MONTHYEARML24059A3422024-03-31031 March 2024 Scoping Summary Report ML14276A2002014-09-23023 September 2014 Appendix K - Long-Term Radiological Impact Analysis for the No-Action Alternative ML0528003292005-10-0707 October 2005 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Nuclear Management Company, LLC for Renewal of the Operating License for Monticello Nuclear Generating Plant ML0520104982005-07-0505 July 2005 Minnesota Department of Natural Resources Web Page 2000 Minnesota Bald Eagle Survey ML0520104942005-07-0505 July 2005 the Raptor Center (University of Minnesota) - Raptor Facts Bald Eagle ML0520104762005-07-0101 July 2005 E-mail from Weathertalk - Mark Seeley'S Weekly Weather Commentary on Behalf of Mark Seeley Minnesota Weathertalk for Friday, July 1, 2005 ML0520104622005-06-25025 June 2005 EPA 8-Hour Ground-level Ozone Designations. Map of Nonattainment Areas ML0520104902005-06-0101 June 2005 June 2005 Personal Communication from E. Franklin (NMC) with D. Orr (NMC) Regarding Eagles Occupancy Information ML0520103172005-04-11011 April 2005 National Climatic Data Center - Tornados Reported in Sherburn and Wright Counties 1950-2004 ML0520104582005-04-11011 April 2005 NCDC Listing of Nonattainment Status for Each County by Year, as of April 11, 2005 ML0520104702005-02-0505 February 2005 Minnesota Pollution Control Agency, Air Quality in Minnesota, Progress and Priorities, 2005 Report to the Legislature ML0520104802005-01-31031 January 2005 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report: Covering July 1, 2004 Through December 31, 2004 Reporting Period ML0520104882004-08-26026 August 2004 8/26/04 Personal Communication from Y. Abernethy (CNS) to D. Orr (NMC) Regarding Bald Eagles on MNGP Site ML0520104782004-07-30030 July 2004 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report: Covering January 1, 2005 Through June 30, 2004 Reporting Period ML0520104852004-07-28028 July 2004 Minnesota Department of Natural Resources Letter to Y. Abernethy (CNS) Regarding Request for Natural Heritage Information for the Vicinity of Monticello Nuclear Generating Plant and Transmission Line Corridors ML0520102252004-07-0101 July 2004 2004 Resource Plan, Appendix D, Electric Utility Annual Report to the Minnesota Department of Commerce ML0520106012004-05-20020 May 2004 Calculations for Sections 2.6 and 2.9 of NMC Environmental Report by Constellation Nuclear Services ML0520105192004-01-28028 January 2004 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report #4: Covering August 3, 2003 Through December 31, 2003 Reporting Period ML0520106122004-01-0101 January 2004 Web Reference - Community Profile for Albertville, Minnesota from the Minnesota Department of Employment and Economic Development ML0520106052004-01-0101 January 2004 U.S. Census of Agricultu1987, 1992, and 1997 for Sherburne and Wright Counties, Minnesota ML0520105162003-08-27027 August 2003 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report #3: Covering February 2, 2003 Through August 2, 2003 Reporting Period ML0520106102003-06-30030 June 2003 Compare Minnesota, Profiles of Minnesota'S Economy and Population, 2002-2003, Minnesota Department of Employment and Economic Development ML0520105072003-03-0303 March 2003 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report #2: Covering August 2, 2005 Through February 2, 2003 Reporting Period ML0520104742003-01-0101 January 2003 Updated Safety Analysis Report. USAR-02.03 Section 2 Site and Environs. Revision 19 Section 2.3 Meteorology ML0520105952000-01-0101 January 2000 Web Reference - Profile of Selected Economic Characteristics for the Year 2000 for Wright and Sherburne Counties, Minnesota, U.S. Census Bureau ML0722001811973-02-0101 February 1973 Final Environmental Statement Related to the Forked River Nuclear Station Unit 1, Jersey Central Power and Light Company. Docket No. 50-363 2024-03-31
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24135A1922024-05-14014 May 2024 2022 Annual Radioactive Effluent Release Report - Errata ML24135A1912024-05-14014 May 2024 2023 Annual Radioactive Effluent Release Report L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML23291A1092023-10-23023 October 2023 Subsequent License Renewal Application Requests for Confirmation of Information Environmental Review L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report ML21133A4952021-05-13013 May 2021 2020 Annual Radiological Environmental Operating Report L-MT-21-033, 2020 Annual Radioactive Effluent Release Report2021-05-13013 May 2021 2020 Annual Radioactive Effluent Release Report L-MT-20-013, 2019 Annual Radiological Environmental Operating Report2020-05-14014 May 2020 2019 Annual Radiological Environmental Operating Report L-MT-20-014, 