C t

hECElv59 P

Nb

,b U-0408 a zu 5M f/

LO3-82(01-27)-6 CW January 27, 1982 4

/t

'I si g

TO:

J. R. Miller, Chief NRC Standardization & Special Projects Branch FROM:

G. E. Wuller

/[.27 Illinois Power Company,

Reference:

Telecopy 1/25/82, Informal memo J. R. Miller, NRC to G. E._Wuller, IP, subj ect :

Draft SER Confirmatory Issues Subj ect:

Clinton Power Station Unit 1 Docket No. 50-461 Clinton-SER Confirmatory Information In response to the informal request (reference memo), attached is the IP proposed schedule for providing information to close the Clinton SER confirmatory issues.

GEW/lt OD

.s I(

.8202080222 820127

~ ~ ~

-PDR ADOCK 05000461

~

.- f DR

o Page 1 of 4 2

1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information f

Clinton SER Confirmatory Issue No.

Subject Completion Date (1).

Emergency preparedness meteorological program (2)

Inspection program around the UHS and the main cooling lake dam 2/16/82 (3)

Protection of UHS dam abutments against soil erosion (4)

Internally generated missiles - fan failure 4/4/82 (5)

Protection against -postulated piping failures 1/1/83 (6)

Design adequacy of cable tray system-2/3/82 (7)

Containment ultimate strength analysis 5/1/82 (8)

Structural integrity of safety-related masonry walls 12/15/82 (9)

NSSF pipe break analysis using SRP criteria 1/1/83 (10)

Vibration assessment of RPV internals 7/1/82 (11)

Annulus pressurization loads (LOCA asymmetric loads) 7/1/82 (12)

Use of SRSS for combining Mark III dynamic responses for other than LOCA and SSE (13)

I&E Bulletin 79-02 regarding support baseplate flexibility 2/5/82 (14)

Separation of low-pressure systems from RCS valves (15)

Mark III hydrodynamic loads (16)

Feedwater check valve analysis 4/5/82 (17)

Seismic and LOCA loadings on fuel assemblies 7/1/82 (18)

Scram discharge system evaluation Prior to startup

~following 1st fuel '

reload (19)

Fracture toughness data 3/1/82 (20)

Organic materials i

~

Page 2 ofL4-1/27/82 Illinois: Power Schedule for Clinton SER Confirmstory Information

-Clinton SER Confirmatory Issue No.

Subj ect

. Completion Date

.(21)

Subcompartment pressure analysis

'2/12/82 (22).~

Steam bypass of the suppression pool (23)

Combustible gas control 12/15/82

~\\

(24)

Containment isolation dependability 5/14/82 (25)

Containment monitoring 12/15/82 (26)

Plant-specific LOCA analysis 7/1/82 (27)

High'drywell pressure interlock 3/31/82 (28)'

ATWS recirculation pump trip 8/1/82 (29)

Response time testing 7/1/82 (30)

Analog trip modules and optical isolators

'(31)

Susceptibility of the NSPS to. electrical noise (32)

Modification of ADS logic

'9/3/82 (33)

Restart of low pressure systems 9/3/82 (34)

Temperature effects of level measurements 12/15/82 (35)

Containment atmosphere monitoring system 12/15/82 (36)

Verification that testing is in accordance with BTP-PSB-1 12/1/82

-(37)

Electrical drawing review (38)

' Verification of diesel generator testing 10/1/82 l'

(39)

Class A supervision and power supply for fire detection system 5/1/82 (40)

Moisture in air starting system (41)

Turbocharger gear drive problem 1

Page 3 of 4 1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information Clinton SER Confirmatory Issue No.

Subject Completion Date (42)

Automatic prelube (43)

Testing, no load, and light-load operation (44)

Tornado missile protection (45)

Circulating water system 3/1/82 (46)

Initial test program (47)

-Deleted by NRC-(48)

Use of nonsafety-grade equipment in shaft seizure event CPS-SER Sec. 15.2 says "This is Acceptable".

(49)

Human engineering aspects of control room design I.D.1 (50)

Financial qualifications

'(51)

Common reference for reactor vessel level instruments, II.K.3.27 12/15/82 (52)

Shielding design review, II.B.2 3/1/82 (53)

Short-term accident & procedures review, I.C.1, I.C.7, I.C.8 7/3/82 (54)

Training during low-power testing, I.G.1 9/1/82 (55)

Plant shielding, II.B.2 3/1/82 (56)

Review ESF valves, II.K.1.5 12/15/82 (57)

Operability status, II.K.1.10 12/15/82 (58)

HPCI and RCIC initiation levels, II.K.3.13 12/15/82 (59)

Isolation of HPCI and RCIC, II.K.3.15 12/15/82 (60)

Qualification of ADS accumulators, II.K.3.28 (61)

Plant-specific analysis, II.K.3.31 7/1/82 (62)

ODYN analysis for River Bend as applied to Clinton 3/1/82 (63)

Conformance evaluation report for the loose parts monitoring system 3/1/82

Page 4 of'4 1/27/82 Illinoi" Power Schedule for Clinton SER Confirmatory Information' Clinton SER Confirmatory Issue No.

Subject Completion Date-(64)

Requirements of NUREG-0313 (65)

Control room habitability - chlorine gas

-3/1/82 (66)-

Long-term pressure response (67)

Containment design external differential pressure

.(68)

Kuosheng data for SRV quencher design 4/5/82 (69)

' Debris screen design (70)

Verification of adequacy of fire protection systems

.6/1/82 (71)

Flood-proof door 3/1/82 (72)

Valves in fire protection water supply system 3/1/82 (73)

Break in water supply piping (74)

Test data on fire ratings.

(75)

Three-hour-fire-rated. penetration seals (76)

. Install fire protection equipment (77).

Fire protection administrative controls and training 10/3/82 (78)

Technical Specification on fire protection 10/3/82' a

(79)

Periodic leak testing of pressure isolation valves

  • Information req'd has been provided to NRC

.g l

i

+

e