 2016 (Section 13) Sequoyah Initial Exam 2016-301 Post Exam Comments ML15104A6892015-08-14014 August 2015 SQN Record of Decision ML13316A7752013-11-12012 November 2013 Pointer in ADAMS to Public Document Room for SQN Ghg Excel Spreadsheets, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAIs 6.a.i.2 - 8 Referenced in the SQN License Renewal Supplemental Environmental Impact Statement ML13038A3352013-01-0707 January 2013 License Renewal Application, Drawing List ML13298A0342012-05-10010 May 2012 SQN Air Quality Permit, Expire on 7-17-2017, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.A.II.3 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1119901872011-07-15015 July 2011 Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis NEI 99-02, NEI-99-02 FAQ EOF Participation Rev. 8-13-10, Pre Meeting2010-08-16016 August 2010 NEI-99-02 FAQ EOF Participation Rev. 8-13-10, Pre Meeting ML1019301962010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Sequoyah ML13298A0292009-03-0606 March 2009 SQN Annual Air Inspection Report 2007, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.ii.4 ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0705301552007-01-26026 January 2007 Soch Model Data Input (Unit 5) ML0634705992006-12-14014 December 2006 Plant Service List ML0703300202006-12-11011 December 2006 Summary of Conference Call Regarding Steam Generator Tube Inspections ML0411402882004-04-21021 April 2004 Amendment 280, Tech Spec Page 3/4.6-15, Enclosure 2 ML0411402842004-04-21021 April 2004 Amendment No. 290, Tech Spec Page 3/4.6-15, Enclosure 1 ML0411007412004-04-0909 April 2004 Nuclear Training, Training Materials Coversheet, OPL273C0202, Revision 0 ML0411007382004-04-0909 April 2004 Question 6: Provide Licensing Basis for Manual Actions ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0400903602003-12-22022 December 2003 Undated Post-Inspection Debrief Slides to C. Casto Regarding Sequoyah Triennial Fire Protection Inspection IP 71111.05T ML0403506912003-08-27027 August 2003 DRS Open Items Status ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0222600572002-07-17017 July 2002 Proposed Rule Part 170 Re Cost Recovery for Contested Hearings Related to National Security Initiatives ML0222600652002-07-16016 July 2002 Changes Dated 07/16/2002 ML0404801192002-03-12012 March 2002 Per/Status, Pages 18, 19, 35 and 41 ML0411007342002-03-0101 March 2002 Per Report No. 00-007928-000 ML0411007332002-01-29029 January 2002 Per Workorder Needing MRC or Supervisor Review Printout 2020-04-20
[Table view] |
Text
CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.9 One pair (one purge supply line and one purge exhaust line) of containment purge system lines may be open; the containment purge supply and exhaust isolation valves in all other containment purge lines shall be closed. Operation with purge supply or exhaust isolation valves open for either purging or venting shall be limited to less than or equal to 1000 hours41.667 days <br />5.952 weeks <br />1.37 months <br /> per 365 days. The 365 day cumulative time period will begin every January 1.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
- a. With a purge supply or exhaust isolation valve open in excess of the above cumulative limit, or with more than one pair of containment purge system lines open, close the isolation valve(s) in the purge line(s) within one hour or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
- b. With a containment purge supply and/or exhaust isolation valve having a measured leakage rate in excess of 0.05 La, restore the inoperable valve to OPERABLE status or isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Verify** the affected penetration flow path is isolated once per 31 days for isolation devices outside containment and prior to entering Mode 4 from Mode 5 if not performed within the previous 92 days for isolation devices inside containment. Otherwise be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />. The provisions of Specification 3.0.4 do not apply.
SURVEILLANCE REQUIREMENTS 4.6.1.9.1 The position of the containment purge supply and exhaust isolation valves shall be determined at least once per 31 days.
4.6.1.9.2 The cumulative time that the purge supply and exhaust isolation valves are open over a 365 day period shall be determined at least once per 7 days.
4.6.1.9.3 At least once per 3 months, each containment purge supply and exhaust isolation valve shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.05 La.*
- Enter the ACTION of LCO 3.6.1.1, "Primary Containment" when purge valve leakage results in exceeding the overall containment leakage rate acceptance criteria.
Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
SEQUOYAH - UNIT 2 3/4 6-1 5 Amendment No. 9,109,167,207, 280