2019 Annual Radioactive Effluent Release Report2020-05-14014 May 2020 2019 Annual Radioactive Effluent Release Report L-MT-18-029, 2017 Annual Radiological Environmental Operating Report2018-05-10010 May 2018 2017 Annual Radiological Environmental Operating Report L-MT-17-039, 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual(Enclosure 2)2017-05-10010 May 2017 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual(Enclosure 2) L-MT-16-035, Corrections to 2011, 2012, 2013, and 2014 Annual Radiological Environmental Operating Reports2016-10-20020 October 2016 Corrections to 2011, 2012, 2013, and 2014 Annual Radiological Environmental Operating Reports L-MT-16-030, Transmittal of 2015 Annual Radiological Environmental Operating Report2016-05-12012 May 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report L-MT-16-022, Radioactive Effluent Release Report for 20152016-05-12012 May 2016 Radioactive Effluent Release Report for 2015 L-MT-16-024, Flood Hazard Reevaluation Report2016-04-21021 April 2016 Flood Hazard Reevaluation Report L-MT-15-036, 2014 Annual Radiological Environmental Operating Report2015-05-12012 May 2015 2014 Annual Radiological Environmental Operating Report ML15132A6222015-05-12012 May 2015 2014 Radioactive Effluent Release Report L-MT-14-012, 2013 Radioactive Effluent Release Report2014-05-15015 May 2014 2013 Radioactive Effluent Release Report L-MT-13-042, Submittal of 2012 Annual Radiological Environmental Operating Report2013-05-10010 May 2013 Submittal of 2012 Annual Radiological Environmental Operating Report ML13135A0122012-12-31031 December 2012 Radioactive Effluent Release Report for January 1 - December 31, 2012 L-MT-12-042, Submittal of 2011 Annual Radiological Environmental Operating Report2012-05-10010 May 2012 Submittal of 2011 Annual Radiological Environmental Operating Report L-MT-11-021, Submittal of 2010 Radioactive Effluent Release Report2011-05-12012 May 2011 Submittal of 2010 Radioactive Effluent Release Report L-MT-11-020, 2010 Annual Radiological Environmental Operating Report2011-05-12012 May 2011 2010 Annual Radiological Environmental Operating Report ML1013900582010-05-14014 May 2010 Monticello Nuclear Generating Plant - 2009 Annual Radiological Environmental Operating Report L-MT-10-032, Annual Report to the Us NRC Radiological Environmental Monitoring Program2009-12-31031 December 2009 Annual Report to the Us NRC Radiological Environmental Monitoring Program ML0920501892009-04-30030 April 2009 Parr Reservoirs Fisheries Surveys: Winter Final Report L-MT-09-036, Annual Report for the NRC, Radiological Environmental Monitoring Program, January 1 - December 31, 20082008-12-31031 December 2008 Annual Report for the NRC, Radiological Environmental Monitoring Program, January 1 - December 31, 2008 ML0915405192008-05-14014 May 2008 Enclosures 1 and 2 - Radioactive Effluent Release Report and Off-Site Radiation Dose Assessment for January 1 - December 31, 2008 L-MT-07-031, Annual Radiological Environmental Operating Report2007-04-20020 April 2007 Annual Radiological Environmental Operating Report ML0612806172006-05-0404 May 2006 2005 Annual Radiological Environmental Operating Report ML0612902442005-12-31031 December 2005 Radioactive Effluent Release Report for January 1 - December 31, 2005 ML0532605652005-11-30030 November 2005 November 2005 Mississippi River Mussel Survey Summary Prepared by Nuclear Management Company, LLC L-MT-05-042, ODCM-APP-C, Rev 0, Appendix C.2005-05-0909 May 2005 ODCM-APP-C, Rev 0, Appendix C. L-MT-05-041, 2004 Annual Radiological Environmental Operating Report2005-04-29029 April 2005 2004 Annual Radiological Environmental Operating Report ML0520103862005-03-30030 March 2005 Xcel Energy'S Air Emission Inventory Reports for 2004 to the Minnesota Pollution Control Agency ML0520104802005-01-31031 January 2005 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report: Covering July 1, 2004 Through December 31, 2004 Reporting Period ML0520103272004-12-31031 December 2004 Offsite Radiation Dose Assessment for January 1 - December 31, 2004 for Monticello Nuclear Generating Plant ML0532605692004-12-31031 December 2004 Minnesota Statewide Mussel (Bivalvia: Unionidae) Survey: 2003-2004 ML0520103032004-10-0505 October 2004 Letter from Minnesota Pollution Control Agency to Xcel Energy Forwarding Summary of Pollutant Emissions for 2003 ML0520104782004-07-30030 July 2004 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report: Covering January 1, 2005 Through June 30, 2004 Reporting Period L-MT-04-030, 2003 Annual Radiological Environmental Operating Report2004-05-14014 May 2004 2003 Annual Radiological Environmental Operating Report ML0520102422004-04-24024 April 2004 U.S. EPA Green Book - Nonattainment