Forwards Proposed Schedule for Providing Info to Close Draft SER Confirmatory Issues,Per 820125 Request
ML20040F027
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/27/1982
From: Wuller G
ILLINOIS POWER CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
U-0408, U-408, NUDOCS 8202080222
Download: ML20040F027 (5)


Text

~

C t

P hECElv59 ,

U-0408 a zu Nb ,b LO3-82(01-27)-6 CW 5M f/

January 27, 1982 4/t 'I si g TO: J. R. Miller, Chief NRC Standardization & Special Projects Branch FROM: G. E. Wuller Illinois Power Company , /[.27

Reference:

Telecopy 1/25/82, Informal memo J. R. Miller, NRC to G. E._Wuller, IP , subj ect : Draft SER Confirmatory Issues Subj ect: Clinton Power Station Unit 1 Docket No. 50-461 Clinton-SER Confirmatory Information In response to the informal request (reference memo), attached is the IP proposed schedule for providing information to close the Clinton SER confirmatory issues.

GEW/lt ,

OD

.s I(

~ ~ ~

.8202080222 820127

-PDR ADOCK 05000461

~ ., -. .- _ f DR ,_, , - _ _ , , , , ,, __ _- .

o Page 1 of 4 2 1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information f Clinton SER Confirmatory Issue No. Subject Completion Date (1). Emergency preparedness meteorological program *

(2) Inspection program around the UHS and the main cooling lake dam 2/16/82 (3) Protection of UHS dam abutments against soil erosion *

(4) Internally generated missiles - fan failure 4/4/82 (5) Protection against -postulated piping failures 1/1/83 (6) Design adequacy of cable tray system- 2/3/82 (7) Containment ultimate strength analysis 5/1/82 (8) Structural integrity of safety-related masonry walls 12/15/82 (9) NSSF pipe break analysis using SRP criteria 1/1/83 (10) Vibration assessment of RPV internals 7/1/82 (11) Annulus pressurization loads (LOCA asymmetric loads) 7/1/82 (12) Use of SRSS for combining Mark III dynamic responses for other than LOCA and SSE *

(13) I&E Bulletin 79-02 regarding support baseplate flexibility 2/5/82 (14) Separation of low-pressure systems from RCS valves *

(15) Mark III hydrodynamic loads *

(16) Feedwater check valve analysis 4/5/82 (17) Seismic and LOCA loadings on fuel assemblies 7/1/82 (18) Scram discharge system evaluation Prior to startup

~following 1st fuel '

reload (19) Fracture toughness data 3/1/82 (20) Organic materials

  • i

~

Page 2 ofL4- ,

1/27/82 .

Illinois: Power Schedule for Clinton SER Confirmstory Information #

-Clinton SER Confirmatory Issue No. Subj ect . Completion Date

.(21) Subcompartment pressure analysis '2/12/82 (22).~ Steam bypass of the suppression pool *

(23) Combustible gas control 12/15/82

~\ (24) Containment isolation dependability 5/14/82 (25) Containment monitoring 12/15/82 (26) Plant-specific LOCA analysis 7/1/82 (27) High'drywell pressure interlock 3/31/82 (28)' ATWS recirculation pump trip 8/1/82 (29) Response time testing 7/1/82 (30) Analog trip modules and optical isolators *

'(31) Susceptibility of the NSPS to. electrical noise *

(32) Modification of ADS logic '9/3/82 (33) Restart of low pressure systems 9/3/82 (34) Temperature effects of level measurements 12/15/82 (35) Containment atmosphere monitoring system 12/15/82 (36) Verification that testing is in accordance with BTP-PSB-1 12/1/82

-(37) Electrical drawing review *

(38) ' Verification of diesel generator testing 10/1/82 l'

(39) Class A supervision and power supply for fire detection system 5/1/82 (40) Moisture in air starting system *

(41) Turbocharger gear drive problem

  • 1

Page 3 of 4 ,

1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information Clinton SER Confirmatory Issue No. Subject Completion Date (42) Automatic prelube *

(43) Testing, no load, and light-load operation *

(44) Tornado missile protection *

(45) Circulating water system 3/1/82 (46) Initial test program *

(47) -Deleted by NRC- *

(48) Use of nonsafety-grade equipment in shaft seizure event CPS-SER Sec. 15.2 says "This is Acceptable".

(49) Human engineering aspects of control room design I.D.1 *

(50) Financial qualifications *

'(51) Common reference for reactor vessel level instruments, II.K.3.27 12/15/82 (52) Shielding design review, II.B.2 3/1/82 (53) Short-term accident & procedures review, I.C.1, I.C.7, I.C.8 7/3/82 (54) Training during low-power testing, I.G.1 9/1/82 (55) Plant shielding, II.B.2 3/1/82 (56) Review ESF valves, II.K.1.5 12/15/82 (57) Operability status, II.K.1.10 12/15/82 (58) HPCI and RCIC initiation levels, II.K.3.13 12/15/82 (59) Isolation of HPCI and RCIC, II.K.3.15 12/15/82 (60) Qualification of ADS accumulators, II.K.3.28 *

(61) Plant-specific analysis, II.K.3.31 7/1/82 (62) ODYN analysis for River Bend as applied to Clinton 3/1/82 (63) Conformance evaluation report for the loose parts monitoring ..

system 3/1/82

Page 4 of'4 .,

1/27/82 .

Illinoi" Power Schedule for Clinton SER Confirmatory Information' Clinton SER Confirmatory Issue No. Subject Completion Date-(64) Requirements of NUREG-0313 *

(65) Control room habitability - chlorine gas -3/1/82 (66)- Long-term pressure response *

(67) Containment design external differential pressure *

.(68) Kuosheng data for SRV quencher design 4/5/82 (69) ' Debris screen design *

(70) Verification of adequacy of fire protection systems .6/1/82 (71) Flood-proof door 3/1/82 (72) Valves in fire protection water supply system 3/1/82 (73) Break in water supply piping *

(74) Test data on fire ratings. *

(75) Three-hour-fire-rated. penetration seals *

(76) . Install fire protection equipment *

(77). Fire protection administrative controls and training 10/3/82 a (78) Technical Specification on fire protection 10/3/82' (79) Periodic leak testing of pressure isolation valves *

  • Information req'd has been provided to NRC