ML110040889

From kanterella
Revision as of 09:42, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 13 Figure 13.1-202
ML110040889
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040889 (1)


Text

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR Plant Manager Manager, Operations Assistant Operations Manager, Shift (SRO)

Shift Manager Shift Manager (SRO-1) (SRO-1)

Supervisor, Shift Technical Health Physics Chemistry Supervisor, On Shift Advisor** Technician Technician On-shift (SRO-1) (1) (1) (1) (SRO-1)

NLO/Auxilliary NLO/Auxilliary Reactor Operator Reactor Operator Operator Operator (RO-2) (RO-2)

(NLO-5) (NLO-5)

Unit 3 Shared Unit 4

    • may be met by onshift combined SRO/STA SRO - licensed senior reactor operator RO - licensed reactor operator NLO - non-licensed operator Shift Manning - 5 shifts (minimum)

(No.) - indicate number of positions per shift FIGURE 13.1-202 BLN COL 13.1-1 Shift Operations Rev 0