Letter from R. Dodds, We Energies, to J. Crawford, Wisconsin Department of Natural Resources, Regarding Monitoring Report for Point Beach Nuclear Plant Dated 7/18/2003
ML041970120
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/18/2003
From: Dodds R
We Energies
To: Crawford J
Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources
References
Download: ML041970120 (3)


Text

-V M.2 A.,2 k *.I C J1 II-we energies .

231 W. Michigan Street Milwaukee. WI 53203 www.we-energies.c0m July 18, 2003 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.

P. O. Box 10448 Green Bay, WI 54307-0448

Dear Mr. Crawford:

MONITORING REPORT POINT BEACH NUCLEAR PLANT Permit # 436034500-POI requires the Company to submit a summary of the results of monitoring required by this permit by July 31 for the time period from January 1 through June 30 of the current year. The enclosed table, entitled "Parameters That Are Recorded Intermittently," shows a summary of the parameters monitored.

We did not operate the combustion turbine (CI), permit designation P01, concurrently with any of the emergency diesel generators -permit designations P02, P03, P04, and P05 - during the reporting time.

The combustion turbine is fired with a #1 and #2 fuel oil blend. The sulfur content of that fuel is

< 0.178%. The emergency diesel generators (P02, P03, P04 and P05) are fired with a low sulfur,

  1. 2 fuel oil. The sulfur content of that fuel is < 0.287%.

We analyze the sulfur content in each oil delivery following either ASTM DI 552-95 or ASTM D2622-98 procedures. We maintain records of each analysis at the plant.

The CT (P01) and the emergency diesel generators (permit designations P04 and P05) were operated less than 228.83 and 20.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> per month, on 12-month rolling average basis, respectively.

. .0a Mr. Crawford I

7/18/2003 Page 3 PARAMETERS THAT ARE RECORDED INTERM1TENTLY Emission Parameters Recorded(# readings taken in the Total # Percent of Unit reporting period) readings readings showing showing deviations deviations Date & time Run Time No. of samples of SU/SD analyzed for

%S in the oil PO1 (CT) 20 0 0 P01 (CT) 20 01 0 PoI (CT) 8 o2 0 P02 &P03 18 0 0 (EDGs)

.. 18 NA NA 0 o3 0 P04 &P05 17 0 0 (EDGs)

., 17 o4 0

.. 0 05 0 B01 & B02 NA NA 8 06 0 (Boilers) _

P06, P07, & NA NA 8 00 P09 . . -

'CT - plant designation, G05 - is limited to S 228.83 hrs/mon, on a 12 month rolling average 2 CT is limited to oil with S 0.178% sulfur by wgt and analyzed by We Energies or US Oil.

3 Emergency diesel generators - plant designations, EDG GO1 & G02 - (P02 & P03) are limited to oil with

4 Emergency diesel generators - plant designations, EDG G03 & G04 - (P04 & P05) are limited to

  • 20.67 hrs/mon, on a 12-month rolling average.

5 Emergency diesel generators - plant designations, EDG G03 & G04 (P04 & P05) are limited to oil with S 0.287% sulfur by wgt. and analyzed by We Energies or US Oil.

6 Heating boilers BDO & B02 are limited to oil with <0.5%sulfur by wgt.

7 Starting diesel G500 (P06), aux. diesel G501 (P07), and diesel fire pump (P09) are limited to oil with

Mr. Crawford 7/18/2003 Page 2 Responsible Official Certification I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.

Signature of Responsible Official: *Date: 7- z I -oS Printed Name of Responsible Official: Jo Jensen

Title:

Plant Manager If you have any questions or need additional information, please contact me at 414/221-2174.

Sincerely, R e D. Dodds Senior Engineer Environmental Department bcc: Terry Coughlin Kjell Johansen Joe Jensen File: 1.8.1.1 F:\DATA\WinWord\COMPRPTG\PBNP\PbnpO6302003.doc