November 2004 Monthly Operating Report for Virgil C Summer Nuclear Station Unit 1
ML043410078
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/02/2004
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043410078 (5)


Text

Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 A SCANA COMPANY December 2, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, AZF4 Jeffrey B. Archie JBA/mbb Attachment c: T. D. Gatlin INPO Records Center T. G. Eppink (w/o Attachment) J&H Marsh & McLennan R. J. White William G. Wendland (ANI)

W. D. Travers Pat Haught (Westinghouse)

K. R. Cotton C. W. Adams*

G. A. Lippard NSRC NRC Resident Inspector CER (0-L-99-0350-1)

K. M. Sutton File (818.03-1, RR 4100)

Paulette Ledbetter DMS (RC-04-0194)

W. R. Higgins SCE&G I Virgil (. Summer NuclearStoaion

  • P.0. Box 88 .Jenkinsville, South Carolina 29065-T1(803) 345.5209 .www.scona.com 62§f

4.

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 985 17 986 2 985 18 987 3 984 19 987 4 985 20 987 5 986 21 987 6 986 22 988 7 986 23 987 8 987 24 987 9 986 25 987 10 986 26 987 11 986 27 987 12 987 28 987 13 987 29 987 14 986 30 987 15 986 16 986

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 OPERATING STATUS I Reporting Period: November 2004 Gross Hours in Reporting Period: 720 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 720.0 7762.2 154566.7 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 720.0 7747.3 152582.7 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2085933 22412852 415028907 10 Gross Electrical Energy (MWH) 738560 7903080 140779939 11 Net Electrical Energy Generated (MWH) 710207 7596594 134599387 12 Reactor Service Factor 100.0 96.5 84.3 13 Reactor Availability Factor 100.0 96.5 84.3 14 Unit Service Factor 100.0 96.4 83.2 15 Unit Availability Factor 100.0 96.4 83.2 16 Unit Capacity Factor (Using MDC) 102.1 97.8 80.4 17 Unit Capacity Factor (Using Design) 101.4 97.1 79.3 18 Unit Forced Outage Rate 0.0 3.5 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refuel 15 is scheduled to start on 04/22/05 for a duration of 35 days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 501395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None I REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 V. C. Summer Station operated at full power for the entire month of November.