Status for Each County by Year from the Monticello Environmental Site Audit ML0520103002004-03-30030 March 2004 Xcel Energy'S 2003 Air Emission Inventory Reports to the Mn Pollution Control Agency ML0520105192004-01-28028 January 2004 Xcel Energy/Usfws Avian Protection Memorandum of Understanding, Semi-Annual Report #4: Covering August 3, 2003 Through December 31, 2003 Reporting Period ML0520105082004-01-0101 January 2004 Environmental Monitoring Program: 2002 - 2003 Report ML0520103072003-12-31031 December 2003 Offsite Radiation Dose Assessment for January 1 - December 31, 2003 for Monticello Nuclear Generating Plant ML0520102992003-10-0606 October 2003 Letter from Minnesota Pollution Control Agency to Xcel Energy Forwarding Summary of Pollutant Emissions for 2002 2024-05-14
[Table view] |
Text
Xcel Energy/USFWS Avian Protection Memorandum Of Understanding Semi-Annual Report #3 August 27, 2003 Covering February 2, 2003 through August 2, 2003 Reporting Period -
On April 19, 2002, Xcel Energy and the USFWS entered into a Memorandum of Understanding (MOU) to establish procedures and policies to be employed by the Company's operating companies and the Service in dealing with migratory birds that may be present, injured or killed on the Company's property during the period of this MOU.
As part of the agreement, Xcel Energy agreed to file a report three months and two weeks after the date of the execution of this MOU to the Service compiling the information described above in the MOU, which occurred during the initial three-month period. The Company submitted the first report on August 2, 2002 on. One report is submitted on behalf of all the operating companies that signed the MOU every six months.
- 1. Status of the Development and Implementation of an Avian Protection Plan (APP)
EDM International, Inc. continues to gather data for the development of the APP for PSCo and CLFP. Approximately 90% of the surveys are complete and a draft APP is expected to be completed by the end of 2003. Xcel Energy staff will be reviewing the draft report this fall to develop the Company's plans for implementing the approved EDM recommendations.
)
As reported previous, Xcel Energy will start development of the APP's for the remainder of the service companies in 2003, but have proposed to the Service that those APP's will not be fully developed until the PSCo APP is finalized. This will allow us to develop.
one APP, work out issues and have the format available to promptly complete the remaining APP's. We plan to go out for bid on the rest of the APP work this winter.
Regardless of the completion date of the APP's, Xcel Energy has implemented a training program for all electric delivery field personnel that may encounter birds. In addition, the final stages of the development of a bird poster is underway for additional education for Xcel Energy employees. Xcel Energy is working on these issues and is in compliance with Section 4.A. of the other MOUs.
- 2. Status of Special Purpose Permit Xcel Energy has filed applications for special purpose permits for all of the operating companies. Special Purpose permits have been issued by Region 3 for Northern States Power Company - Minnesota (Permit MB074020-0) and Northern States Power
Xcel Energy/USFWS Avian Protection Memorandum Of Understanding Semi-Annual Report #3 August 27, 2003 Company - Wisconsin (Permit MB074019-0) The other applications are currently under review by the respective USFWS Migratory Bird Offices.
- 3. Summary of Avian Injuries None reported
- 4. Summary of Avian Deaths The following table summarizes avian deaths that have occurred since August 2, 2002.
Specific details of an incident can be provided upon request.
Operating Description Date Comments Company SPS Two dead Great 02/17/03 The structure was modified on 02/20/03 and included:
Homed Owls, electrocuted on a 1. Replacing 8' crossarms with 12' crossanms.
pole containing three 2. Installation of new arresters with animal guard protection.
transformers, near 3. Installation of insulating tubing on all primary risers.
Dumas, Texas. 4. Installation of one animal guard on each transformer.
SPS Dead eagle at 02118/03 USFW initially notified on 02/18. On 03/07/03, a line crew structure near replaced the 8' arm on the structure where the raptor was Stinnett TX. found with a 10' arm and installed Bird Spikes as per G-19 &
G-25 of Xcel Energy's Design And Construction Standards.
SPS Red Tailed Hawk 03/11/03 USFW initially notified on 03/12. Modifications, performed in electrocution on utility May, included adding two animal guards on the bushings and pole in Chaves insulation tape to the primary risers. Cost of the project was County, near Roswell, estimated to be $200 New Mexico.
