ML110040797

From kanterella
Revision as of 10:29, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-305
ML110040797
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040797 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR 0

5 10 B- 1082 B- 1082 B- 1076 15 B- 1072 B- 1074 B- 1008 B- 1001 20 B- 1074 B- 1072 25 Depth bgs (ft) of Center of Cavity B- 1072 30 35 40 B- 1052 45 50 55 Boring Location B- 1052 Outside power block construction zone (PBCZ) 60 Unit 4 area (SE half of PBCZ) 65 Unit 3 area (NW half of PBCZ) 70 0 2 4 6 8 10 Length of Cavity Encountered in Borehole Axis (ft)

Note: Boring numbers are shown for selected larger cavities BLN COL 2.5-1 BLN COL 2.5-5 FIGURE 2.5-305 Cavity Depth and Size D-35A Rev 0