July 26, 2004 LICENSEE: FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)
FACILITY: BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1)
SUBJECT:
SUMMARY
OF JUNE 8, 2004, PRE-APPLICATION REVIEW MEETING WITH FENOC, ET AL., REGARDING BVPS-1 ONE-CYCLE APPROVAL OF STEAM GENERATOR TUBE INSPECTION AND REPAIR CRITERIA USING W*
METHODOLOGY (TAC NO. MC3239)
On June 8, 2004, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FENOC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to conduct a working level pre-application review of FENOCs planned submittal for a one-cycle approval of the use of the Westinghouse Electric Companys W* methodology at BVPS-1. A list of attendees is provided as Attachment 1.
FENOC presented information contained in Attachment 2. FENOCs presentation included a description of the background information on the BVPS-1 steam generator (SG) tubes which led to the need for the planned use of the W* methodology. FENOC discussed the implications of not receiving approval of the use of the W* methodology during the BVPS-1 SG inspections in the fall 2004 refueling outage, the primary effect being a possibility that the analyzed tube plugging limit could be exceeded. FENOC included discussion of the BVPS-1 SG tube flaw and primary water stress corrosion cracking histories and the bounding leakage analysis. FENOC discussed with the staff the short lead time for the amendment review and ways to help facilitate the review and expedite responses to any additional information which may be requested by the NRC staff after the formal license amendment application is received. The licensee also provided a draft of selected portions of the forthcoming application including proposed Technical Specification changes.
During the meeting, the NRC staff discussed several technical and regulatory issues associated with the proposal with the licensee. In addition, the NRC staff expressed its willingness to work with the licensee to complete its review of the licensees formal application when received in time to support the licensees schedule. The licensees formal application was dated June 28, 2004.
CONTACT: Timothy G. Colburn 301-415-1402 NRR/DLPM
Members of the public were in attendance from PG&E and TVA. Public Meeting Feedback forms were not received.
Please direct any inquiries to Timothy G. Colburn at 301-415-1402, or tgc@nrc.gov.
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-334 Attachments: 1. List of Attendees
- 2. Licensee Handouts cc w/atts: See next page
ML042010038 NRC-001 OFFICE PDI-1/PM EMCB/SC PDI-1/SC NAME TColburn LLund RLaufer DATE 7/19/04 7/19/04 7/20/04 LIST OF ATTENDEES CATEGORY 1 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC), AND FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)
REGARDING USE OF WESTINGHOUSE W* METHODOLOGY AT BEAVER VALLEY POWER STATION, UNIT NO. 1 JUNE 8, 2004 9:00 A.M. -12:00 NOON NAME ORGANIZATION
- 1. Timothy G. Colburn NRC/NRR/PDI-1
- 2. Paul Klein NRC/DE/EMCB
- 3. Jim Davis NRC/RESDET/MEB
- 4. Ken Karwoski NRC/NRR/DE
- 5. Ron Fedin FENOC
- 6. Brian Sepelak FENOC
- 7. Gary Alberti FENOC
- 8. Greg Kammerdeiner FENOC
- 9. Bob Keating Westinghouse
- 10. William Cullen Westinghouse
- 11. Helen Cothron TVA
- 12. John Arhar PG&E Attachment 1
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Mary OReilly, Attorney Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Rich Janati, Chief FirstEnergy Corporation Division of Nuclear Safety 76 South Main Street Bureau of Radiation Protection Akron, OH 44308 Department of Environmental Protection Rachel Carson State Office Building FirstEnergy Nuclear Operating Company P.O. Box 8469 Regulatory Affairs/Performance Harrisburg, PA 17105-8469 Improvement Larry R. Freeland, Manager Mayor of the Borough of Shippingport Beaver Valley Power Station P O Box 3 Post Office Box 4, BV-A Shippingport, PA 15077 Shippingport, PA 15077 Regional Administrator, Region I Commissioner James R. Lewis U.S. Nuclear Regulatory Commission West Virginia Division of Labor 475 Allendale Road 749-B, Building No. 6 King of Prussia, PA 19406 Capitol Complex Charleston, WV 25305 Resident Inspector U.S. Nuclear Regulatory Commission Director, Utilities Department Post Office Box 298 Public Utilities Commission Shippingport, PA 15077 180 East Broad Street Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Director, Pennsylvania Emergency ATTN: R. G. Mende, Director Management Agency Work Management (BV-IPAB) 2605 Interstate Dr. Post Office Box 4 Harrisburg, PA 17110-9364 Shippingport, PA 15077 Ohio EPA-DERR FirstEnergy Nuclear Operating Company ATTN: Zack A. Clayton Beaver Valley Power Station Post Office Box 1049 Mr. B. F. Sepelak Columbus, OH 43266-0149 Post Office Box 4, BV-A Shippingport, PA 15077 Dr. Judith Johnsrud National Energy Committee Mr. L. William Pearce Sierra Club Vice President 433 Orlando Avenue FirstEnergy Nuclear Operating Company State College, PA 16803 Beaver Valley Power Station Post Office Box 4 J. H. Lash, Plant Manager (BV-IPAB) Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4