SPS Great Homed owl 03/27/03 USFW initially notified on 03/28. Modifications, performed in near Borger, Texas. May, included replacing the primary jumpers on the OCR with insulated jumpers. Animal guards were also installed on all primary bushings. It was unknown exactly where the owl made contact at the time of discovery, but it did appear the only animal guard on the center phase was blackened.
Cost of the project was estimated to be $538. 35.
SPS A juvenile Great 06/01/03 USFW initially notified on 06/06. It was discovered that there Homed Owl was was a Great Homed Owl nesting three juveniles, on the discovered ground, at the substation. The remaining owls have since left electrocuted at the the substation. No further actions performed.
Potash Junction Substation, 20 miles east of Carlsbad, New Mexico.
SPS Crow at substation 06/12103 Electrocution resulted in a 28-minute outage affecting 2,400 near Clovis, New I _ I customers. The cause was a crow that came in contact with Page 2 of 4
Xcel Energy/USFWS Avian Protection Memorandum Of Understanding Semi-Annual Report #3 August 27, 2003 Operating Description Date Comments Company ;.
Mexico. energized equipment in a 23-kilovolt substation; after the crow carcass was removed, station was re-energized. No further actions performed.
SPS Great Horned Owl at 07/30/03 Probable source of electrocution is 25 kva transformer.
TUCO Interchange Modifications of the structure are pending.
near Abernathy, Texas.
PSCo Bald Eagle at Rifle 01/15/03 Appears to have been electrocuted. Seven structures within Falls Hatchery the Hatchery were retrofitted. No outage reported.
PSCo Bald Eagle at Rifle 02/28/03 Appears to have been hit by vehicle. Seven structures within Falls Hatchery the Hatchery were retrofitted. No outage reported.
PSCo Crow at 86n' and 04/21/03 Electrocuted on pole mounted switch. Structure was Roslyn retrofitted to prevent future takings. No outage reported.
PSCo Red Tailed Hawk at 05/09/03 Appears that electrocution occurred when hawk landed to Ennis Substation roost. Required retrofits are being determined. No outage reported.
PSCo Golden Eagle near 05/11/03 Electrocution occurred on modified 69kV line. Investigation Rifle Colorado being performed. One and one half hour outage reported.
NSPMN Bald Eagle near 6/3/03 Electrocution occurred when bird tried to fly through Monticello, MN distribution line while carrying mallard. Bird made phase-to-phase contact. Unknown person removed carcass. No plans to modify line since it appears to be unusual occurrence.
. USFWS and MDNR notified.
NSPM Red Tail Hawk at 8/1/03 Hawk electrocuted on pole. Xcel pursuing measures to Sherco Power plant insulate wires. USFWS notified.
- 5. Summary of Migratory Bird Nest Removals A. Active Migratorv Bird Nests Non-Emeroency Removals None have been reported.
B. Active Nests Of Non-Endangered/Threatened. Non-eagle MigratorV Birds-Emergency Removals Operating Description Date Comments Comrany PSCo Relocated osprey 5/02/03 Depredation permit acquired from USFWS prior to nest near Debeque, relocation.
Colorado water treatment plant. II Page 3 of 4
. I; drsn)
Xcel Energy/USFWS Avian Protection Memorandum Of Understanding Semi-Annual Report #3 August 27, 2003 C. Inactive Nests of Non-listed. Non-eagle Migratory Birds -Emergency Removal Operating Description Date Comments Company PSCo Removed inactive 06/16/03 Contacted USFWS prior to removal. Retrofit osprey nest located performed to eliminate future nesting attempts.
on transmission structure near Dillon Reservoir in Colorado.
NSPM Removed inactive 4/23/03, All nests were removed as they were being built--prior osprey nest located 5/2103, to eggs being laid. Local crews and designers working.
on transmission 5/20/03, with Three Rivers Park District to put up a platform to structure located in 5/27/03 attract pair to different location. Local Xcel Energy Orono, MN engineer will continue to monitor situation. This is the same nest that was discussed in the last report.
NSPW Removed inactive 3/27/03 Nest was unoccupied.
raven's nest from substation in Ino, WI D. Endangered/Threatened Migratory Bird Nest Removals No removals have been reported
- 6. Eagle Permits No requests have been filed.
- 7. Summary of Record-Keeping Procedures Xcel Energy is currently developing record keeping procedures. Each contact for the operating companies is coordinating contacts and reports. Once the special purpose permits are acquired, final procedures will be completed.
The next report will be submitted to the Service in six months (within 30 days following March 3, 2004.)
Page 4 of 4