LO3-82(01-27)-6 CW January 27, 1982 4
/t
'I si g
TO:
J. R. Miller, Chief NRC Standardization & Special Projects Branch FROM:
G. E. Wuller
/[.27 Illinois Power Company,
Reference:
Telecopy 1/25/82, Informal memo J. R. Miller, NRC to G. E._Wuller, IP, subj ect :
Draft SER Confirmatory Issues Subj ect:
Clinton Power Station Unit 1 Docket No. 50-461 Clinton-SER Confirmatory Information In response to the informal request (reference memo), attached is the IP proposed schedule for providing information to close the Clinton SER confirmatory issues.
GEW/lt OD
.s I(
.8202080222 820127
~ ~ ~
-PDR ADOCK 05000461
~
.- f DR
o Page 1 of 4 2
1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information f
Clinton SER Confirmatory Issue No.
Subject Completion Date (1).
Emergency preparedness meteorological program (2)
Inspection program around the UHS and the main cooling lake dam 2/16/82 (3)
Protection of UHS dam abutments against soil erosion (4)
Internally generated missiles - fan failure 4/4/82 (5)
Protection against -postulated piping failures 1/1/83 (6)
Design adequacy of cable tray system-2/3/82 (7)
Containment ultimate strength analysis 5/1/82 (8)
Structural integrity of safety-related masonry walls 12/15/82 (9)
NSSF pipe break analysis using SRP criteria 1/1/83 (10)
Vibration assessment of RPV internals 7/1/82 (11)
Annulus pressurization loads (LOCA asymmetric loads) 7/1/82 (12)
Use of SRSS for combining Mark III dynamic responses for other than LOCA and SSE (13)
I&E Bulletin 79-02 regarding support baseplate flexibility 2/5/82 (14)
Separation of low-pressure systems from RCS valves (15)
Mark III hydrodynamic loads (16)
Feedwater check valve analysis 4/5/82 (17)
Seismic and LOCA loadings on fuel assemblies 7/1/82 (18)
Scram discharge system evaluation Prior to startup
~following 1st fuel '
reload (19)
Fracture toughness data 3/1/82 (20)
Organic materials i
~
Page 2 ofL4-1/27/82 Illinois: Power Schedule for Clinton SER Confirmstory Information
-Clinton SER Confirmatory Issue No.
Subj ect
. Completion Date
.(21)
Subcompartment pressure analysis
'2/12/82 (22).~
Steam bypass of the suppression pool (23)
Combustible gas control 12/15/82
~\\
(24)
Containment isolation dependability 5/14/82 (25)
Containment monitoring 12/15/82 (26)
Plant-specific LOCA analysis 7/1/82 (27)
High'drywell pressure interlock 3/31/82 (28)'
ATWS recirculation pump trip 8/1/82 (29)
Response time testing 7/1/82 (30)
Analog trip modules and optical isolators
'(31)
Susceptibility of the NSPS to. electrical noise (32)
Modification of ADS logic
'9/3/82 (33)
Restart of low pressure systems 9/3/82 (34)
Temperature effects of level measurements 12/15/82 (35)
Containment atmosphere monitoring system 12/15/82 (36)
Verification that testing is in accordance with BTP-PSB-1 12/1/82
-(37)
Electrical drawing review (38)
' Verification of diesel generator testing 10/1/82 l'
(39)
Class A supervision and power supply for fire detection system 5/1/82 (40)
Moisture in air starting system (41)
Turbocharger gear drive problem 1
Page 3 of 4 1/27/82 Illinois Power Schedule for Clinton SER Confirmatory Information Clinton SER Confirmatory Issue No.
Subject Completion Date (42)
Automatic prelube (43)
Testing, no load, and light-load operation (44)
Tornado missile protection (45)
Circulating water system 3/1/82 (46)
Initial test program (47)
-Deleted by NRC-(48)
Use of nonsafety-grade equipment in shaft seizure event CPS-SER Sec. 15.2 says "This is Acceptable".
(49)
Human engineering aspects of control room design I.D.1 (50)
Financial qualifications
'(51)
Common reference for reactor vessel level instruments, II.K.3.27 12/15/82 (52)
Shielding design review, II.B.2 3/1/82 (53)
Short-term accident & procedures review, I.C.1, I.C.7, I.C.8 7/3/82 (54)
Training during low-power testing, I.G.1 9/1/82 (55)
Plant shielding, II.B.2 3/1/82 (56)
Review ESF valves, II.K.1.5 12/15/82 (57)
Operability status, II.K.1.10 12/15/82 (58)
HPCI and RCIC initiation levels, II.K.3.13 12/15/82 (59)
Isolation of HPCI and RCIC, II.K.3.15 12/15/82 (60)
Qualification of ADS accumulators, II.K.3.28 (61)
Plant-specific analysis, II.K.3.31 7/1/82 (62)
ODYN analysis for River Bend as applied to Clinton 3/1/82 (63)
Conformance evaluation report for the loose parts monitoring system 3/1/82
Page 4 of'4 1/27/82 Illinoi" Power Schedule for Clinton SER Confirmatory Information' Clinton SER Confirmatory Issue No.
Subject Completion Date-(64)
Requirements of NUREG-0313 (65)
Control room habitability - chlorine gas
-3/1/82 (66)-
Long-term pressure response (67)
Containment design external differential pressure
.(68)
Kuosheng data for SRV quencher design 4/5/82 (69)
' Debris screen design (70)
Verification of adequacy of fire protection systems
.6/1/82 (71)
Flood-proof door 3/1/82 (72)
Valves in fire protection water supply system 3/1/82 (73)
Break in water supply piping (74)
Test data on fire ratings.
(75)
Three-hour-fire-rated. penetration seals (76)
. Install fire protection equipment (77).
Fire protection administrative controls and training 10/3/82 (78)
Technical Specification on fire protection 10/3/82' a
(79)
Periodic leak testing of pressure isolation valves
- Information req'd has been provided to NRC
.g l
i
+
e